PROPOSED WELDING PROCEDURE SPECIFICATION pWPS No: LTS 8
Maintain Potential Facilities Offshore Long Term Agreement Project DATE: 17-Dec-09
G R O U P
CJP, SMAW Welding REV: B1
WELDING SPEC. : SAES-W-013 & AWS D1.1 JOINT DESIGN
SUPPORTING PQR’s : A = 45° (+ 20° - 5°)
AS WELDED
MATERIAL SPEC. : API 5L B = 30° (+ 20° - 5°) A
GRADE / TYPE : API 5L GR. X52 R = min. 2 mm
DIAMETER : Ø6" F = 1 - 3 mm B
WALL THICKNESS : 0.72” (18.3 mm)
WELDING POSITION : 6G
WELDING DIRECTION : VERTICAL UP t
GRADE / TYPE : AWS D1.1 GROUP I & II F
DIA. QUALIFIED : Ø ≥ 6” (168.3 mm)
NOMINAL THK. QUALIFIED : 9 to 36.6 mm (3/8” to 1” 7/16) R
WELDING POSITION : ALL POSITIONS - UPHILL PROGRESSION WITH OR WITHOUT BACKING
PREHEAT TEMP. : 65°C MIN
QUALIFIED RANGE
INTERPASS TEMP. : 65°C - 250°C MAX FILLING SEQUENCE
PREHEAT METHOD : PROPANE 1 - ROOT
MEASUREMENT BY : DIGITAL THERMOMETER / TEMPILSTIK 2 - HOT
PWHT : N/A 3 - FILL
: SINGLE SIDE BUTT WELD AND FILLET WELD CAP
JOINT TYPE
PREPARATION METHOD : CUTTING OR GOUGING, GRINDING F ILLS
ALIGNMENT METHOD : TACK WELD MAY BE USED IF NECESSARY
3
ALIGNMENT REMOVED : N/A
2
CLEANING METHOD : GRIND / POWER BRUSH / HAND TOOLS
1
CONSUMABLES
: Elga P 62MR: AWS 5.5 E7018-G
CLASSIFICATION
PASS WELDING CONSUMABLE DIA. DC FLUX/ GAS AMPS VOLTS WFS OSC. TRAVEL HEAT
PROCESS +VE/ GAS FLOW PER SPEED INPUT
WELDING PARAMETERS
(mm) -VE TYPE (l/min) (m/min) MIN (cm/min) (kJ/mm)
ROOT SMAW Elga P 62MR 3.2 -VE N/A N/A 80 - 150 20 - 24 N/A N/A 4-5 ---
HOT SMAW Elga P 62MR 3.2 +VE N/A N/A 80 - 150 20 - 24 N/A N/A 5-6 ---
FILLS SMAW Elga P 62MR 3.2 +VE N/A N/A 80 - 150 20 - 24 N/A N/A 5-9 ---
FILLS SMAW Elga P 62MR 4.0 +VE N/A N/A 140 - 200 22 - 26 N/A N/A 5-9 ---
CAP SMAW Elga P 62MR 3.2 +VE N/A N/A 80 - 150 20 - 24 N/A N/A 7 - 10 ---
1. THIS WPS IS QUALIFIED ALSO FOR FILLET AND PJP WELDS OF ANY SIZE, FOR ANY THICKNESS OR DIAMETER (AWS D1.1, TABLE 4.2, NOTE D).
2. STRING / WEAVE BEAD. MAXIMUM BEAD WIDTH 3 TIMES ELECTRODE DIAMETER.
ADDITIONAL INFORMATION
3. TRAVEL SPEED CALCULATED FROM BARE PIPE EXTERNAL SURFACE.
4. PREHEAT TEMPERATURE IS MEASURED 75mm AWAY FROM BEVEL EDGE AND INTERPASS TEMPERATURE ON BEVEL EDGE.
5. IF REQUIERED, TACK WELDING SHALL BE PERFORMED AFTER PREHEAT OF THE PIPE BY QUALIFIED WELDERS, USING PARAMETERS OF THE ROOT PASS. BULLET
TACK WELDING MATERIAL TO BE MADE FROM BASE METAL MATERIAL.
6. FORCED AIR / WATER COOLING OF COMPLETED WELD FROM BELLOW 200°C MAY BE USED TO FACILITATE NDT EXAMIINATION.
3RD PARTY