0% found this document useful (0 votes)
57 views6 pages

Aaa

The document contains electricity consumption and cost data for various buildings and processes at a facility over multiple years. It provides the annual electricity usage in kWh and resulting costs in Philippine pesos for each area of the facility. It also includes water consumption and cost data, listing the total cubic meters of water used annually for processes and employees, and the total annual cost.

Uploaded by

Ash Yehia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views6 pages

Aaa

The document contains electricity consumption and cost data for various buildings and processes at a facility over multiple years. It provides the annual electricity usage in kWh and resulting costs in Philippine pesos for each area of the facility. It also includes water consumption and cost data, listing the total cubic meters of water used annually for processes and employees, and the total annual cost.

Uploaded by

Ash Yehia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

16.

45 pesos per m3
16.45
16.45
16.45
3.1545 L/hr-emp employees hrs shif
3.1545 8
3.1545 6
3.1545 4

3.125

4760
### 4600

L per hour consumption hr of shif consumption per shif


3.125 8 25
3.125 6 0
3.125 4 0

ELECTRICITY building

Electricity Consumption
Area (m2)
(kWh/m2/yr)
electricity cons (kWh/f2/yr)
Administration 2,500.00 200.00
Security 1 (Main) 240.38 200.00
Security 2 252.05 200.00
Wastewater Treatment Plant 600.00 200.00
Fire Station 562.46 200.00
Delivery House 1 939.79 200.00
Delivery House 2 939.79 200.00
Warehouse 1,404.21 200.00
Canteen 525.78 200.00
Clinic 75.00 200.00
Boiler 375.00 200.00
Parking Lot 2,400.00 200.00
total 10,814.46
number
19
184
0
203

number of employees
283
0
0

PHP BUILDING
Electricity (kWh/year) PHP building
ANNUAL

500,000.00 2,778,050.00 12,017,245.69


48,076.58 275,585.94 12,398,192.37
50,409.90 298,121.12 12,791,215.07
120,000.00 732,169.43 13,196,696.59
112,492.46 708,120.54 13,615,031.87
187,957.56 1,220,666.44 14,046,628.38
187,957.56 1,259,361.57 14,491,906.50
280,842.20 1,941,361.59 14,951,299.94
105,156.00 749,948.70 15,425,256.15
15,000.00 110,367.75 15,914,236.77
75,000.00 569,332.04 16,418,718.07
480,000.00 3,759,231.12 16,939,191.43
- -
2,162,892.26
total number of hours per shif total liters
152 479.484
1104 3482.568
0 0

SUM 3962.052

7075
0
0
7075 per day
2582375 per year
2582.375 m3 per year
42480.06875

TOTAL kwh per year total price


POWER KW/yr process
2,162,892.26 309,133,192.30 311,296,084.56 5.5561
2,162,892.26 309,133,192.30 311,296,084.56 5.73222837
2,162,892.26 309,133,192.30 311,296,084.56 5.9139400093
2,162,892.26 309,133,192.30 311,296,084.56 6.1014119076
2,162,892.26 309,133,192.30 311,296,084.56 6.2948266651
2,162,892.26 309,133,192.30 311,296,084.56 6.4943726704
2,162,892.26 309,133,192.30 311,296,084.56 6.700244284
2,162,892.26 309,133,192.30 311,296,084.56 6.9126420278
2,162,892.26 309,133,192.30 311,296,084.56 7.1317727801
2,162,892.26 309,133,192.30 311,296,084.56 7.3578499772
2,162,892.26 309,133,192.30 311,296,084.56 7.5910938215
2,162,892.26 309,133,192.30 311,296,084.56 7.8317314957
2,162,892.26 309,133,192.30 311,296,084.56 8.0799973841
Cubic meter
Cubic meter
used for
used in process
employees
4,335,295.53 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
total m3 total cost peso 8,670,591.07 1323.325368
0.479484 7.8875118 8,670,591.07 1323.325368
3.482568 57.2882436 8,670,591.07 1323.325368
0 0 8,670,591.07 1323.325368
8,670,591.07 1323.325368
3.962052 65.1757554 8,670,591.07 1323.325368
Peso per year 21768.7023036 8,670,591.07 1323.325368
m3 per year 1323.325368 8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368
8,670,591.07 1323.325368

total price PHP total php

1,729,592,175.42 1,741,609,421.11
1,784,420,247.38 1,796,818,439.76
1,840,986,369.23 1,853,777,584.30
1,899,345,637.13 1,912,542,333.72
1,959,554,893.83 1,973,169,925.70
2,021,672,783.96 2,035,719,412.35
2,085,759,811.21 2,100,251,717.72
2,151,878,397.23 2,166,829,697.17
2,220,092,942.42 2,235,518,198.57
2,290,469,888.70 2,306,384,125.46
2,363,077,784.17 2,379,496,502.24
2,437,987,349.93 2,454,926,541.36
2,515,271,548.92
PHP/m3 TOTAL WATER PER YEAR PHP per year
16.75 4,336,618.86 72,638,365.88
17.28 8,671,914.39 149,859,135.80
17.83 8,671,914.39 154,609,670.40
18.39 8,671,914.39 159,510,796.96
18.98 8,671,914.39 164,567,289.22
19.58 8,671,914.39 169,784,072.29
20.20 8,671,914.39 175,166,227.38
20.84 8,671,914.39 180,718,996.79
21.50 8,671,914.39 186,447,788.99
22.18 8,671,914.39 192,358,183.90
22.88 8,671,914.39 198,455,938.33
23.61 8,671,914.39 204,746,991.57
24.36 8,671,914.39 211,237,471.20
25.13 8,671,914.39 217,933,699.04
25.93 8,671,914.39 224,842,197.30
26.75 8,671,914.39 231,969,694.95
27.60 8,671,914.39 239,323,134.28
28.47 8,671,914.39 246,909,677.64
29.37 8,671,914.39 254,736,714.42
30.31 8,671,914.39 262,811,868.27

You might also like