100% found this document useful (1 vote)
311 views3 pages

Waterproofing Checklist1

Waterproofing Checklist1

Uploaded by

gaurav522chd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
311 views3 pages

Waterproofing Checklist1

Waterproofing Checklist1

Uploaded by

gaurav522chd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
271082018 ‘Check list for Waterproofing system and roo! finishes - CIVIL TRAINING FOR YOUNG ENGINEERS: CIVIL TRAINING FOR YOUNG ENGINEERS (We Change Fresh To Experience) Check list for Waterproofing system and roof finishes guru MDecember 24,2016 CIVIL CONSTRUCTION Comments Check list for Waterproofing system and roof finishes Click here to download your free checklist C= 37-water-proofing 37-water-proofing COMPANY NAME Project Quality Plan (PQP) Project No. Project Name Project detail/ Location Check list for Water Proofing System and Roof Finishes Sheet Location: No. s. No. Points o be verified Yes | No NIA | Remarks lo. 1 Approval of Specialized Sub contractor 2 | Approval of material and availability at site 3 Internal side plastering of parapet wall is completed Upstands and pedestals etc. are completed along with triangular 4 fillets 5 Surface of screed is smooth / clean and without any pointed edges fg __ Sfo0ve on vertical surface for termination of water proofing completed 7 | Surface to be waterproofed is fully dry and free from dust / dirt 8 Quality of material is checked like material is not very old ete. hitpiivitraining nicheck-st-or-waterprooting-system-andoot-fnishos! 4 271082018 ‘Check Ist for Waterproofing system and roo! finishes - CIVIL TRAINING FOR YOUNG ENGINEERS: 9 | Laying of water proofing commenced from the lowest point to ensure weather overlaps to Stffcient caps are given and torch is applied tothe total surface of the membrane for better adhesion 11 Check for bubbles is made and rectified if any 12 | Dressing to gargoyles/rwp is done as per specification 1g Hasthe check for damages, if any in water proofing membrane been cartied out before flood test 14 Has the flood test been carried out for 24 hours 15 Protection to membrane is provided 16 50mm thick insulation is laid on membrane with proper joints 17 Quality of insulation board is as per specification 18 Geotextile mambrane is as per approval 19 Roof Terrazzo tiles are as per approval 20 | Tiles are laid to slope and as per specs. 21 Contraction joints are as per specs. M&E Co-ordination for Roof water proofing and roof finishes s. No. Points o be verified Yes | No NIA | Remarks 1 Allmechanical / electrical / ac conduits / ducts are in place 2 AC sub contractor has checked foundation, pedestals and approval obtained 3 Installation of rain water outlet as per drawing & specs. 4 | Lightning protection is as per drawing Other special requirements/Remarks: NAME SIGNATURE DATE Site Engineer hitpiivitraining nicheck:st-or-waterprooting-system-and-oot-fnishos! 28 271082018 ‘Check list for Waterproofing system and roo! finishes - CIVIL TRAINING FOR YOUNG ENGINEERS. MEP Engineer Project Engineer Project Manager HSEQ QAIQC Incharge Building) hitpiivitraining nicheck:st-or-waterprooting-system-andoot-fnishos! 38

You might also like