DAFTAR HARGA BAHAN DAN UPAH
KEGIATAN                          :      PEKERJAAN TALUD + DRAINASE
LOKASI                            :      UNGAE
TAHUN                             :      2017
 NO             NAMA BAHAN      SATUAN      HARGA SATUAN        PAJAK
 A    BAHAN LOKAL
 1    Batu Kali                   M3              145,000.00      16,700.00
 2    Pasir Pasangan              M3               75,000.00       8,600.00
 3    Pasir Beton                 M3               75,000.00       8,600.00
 4    Chipping 2 -3               M3              350,000.00      40,300.00
 5    Timbunan Sirtu Kls C        M3               75,000.00       8,600.00
 B    BAHAN PABRIKASI
 1    Semen Tonasa 40 Kg         Zak               50,000.00       5,800.00
 2    Besi Ø 12                 Batang             90,000.00      10,400.00
 4    Kawat                       Kg               20,000.00       2,300.00
 C    KAYU
 1    Kayu Kls IV perancah        M3            1,350,000.00     155,300.00
 2    Paku                        Kg               15,000.00       1,700.00
 D    HARGA UPAH
 1    PEKERJA                     OH               80,000.00
 2    TUKANG                      OH              110,000.00
 E    ALAT
 1    MOLEN                      HARI             250,000.00      28,800.00
 2    GEROBAK                    BUAH             500,000.00      57,500.00
 3    SEKOP                      BUAH              75,000.00       8,600.00
 4    PAPAN PROYEK               BUAH             150,000.00
 5    PRASASTI                   BUAH             450,000.00
HARGA RAB
  161,700.00   #REF! 646,800.00            150000
   83,600.00         334,400.00
   83,600.00                      13636.3636363636
  390,300.00
   83,600.00         334,400.00
   55,800.00
  100,400.00
   22,300.00
1,505,300.00
   16,700.00
   80,000.00
  110,000.00
  278,800.00
  557,500.00
   83,600.00
  150,000.00
  450,000.00
                                    DAFTAR ANALISA PEKERJAAN RABAT
 PEKERJAAN                      :    PEKERJAAN TALUD + DRAINASE UNGAE
                                :
 TAHUN ANGGARAN                 :    2017
  LOKASI                        :    UNGAE
A. PEKERJAAN TALUD
                 1 M3 GALIAN TANAH
          Tenaga      0.750 OH Pekerja                       Rp       80,000.00   Rp     60,000.00
                                                                                  Rp    60,000.00
                    1 M3 PASANGAN PONDASI BATU KALI 1 Pc : 4 Ps
             Bahan       1.200 M3 Batu Kali                  Rp      161,700.00   Rp    194,040.00
                         4.075 Zak Semen Portland 40 Kg      Rp       55,800.00   Rp    227,385.00
                         0.520 M3 Pasir Pasang               Rp       83,600.00   Rp     43,472.00
             Tenaga      1.500 OH Pekerja                    Rp       80,000.00   Rp    120,000.00
                         0.750 OH Tukang Batu                Rp      110,000.00   Rp     82,500.00
                                                                                  Rp   667,397.00
                    1 M2 PLASTERAN SIAR 1 Pc : 2 Ps
             Bahan       0.158 Zak Semen Portland 40 Kg      Rp       55,800.00   Rp      8,816.40
                         0.012 M3 Pasir Pasang               Rp       83,600.00   Rp      1,003.20
             Tenaga      0.300 OH Pekerja                    Rp       80,000.00   Rp     24,000.00
                         0.150 OH Tukang Batu                Rp      110,000.00   Rp     16,500.00
                                                                                  Rp    50,319.60
B. PEKERJAAN DRAINASE
                 1 M3 GALIAN TANAH
          Tenaga      0.750 OH Pekerja                       Rp       80,000.00   Rp     60,000.00
                                                                                  Rp    60,000.00
                    1 M3 PASANGAN PONDASI BATU KALI 1 Pc : 4 Ps
             Bahan       1.200 M3 Batu Kali                  Rp      161,700.00   Rp    194,040.00
                         5.050 Zak Semen Portland 40 Kg      Rp       55,800.00   Rp    281,790.00
                         0.485 M 3
                                   Pasir Pasang              Rp       83,600.00   Rp     40,546.00
             Tenaga      1.500 OH Pekerja                    Rp       80,000.00   Rp    120,000.00
                         0.750 OH Tukang Batu                Rp      110,000.00   Rp     82,500.00
                                                                                  Rp   718,876.00
                    1 M2 PLASTERAN   1 Pc : 3 Ps
             Bahan       0.195 Zak   Semen Portland 40 Kg    Rp       55,800.00   Rp     10,853.10
                         0.023 M3    Pasir Pasang            Rp       83,600.00   Rp      1,922.80
             Tenaga      0.300 OH    Pekerja                 Rp       80,000.00   Rp     24,000.00
                         0.150 OH    Tukang Batu             Rp      110,000.00   Rp     16,500.00
                                                                                  Rp    53,275.90
                    1 M2 PEKERJAAN ACIAN
             Bahan       0.056 Zak Semen Portland 40 Kg      Rp       55,800.00   Rp      3,138.75
             Tenaga      0.200 OH Pekerja                    Rp       80,000.00   Rp     16,000.00
                         0.100 OH Tukang Batu                Rp      110,000.00   Rp     11,000.00
                                                                                  Rp    30,138.75
                                       RENCANA ANGGARAN BIAYA
                                      DESA CITTA KECAMATAN CITTA
                                         TAHUN ANGGARAN 2017
1.        Bidang                               : Pembangunan Desa
2.        Kegiatan                             : Pekerjaan Talud + Drainase Ungae
3.        Waktu Pelaksanaan                    : 90 Hari
Rincian Pendanaan                              :
                                                                      HARGA                JUMLAH
N0                      URAIAN                       VOLUME
                                                                         SATUAN                HARGA
 1                         2                               3               4                        5
 I       PEKERJAAN TALUD                                                                         35,466,000.00
      A Pekerjaan Galian Tanah                     16.65       M3
      1 Pekerja                                    12.00       OH           80,000.00                    960,000.00
      B   Pekerjaan Pasangan Batu                  45.788      M3
      1   Batu Kali                                 54.00      M3          161,700.00               8,731,800.00
      2   Semen Portland 40 Kg                     186.00      Zak          55,800.00              10,378,800.00
      3   Pasir Pasang                              24.00      M3           83,600.00               2,006,400.00
      4   Pekerja                                   69.00      OH           80,000.00               5,520,000.00
      5   Tukang Batu                               34.00      OH          110,000.00               3,740,000.00
      C   Pekerjaan Plasteran Siar                 83.25       M2
      1   Semen Portland 40 Kg                     13.00       Zak          55,800.00                 725,400.00
      2   Pasir Pasang                              1.00       M3           83,600.00                  83,600.00
      3   Pekerja                                  25.00       OH           80,000.00               2,000,000.00
      4   Tukang Batu                              12.00       OH          110,000.00               1,320,000.00
 II      PEKERJAAN DRAINASE                                                                      49,182,300.00
      A Pekerjaan Galian Tanah                     72.15       M3
      1 Pekerja                                    54.00       OH           80,000.00               4,320,000.00
      B   Pekerjaan Pasangan Batu ( 1 : 3 )        47.730      M3
      1   Batu Kali                                 57.00      M3          161,700.00               9,216,900.00
      2   Semen Portland 40 Kg                     241.00      Zak          55,800.00              13,447,800.00
      3   Pasir Pasang                              23.00      M3           83,600.00               1,922,800.00
      4   Pekerja                                   72.00      OH           80,000.00               5,760,000.00
      5   Tukang Batu                               36.00      OH          110,000.00               3,960,000.00
      C   Pekerjaan Plasteran ( 1 : 3 )            199.80      M2
      1   Semen Portland 40 Kg                      38.00      Zak          55,800.00               2,120,400.00
      2   Pasir Pasang                               4.00      M3           83,600.00                 334,400.00
      3   Pekerja                                   60.00      OH           80,000.00               4,800,000.00
      4   Tukang Batu                               30.00      OH          110,000.00               3,300,000.00
III       PEKERJAAN PERLENGKAPAN                                                                  1,324,700.00
   1       Gerobak                                 1.000       Buah        557,500.00                557,500.00
   2       Sekop                                   2.000       Buah         83,600.00                167,200.00
   3       Papan Proyek                            1.000       Buah        150,000.00                150,000.00
   4       Prasasti                                1.000       Buah        450,000.00                450,000.00
                                     JUMLAH ( I + II )                                           85,973,000.00
                                                                               Citta, 24 Februari 2017
                       Kepala Desa Citta                                          Panitia Pelaksana
                      BAHAR MAHMUD
 12.4875
  54.945
186.5841
 23.8095
68.68125
34.34063
 13.1535
   0.999
  24.975
 12.4875
 54.1125
  57.276
241.0365
23.14905
  71.595
 35.7975
 38.8611
  4.5954
   59.94
   29.97
                                                                              TAKE OF SHEET
 Desa                            :             CITTA                                               Jenis Prasarana                                                  : Talud
NO                 Sketsa Dimensi Volume                                                      Analisa Perhitungan                                                       Volume
  PEKERJAAN TALUD
I     Volume Galian Tanah                                                                                                                                                       16.650
           1 Galian Tanah
                                               a                                  a   = 0.50                     V   = (a+b) x h/2 x L                                  16.65   M3
                                                                                  b   = 0.50                         =               16.650
                                                                                  h   = 0.30
               h                                                                  L   = 111.00
                                               b
II          Pasangan Batu Kali                                                                                                                                                  45.788
           1 Volume Pas. Batu
                                               a                                  a   = 0.25                  V1 = (a+b2) x h/2 x L                                      45.79 M3
                                                                                  b1 = 0.50
                                                                                  t   = 0.40
                                                                                  h   = 0.70
                                                   h                              L   = 111.00
                                          I
                   b2
                        t            II
                                 b1
III         Plasteran                                                                                                                                                           83.250
           1 Volume Pas. Batu
                                               a                                  a   = 0.25                     V   = (a + h ) x L                                      83.25 M3
                                                                                  h   = 0.50
                                                                                  L   = 111.00
                                                   h
                                          I
                   b2
                        t            II
 PEKERJAAN DRAINASE
      I      Galian                                                                                                                                                        72.150
                                 A                                L = 1.0     M
                                                                  T = 0.7     M           V = L X T X P                                                                       72.150
                                                       0.3        P = 111     M
                       1
      II     Pasangan Batu                                                                                                                                                 47.730
                                                                                          A1 = (             1       +        0.8    )        0.70 /       2.0
                                                                                               =             0.63 m2
                            25                50             25
                                                                                          A2 = (             0.5     +        0.3    )        0.50 /       2.0
                                                                                               =             0.20 m2
                                                                                          A    =         A1 -        A2
                                                                   50                          =             0.43 m2
                                                   A
                                                                   20                     Vol. =         A           x    P
                                                                                               =          0.43 x           111                                                47.73
                       b 25 b 30                       25
                       2     2                                    P =   111
     III     Plasteran                                                                                                                                                        199.80
               Saluran Tipe B
                            25                50             25                       b   =    0.25 +              0.5    +         0.3   +      0.5   +         0.25
                                                                                          =        1.8
                             A   =   b     x   P
                                     1.8   x   111   199.8
                  50
                  20
b 25 b 30   25
2    2           P =   111
Talud
 Volume
         16.650 M3
         45.788 M3
         83.250 M2
    72.150 M3
        72.150 M3
    47.730 M3
        47.73 M3
        199.80   M2
199.8   M2   205