Dr. Joel P. Limson

The construction of the P8.45 million Industrial Electronics Technology Development Building at NORSU Main Campus 1 has resumed in July 2017 after being delayed due to insufficient funds. As of writing, 45% of the work has been completed, including window awnings on the exterior walls and ceiling and bathroom works on the ground floor. Painting has also started on the ground floor. On the third floor, 50% of the ceiling is finished and concrete work continues. Phase I is complete and work is now focused on Phase II, with expected completion by the end of the year.

Uploaded by

beautifulme
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views1 page

Dr. Joel P. Limson

The construction of the P8.45 million Industrial Electronics Technology Development Building at NORSU Main Campus 1 has resumed in July 2017 after being delayed due to insufficient funds. As of writing, 45% of the work has been completed, including window awnings on the exterior walls and ceiling and bathroom works on the ground floor. Painting has also started on the ground floor. On the third floor, 50% of the ceiling is finished and concrete work continues. Phase I is complete and work is now focused on Phase II, with expected completion by the end of the year.

Uploaded by

beautifulme
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

July 31, 2017

DR. JOEL P. LIMSON


University President
Negros Oriental State University
Kagawasan Avenue, Capitol Area
6200 Dumaguete City, Negros Oriental

Dear Dr. Limson:

This is to notify you of the progress as regards the construction of the P8.45 million Industrial
Electronics Technology Development Building at NORSU Main Campus 1. Supposedly, the
expected completion of the project was dated last October 27, 2016 but due to insufficient
funds and some inconveniences, the project got delayed. The construction resumed this
second week of July, 2017.
As of this writing, 45% of the work has already been completed. We are currently making
window awnings which will be attached on the exterior walls of the building. Ceiling works
on both ground and second floor, and the comfort room on the ground floor are still in
progress. Also, we have started doing the paintworks on the ground floor. On the third floor,
50% of the ceiling has already been finished and concreting is still on-going. Meanwhile, we
cannot work on the upper level since it is still in the process of curing; thus we are focusing
our works on the first two floors. Since phase I of the building is already complete, we are
currently working on phase II which is expected to finish this year.

Very truly yours,

LUZLYN JOY R. TUAYON


University Engineer
Negros Oriental State University