S.N.                     Activities                    Clause No.
Obsertations
        Bottom hub, pulling lug top & bottom,
        top & bottom pin protectors.
 45     Repair of cracks or sections broken out        5.2.2 (G80)             No repair is done.
        at any location is prohibited.
 46     Restoration for wear of the lock is            5.3.1 (G80)                 Not done.
        done only on the knuckle engagement            5.3.2(G80)
        surface. Repair of cracks or sections
        broken out at any location is prohibited.
 47     The restoration by welding is done as          5.3.3(G80)                     -do-
        specified.
 48     The knuckle pivot pin is reconditioned as       5.4(G80)             No recondition is done.
        per the procedure specified.
 49     Ensure that the coupler yoke are                5.5(G80)                      -do-
        reconditioned only when within the
        specified limits otherwise scrapped. The
        repair is done as per the specified
        procedure.
 50     Ensure that the high capacity draft gear      As per G-80                Being followed.
        are maintained and reclaimed as per the             &
        instructions circulated by M/s Bhartia        Chapter 9 of
        for Cardwoll Mark 50 Design & by M/s          Maintenance
        Burns Standards for Miners RF-361 and       Manual for Wagon.
        as laid down in Chapter 9 of
        Maintenance Manual for Wagons.
 51     The standard draft gears are to be          Para 919 of Maint.                -do-
        replaced by high capacity draft gears       Manual for wagon
        vide RB’s letter No.84/M(N)/
        172/3 dtd.5-7-90 and new freight stocks
        would be fitted with high capaciity draft
        gear i.e. RF-361 & MK-50.
 52     Maintenance of RF-361 Draft gear            Para 920 of Maint.
                                                    Manual for wagon
 53     All gauges for housing, gauges for shoes,          -do-                   Yes available.
        gasuges for wedge and final inspection
        gauges as specified are available.
53.1    The RF361 draft gear will require                  -do-           Rear wall plate is cut by gas
        complete reconditioning i.e., removal                            cutting, no bend saw machine.
        and replacement of the rear wall plate
        only if the gear has loosed clutch
        components (shoe & wedge), a broken
        housing or cracked weld at the rear wall.
        If loose clutch, broken housing or a
        cracked weld are not present then only
        removal and replacememnt of clutch
        component is necessary.         Normally,
        clutch disassembly and replacement is
        the only reconditioning needed in the RF
        361 draft gear.
S.N.                     Activities                     Clause No.                Obsertations
 53.2   If either the shoes or wedge are broken     Para 920 of Maint.   Followed 100% reconditioning is
       and the and the clutch is not loose,          Manual for wagon                 done.
       RF361 draft gear is dismantled as per
       laid down procedure in para 920C(b)
       and necessary equipments are available
       for this purpose.
53.3   Shoes are inspected for these defects –             -do-                Check by visual & gauges
              No concave wear or any                                          Being followed
                  friction surface                                             Being followed
              No cracks or spalls
              No wear more than
                  0.8mm on any friction
                  surface
53.4   Wedge is inspected for these defects –              -do-                 Inspected
             No crack or spall of the
                carborized case on the friction
                face or the top of the wedge
             No wear more than 0.8mm or
                1/32” on the friction surface.
             No indication of broken or any
                cracks on any of the locking lugs.
53.5  Housing or cylinders are examined as                 -do-         Examined and scrapped if found
      per laid down procedure and scrapped if                                    unsuitable.
      found unsuitable.
 53.6 For proper function, every part of the               -do-                     Followed.
      assembly must be free of oil, grease and
      moisture. The part should be kept
      properly during storage, handling and
      reassembling.
 53.7 Wedge and shoes asre to be shot                      -do-          No shot peened is done, cleaning
      peenerd to remove rust and dirt before                            is done by wire brush.
      assembly.
 53.8 Re-assembly of draft gear is being done              -do-                     Followed
      as per laid down procedure.
 53.9 If complete reconditioning of the gear is            -do-            Followed by no static test is
      required either because of a loose clutch                                      done.
      or a broken weld, then procedure as laid
      down in para 290(D) are followed.
      Rubber pads are inspected as per laid
      down procedure and static test is
      performed.
53.10 All components         such as internal              -do-                     Followed.
      followers, forged items, housing
      (cylinders )are inspected as per laid
      down procedure.
53.11 Re-assembly of reconditioned RF-361                  -do-          Tools and fixtures are available.
      draft gear is done as specified and tools
      such as 50 tons vertical press and draft
      gear assembly ring support fixture are
      available for assembly purpose
S.N.                   Activities                       Clause No.                Obsertations
53.12 Reconditioned draft gear RF361 is                  -do-                 Being followed.
      inspected as specified
53.13 Welding of rare plate after assembly is            -do-          Followed by only CO2 welding.
      done as specified in the manual. MIG
      welding (with 100% CO2 shielding gas) is
      use for piller pass welding and MIG
      welding (with 75% urban and 25% CO2)
      is use for root run welding.
53.14 The assembled RF361 draft gear must be             -do-                     Followed
      preshortened facilitate installations into
      the yoke and draft pocket. After pre-
      shortening the external surface of the
      draft gear is to be painted with balck or
      blue paints.
54    Maintenance of Mark – 50 Draft Gear             Para 91 of
                                                     Maintenance
                                                   Manual for Wagon
54.1   Inspection of MK-50 Draft gear is done            -do-                    Followed.
       for reconditioning through a built in
       wear life gauge as per laid down
       procedure.
54.2   While removing the draft gear from the            -do-          Suitable lifting/lowering jack is
       wagon pocket, it is necessary to                               available and shortened by cross
       compress the draft gear approximately                                          key.
       (1/4”). Suitable lifting/lowering jack is
       available for removal of draft gear from
       wagon pocket.
54.3   For removal of stuck or damaged draft             -do-                    Followed.
       gear, laid down procedures and
       precautions are followed.
54.4   For dismantling of MK-50 draft gear,              -do-                    Followed.
       tools and gadgets are available and
       procedures as specified as follows.
54.5   All gauges as per annexure are available          -do-                  Yes, available.
       for maintenance/ reconditioning of MK-
       50 draft gear.