6/24/2010 http://www.iitkgp.ac.
in/topfiles/acadcal…
ACADEMIC CALENDAR FOR 2010-2011
EVENT DATE DAY
CONVOCATION 17.07.2010 Saturday
AUTUMN SEMESTER (REGISTRATION)
(a)MBA/MCP - 3rd Semester (Project), 07.05.2010 Friday
(b)Dual Degree V Year (2005 batch) 19.05.2010 Wednesday
(c)PG II Year/MMST (II/III Year)/LLB(II/III Year) 19.05.2010 Wednesday
(d)UG I Year (all courses) 22.07.2010 Thursday
(e)UG II - V Year, MSc (Integrated) II - V Year and MSc (2-Year) II
19.07.2010 Monday
Year
(f)PG I Year (all courses), MSc (2-year) I Year and LLB I Year 20.07.2010 Tuesday
21.07.2010 to Wednesday
(f)MS and PhD
23.07.2010 to Friday
Institute Foundation Day * 18.08.2010* Wednesday
Mid Autumn Semester Examination 13.09.2010 to Monday to
(for all courses/classes) 20.09.2010 Monday
Last date for assigning Project to UG students:
(i) B.Tech (H) students of 6th and 8th semester and Dual Degree
06.10.2010 Wednesday
students of 10th semester
(ii)MSc (Integrated) students of 10th Semester and MSc (2-Year)
06.10.2010 Wednesday
students of 4th Semester
* Classes will remain suspended on the Institute Foundation Day - 18.08.2010 (Wednesday).
AUTUMN BREAK 14.10.2010 to Thursday to
(Only for UG students) 17.10.2010 Sunday
Last date for General Time-Table slot allocation (UG and PG) for
28.10.2010 Thursday
Spring Semester 2010-2011
15.11.2010 to Monday to
Academic Pre-registration(Spring Semester 2010 - 2011)
19.11.2010 Friday
Preparatory Leave 18.11.2010 Thursday
END-AUTUMN SEMESTER EXAMINATION 19.11.2010 to Friday to
(for all courses and classes) 26.11.2010 Friday
Last date for Submission of Grades for students at all levels
06.12.2010 Monday
(All Theory, Sessional/Laboratory Subjects, etc.)
Last date for holding Project Seminar of II Year M.Tech and MCP
02.12.2010 Thursday
students
Last date for Departmental Academic Committee Meeting (UG and
10.12.2010 Friday
PG)
PGPEC meeting for consideration of Results (Tentative) 14.12.2010 Tuesday
UGPEC meeting for considering results (Tentative) 15.12.2010 Wednesday
Meeting of UG Monitoring Committee (Tentative) 16.12.2010 Thursday
www.iitkgp.ac.in/topfiles/acadcal.php 1/7
6/24/2010 http://www.iitkgp.ac.in/topfiles/acadcal…
Senate Meeting/Declaration of results (Tentative) 27.12.2010 Monday
27.11.2010 to Saturday to
Winter semester break(only for UG students)
28.12.2010 Tuesday
07.12.2010 to Tuesday to
Winter vacation(only for Teachers)
24.12.2010 Friday
SPRING SEMESTER REGISTRATION
IVth Year B. Arch 29.11.2010 Monday
PG II Year (except M.Tech. GG),Dual Degree (V Year),MMST - II &
03.12.2010 Friday
III Year
PG I Year (except M.Tech. GG)
MBM - II Year (4th Semester) 28.12.2010 Tuesday
LLB(II and III Year)
UG I to IV Year, BArch V Year,
MSc (Integrated) [except IV and V Year EX and GG] 29.12.2010 Wednesday
and MSc (2 Year) I and II Year [except EX and GG]
MSc (Integrated) IV and V Year EX and GG
MSc (2 Year) I and II Year EX and GG 10.01.2011 Monday
MTech I and II Year GG
21.01.2011
Friday to
SPRING FESTIVAL (Evening) to
Monday
24.01.2011
28.01.2011
Friday to
TECHNO-MANAGEMENT FESTIVAL (KSHITIJ) (Evening) to
Monday
31.01.2011
Mid-Spring Semester Examination 18.02.2011 to Friday to
(for all courses and classes) 25.02.2010 Friday
Last date for assigning Thesis/Project, which are of 2-Semester continuous duration, to
(a)MTech, MCP and LLB (III year students admitted in 2008-
26.01.2011 Wednesday
2009)
BTech (H) 7th and 8th Semester
Dual Degree 9th Semester
17.03.2011 Thursday
MSc (Integrated) 9th Semester
MSc (2 Year) 3rd Semester
Last date for General Time Table slot allocation (UG and PG)
17.03.2011 Thursday
for Autumn Semester 2011-2012
Last date for evaluation of MBA 3rd Semester Project Dissertation 10.01.2011 Monday
Last date for Comprehensive Viva-Voce of PG Courses
including LLB (II and III year) and submission of 11.04.2011 Monday
Project Report/dissertation for III year LLB
* Classes will remain suspended on 24.01.2011 (Monday) for Spring Fest and 31.01.2011 (Monday) for
Kshitij
Last date for Comprehensive Viva-Voce for
4th, 8th and 10th Semester UG students(all courses)
12.04.2011 Tuesday
[MSc II Year, BTech IV Year, BArch, MSc (Integrated) and Dual
Degree V Year]
12.04.2011 to Tuesday to
Academic Pre-registration(Autumn Semester 2011- 2012)
18.04.2011 Monday
www.iitkgp.ac.in/topfiles/acadcal.php 2/7
6/24/2010 http://www.iitkgp.ac.in/topfiles/acadcal…
Preparatory Leave 21.04.2011 Thursday
End-Spring Semester Examination 22.04.2011 to Friday to
(for all courses and classes) 29.04.2011 Friday
30.04.2011 to Saturday to
Summer break(only for UG students)
15.07.2011 Friday
Last date for submission of Thesis/Project/
Dissertation reports by Final Year students of 04.05.2011 Wednesday
all UG Courses (including Dual Degree)
Last date for submission of Grades
(a) Sessional/Laboratory subjects 18.04.2011 Monday
(b)Theory subjects (at all levels) 05.05.2011 Thursday
(c)UG Final Year Project & Viva Voce 10.05.2011 Tuesday
UGPEC meeting to identify subjects for the Summer Quarter 06.05.2011 Friday
Completion of Project Viva-Voce for final year
UG students (all courses) including 09.05.2011 Monday
MSc and Dual Degree
Registration of students for the Summer Quarter 11.05.2011 Wednesday
Summer Quarter classes begins on 16.05.2011 Monday
Summer Quarter classes ends on 24.06.2011 Friday
Mid-Summer Examination related to SQ subjects to be taken by 30.05.2011 to Monday to
the teachers concerned, on a date between 03.06.2011 Friday
Completion of Thesis/Project Viva-Voce for Final Year
11.05.2011 Wednesday
Postgraduate students
Last date for submission of Grades for all Final Year PG courses 13.05.2011 Friday
Last date for Departmental Academic Committee Meeting 17.05.2011 Tuesday
UGPEC meeting for consideration of UG results (tentative) 20.05.2011 Friday
PGPEC meeting for consideration of PG results(tentative) 23.05.2011 Monday
Registration for PG (3rd Semester) and Final Year Dual
25.05.2011 Wednesday
Degree
Senate Meeting/Declaration of results (Tentative) 24.05.2011 Tuesday
Summer Quarter and Supplementary Examination (UG and PG 27.06.2011 to Monday to
Courses) 04.07.2011 Monday
Last date for submission of Summer Quarter and Supplementary
08.07.2011 Friday
Examination Grades
UGPEC to consider Summer Quarter results (Tentative) 13.07.2011 Wednesday
Meeting of UG Monitoring Committee (Tentative) 14.07.2011 Thursday
57th CONVOCATION(Tentative) 13.08.2011 Saturday
Registration for next Autumn Semester(2011-2012)
18.07.2011 Monday
(UG II year onwards)(tentative)
PG Freshers' (all courses) Registration (2011-2012)(tentative) 19.07.2011 Tuesday
UG Freshers' (all courses) Registration (2011-2012)(tentative) 20.07.2011 Wednesday
www.iitkgp.ac.in/topfiles/acadcal.php 3/7
6/24/2010 http://www.iitkgp.ac.in/topfiles/acadcal…
SCHEDULE (2010-2011)
(For Field Work/Training and Camps)
During 26.11.2010
1. Annual NCC/NSS Camp for I and II Year UG students (10 days)
- 03.12.2010
2. Field work for students of Applied Geology,
Exploration Geophysics and Computational Seismology
(a) 2 nd and 3 rd Year M.Sc. (3 weeks) Betw een
(b) 4 th and 5 th Year M.Sc. and 1st Year M.Tech.students (for 6 w eeks) 09.12.2010 and
29.12.2010
Betw een
25.11.2010 and
05.01.2011
Betw een
Industrial/Professional training for BTech(Hons) students
3. 02.05.2011 and
of all branches after 6th Semester (8 w eeks during Summer Break)
24.06.2011
4. Field trips, camps, etc., for students of BTech (Hons) Mining Engineering
(a)Mining Engineering Coal Mines Field Trip (one week at the end of 5th December 2010
Semester)
(One w eek at the end of the V Semester) February 2011
(b) Metal Mining field trip (underground)(4 days during 6th Semester)
5. Tw o weeks Field Tour for 2nd , 3 rd and 4 th Year B.Arch.(H) students Betw een
30.11.2010 and
13.12.2010
Admitted in
2007-2008
Batch
6. Professional training for B.Arch.(Hons.) students after the VIII Semester during
01.01.2011
to
13.06.2011
ACADEMIC CALENDAR FOR 2009-2010
EVENT DATE DAY
CONVOCATION (Tentative) 08.08.2009 Saturday
AUTUMN SEMESTER (REGISTRATION)
(a)MBA/MCP - 3rd Semester (Project), 08.05.2009 Friday
(b)Dual Degree V Year (2005 batch) 20.05.2009 Wednesday
(c)PG II Year/MMST (II/III Year)/LLB(II/III Year) 20.05.2009 Wednesday
(d)UG II to V Year, Int. M.Sc. (II-V Year) M.Sc. (2-Year) II Year 20.07.2009 Monday
(e)PG I Year (all courses)/M.Sc.(2-year)/ LLB - 1 Year 21.07.2009 Tuesday
(f)UG I Year (all courses) 16.07.2009 Thursday
Institute Foundation Day * 18.08.2009* Tuesday
* Classes w ill remain suspended on the Institute Foundation Day - 18.08.2009 (Tuesday).
MID - AUTUMN SEMESTER EXAMINATION 14.09.2009 to Monday to
(for all courses/classes) 22.09.2009 Tuesday
www.iitkgp.ac.in/topfiles/acadcal.php 4/7
6/24/2010 http://www.iitkgp.ac.in/topfiles/acadcal…
Last date for assigning Project to UG students :
(i) B.Tech.(H) students of VI/VIII & Dual Degree (X semester)
07.10.2009 Wednesday
(ii) M.Sc. (Integrated) - X Semester and M.Sc.(2-Year)-IV Semester
AUTUMN BREAK 23.09.2009 to Wednesday
(Only for UG students) 02.10.2009 to Friday
Last date for General Time-Table slot allocation (UG/PG) for Spring
23.10.2009 Friday
Semester 2009-2010
Preparatory Leave 19.11.2009 Thursday
END-AUTUMN SEMESTER EXAMINATION 20.11.2009 to Friday to
(for all courses and classes) 27.11.2009 Friday
Last date for Submission of Grades for all levels
04.12.2009 Friday
(All Theory, Sessional/Laboratory Subjects etc.)
Last date for holding the Project Seminar of Second Year M.Tech./MCP
03.12.2009 Thursday
students
PGPEC meeting for consideration of Results (Tentative) 11.12.2009 Friday
UGPEC meeting for considering results (Tentative) 16.12.2009 Wednesday
Meeting of UG Monitoring Committee (Tentative) 18.12.2009 Friday
Senate Meeting/Declaration of results (Tentative) 28.12.2009 Monday
INTER SEMESTER BREAK 28.11.2009 to Saturday to
(Only for UG students) 29.12.2009 Tuesday
WINTER VACATION 05.12.2009 to Saturday to
(Only for Teachers) 24.12.2009 Thursday
SPRING SEMESTER REGISTRATION
IVth Year B. Arch 27.11.2009 Friday
PG II Year (except M.Tech. GG),Dual Degree (V Year),MMST - II & III
04.12.2009 Friday
Year
PG I Year (except M.Tech. GG)
MBM - II Year (4th Semester) 29.12.2009 Tuesday
LLB(II and III Year)
UG Ist to IVth Year, Vth Yr. B.Arch./Int. M.Sc. and M.Sc. (2nd Year) - I &
II Year [except IV & V Year of M.Sc. (5 Year) & I and II Yr. M.Sc. (2 Year) 30.12.2009 Tuesday
- EX and GG]
IV & V Year of M.Sc. (5 Year) & I and II Yr. M.Sc. (2 Year) - EX and GG
10.01.2010 Monday
M.Tech. I & II Yr. GG students
21.01.2010
Thursday to
SPRING FESTIVAL (Evening) to
Sunday
24.01.2010
28.01.2010
Thursday to
TECHNO-MANAGEMENT FESTIVAL (KSHITIJ) (Evening) to
Sunday
31.01.2010
* Classes w ill remain suspended on 22.01.2010 (Friday) for Spring Fest and 29.01.2010 (Friday) for
Kshitij
MID-SPRING SEMESTER EXAMINATION 19.02.2010 to Friday to
(for all courses and classes) 26.02.2010 Friday
www.iitkgp.ac.in/topfiles/acadcal.php 5/7
6/24/2010 http://www.iitkgp.ac.in/topfiles/acadcal…
Last date for assigning Thesis/Project, w hich are of 2-Semester continuous duration, to
(a)M.Tech./MCP students admitted in 2008-2009 27.01.2010 Wednesday
(b)B.Tech.(H) students for the project of VII & VIII, Semester/Dual
Degree (IX Semester)/ Int. M.Sc. (IX Semester) /2-Yr. M.Sc. (III 18.03.2010 Thursday
Semester)
Last date for General Time Table slot allocation (UG/PG) for Autumn
12.03.2010 Friday
Semester 2010-2011
Last date for evaluation of MBA 3rd Semester Project Dissertation 11.01.2010 Monday
Last date for Comprehensive Viva-Voce of PG Courses 12.04.2010 Monday
Last date for holding Comprehensive Viva Voce for IV/VIII/X Semester
UG students (all courses)(M.Sc.-2nd Year, B.Tech.-4th Year, B.Arch., Int. 13.04.2010 Tuesday
M.Sc./Dual Degree-5th Year)
END-SPRING SEMESTER EXAMINATION 22.04.2010 to Thursday to
(for all courses and classes) 29.04.2010 Thursday
SUMMER BREAK 30.04.2010 to Friday to
(Only for UG students) 16.07.2010 Friday
SUMMER VACATION 07.05.2010 to Friday to
(Only for Teachers) 16.07.2010 Friday
Last date for for submission of Thesis /Project/Dissertationreports by
05.05.2010 Wednesday
the Final Year students of all UG Courses (including Dual Degree)
Last date for submission of Grades
(a) Sessional/Laboratory subjects 19.04.2010 Monday
(b)Theory subjects (at all levels) 06.05.2010 Thursday
(c)UG Final Year Project & Viva Voce 11.05.2010 Tuesday
UGPEC meeting to identify subjects for the Summer Quarter 07.05.2010 Friday
Completion of Project Viva-Voce for final year UG students (all courses)
10.05.2010 Monday
including M.Sc. & Dual
Registration of students for the Summer Quarter 13.05.2010 Thursday
Summer Quarter classes begins on 17.05.2010 Monday
Summer Quarter classes ends on 25.06.2010 Friday
Mid-Summer Examination related to SQ subjects to be taken by the 31.05.2010 to Monday to
teachers concerned, on a date betw een 04.06.2010 Friday
Completion of Thesis/Project Viva-Voce for Final Year Postgraduate
11.05.2010 Tuesday
students
UGPEC meeting for consideration of UG results (Tentative) 18.05.2010 Tuesday
Submission of tabulation sheets to Academic Section for all Final Year
14.05.2010 Friday
PG Courses latest by
PGPEC meeting for consideration of PG results (Tentative) 17.05.2010 Monday
Registration for PG (3rd Semester)/Final Yr. Dual Degree 19.05.2010 Wednesday
Senate Meeting /Declaration of results (Tentative) 24.05.2010 Monday
28.06.2010 to Monday to
Summer Quarter and Supplementary Examination (UG/PG Courses)
05.07.2010 Monday
www.iitkgp.ac.in/topfiles/acadcal.php 6/7
6/24/2010 http://www.iitkgp.ac.in/topfiles/acadcal…
Summer Quarter & Supplementary Grades to be sent to the Academic
09.07.2010 Friday
Section latest by
UGPEC to consider Summer Quarter results 14.07.2010 Wednesday
Meeting of UG Monitoring Committee 15.07.2010 Thursday
CONVOCATION(Tentative) 24.07.2010 Saturday
Registration for next Autumn Semester
19.07.2010 Monday
(2009-2010) (UG 2nd year onw ards) (Tentative)
PG Fresher's (all courses) Registration (2010-2011) (Tentative) 20.07.2010 Tuesday
UG Fresher's (all courses) Registration(2010-2011) (Tentative) 21.07.2010 Wednesday
SCHEDULE (2009-2010)
(For Field Work/Training and Camps)
During
Annual NCC/NSS Camp for First and Second Year Undergraduate students (10
1. 28.11.2009 to
days)
07.12.2009
2. Field w ork for the students of Applied Geology and Exploration Geophysics and Computational
Seismology
(a) 2 nd and 3rd Year M.Sc. (3 w eeks) Between
(b) 4 th and 5th Year M.Sc. and 1st Year M.Tech.students (for 6 weeks) 10.12.2009 to
30.12.2009
Between
27.11.2009 to
08.01.2010
Between
Industrial/professional training for the B.Tech.(H) students of all branches after
3. 01.05.2010 to
VI Semester (8 w eeks-during the Summer Break)
27.06.2010
4. Field trips, camps etc., for the students of B.Tech.(H) Mining Engineering
(a) Mining Engineering Coal Mines Field Trip December 2009
(One w eek at the end of the V Semester)
(b) Metal Mining field trip (underground) (4 days during the VI Semester) February 2010
5. Tw o w eeks Field Tour for 2nd , 3 rd and 4th Year B.Arch.(H) students Between
30.11.2009 to
13.12.2009
Admitted in
2006-2007
Batch
6. Professional training for B.Arch.(Hons.) students after the VIII Semester during
01.01.2010
to
13.06.2010
www.iitkgp.ac.in/topfiles/acadcal.php 7/7