Check list for Waterproofing system and roof finishes
guru MDecember 24,2016 CIVIL CONSTRUCTION Comments
Check list for Waterproofing system and roof finishes
Click here to download your free checklist
C=
37-water-proofing
37-water-proofing
COMPANY NAME
Project Quality Plan (PQP)
Project No. Project Name Project detail/ Location
Check list for Water Proofing System and Roof Finishes
Sheet
Location:
No.
s.
No. Points o be verified Yes | No NIA | Remarks
lo.
1 Approval of Specialized Sub contractor
2 | Approval of material and availability at site
3 Internal side plastering of parapet wall is completed
Upstands and pedestals etc. are completed along with triangular
4
fillets
5 Surface of screed is smooth / clean and without any pointed edges
fg __ Sfo0ve on vertical surface for termination of water proofing
completed
7 | Surface to be waterproofed is fully dry and free from dust / dirt
8 Quality of material is checked like material is not very old ete.
hitpiivitraining nicheck-st-or-waterprooting-system-andoot-fnishos! 4271082018
‘Check Ist for Waterproofing system and roo! finishes - CIVIL TRAINING FOR YOUNG ENGINEERS:
9 | Laying of water proofing commenced from the lowest point to ensure
weather overlaps
to Stffcient caps are given and torch is applied tothe total surface of
the membrane for better adhesion
11 Check for bubbles is made and rectified if any
12 | Dressing to gargoyles/rwp is done as per specification
1g Hasthe check for damages, if any in water proofing membrane been
cartied out before flood test
14 Has the flood test been carried out for 24 hours
15 Protection to membrane is provided
16 50mm thick insulation is laid on membrane with proper joints
17 Quality of insulation board is as per specification
18 Geotextile mambrane is as per approval
19 Roof Terrazzo tiles are as per approval
20 | Tiles are laid to slope and as per specs.
21 Contraction joints are as per specs.
M&E Co-ordination for Roof water proofing and roof finishes
s.
No. Points o be verified Yes | No NIA | Remarks
1 Allmechanical / electrical / ac conduits / ducts are in place
2 AC sub contractor has checked foundation, pedestals and approval
obtained
3 Installation of rain water outlet as per drawing & specs.
4 | Lightning protection is as per drawing
Other special requirements/Remarks:
NAME SIGNATURE DATE
Site Engineer
hitpiivitraining nicheck:st-or-waterprooting-system-and-oot-fnishos!
28271082018 ‘Check list for Waterproofing system and roo! finishes - CIVIL TRAINING FOR YOUNG ENGINEERS.
MEP Engineer
Project Engineer
Project Manager
HSEQ
QAIQC Incharge
Building)
hitpiivitraining nicheck:st-or-waterprooting-system-andoot-fnishos!
38