0% found this document useful (0 votes)
47 views1 page

Existing Operational Network: R Bus Future Integrated Transportation Hub

This document provides an overview of the existing and upcoming public transportation network in Malaysia. The existing network includes rail lines like the KTM Komuter, LRT, MRT and monorail. An upcoming BRT line is scheduled to begin operations in Q4 2017 to connect Klang to other parts of the Klang Valley. Several future projects are also noted like extensions to existing rail lines and a new BRT line connecting Klang. The integrated transportation hub aims to better connect existing and future lines to improve public transportation in Malaysia.

Uploaded by

sinsin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Existing Operational Network: R Bus Future Integrated Transportation Hub

This document provides an overview of the existing and upcoming public transportation network in Malaysia. The existing network includes rail lines like the KTM Komuter, LRT, MRT and monorail. An upcoming BRT line is scheduled to begin operations in Q4 2017 to connect Klang to other parts of the Klang Valley. Several future projects are also noted like extensions to existing rail lines and a new BRT line connecting Klang. The integrated transportation hub aims to better connect existing and future lines to improve public transportation in Malaysia.

Uploaded by

sinsin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EXISTING OPERATIONAL NETWORK

(Provisional)

ITT Sg. Buloh


(Provisional)

BUS RAPID TRANSIT LINE

*
UPCOMING NETWORK

Q4 2017

Future Project

BATU SEBELAS
CHERAS
(Provisional)

JERNIH

STADIUM

(Provisional)
TECHNOLOGY
PARK
(Provisional)

(Provisional)
IOI MALL

&

*NOTE : KTM Skypark Line, LRT 3 Bandar Utama - Klang Line, MRT Sg. Buloh - Putrajaya Line and BRT Klang Line projects
will be operationalised in the future.

www.spad.gov.my www.facebook.com/SPAD.my www.twitter.com/SPADchannel @spadmalaysia


Publish date: July 2017

R Bus Future Integrated


Transportation Hub

You might also like