ECDIS FAILURE
To be used for ECDIS failure.
Should be placed in the bridge.
BRIDGE CHECK LIST
ECDIS Failure
A. Description Personnel responsible Completed
If a single unit failure, use the second system, inform
1. the Master and Navigator and instigate defect OOW/Master/ Navigator
rectification.
In the event of a power failure and both systems revert
2. to UPS supply, consider a controlled shut down of one OOW/Master/ Navigator
and inform the Master and Navigator.
In a timely manner to coincide with the expiry of the
3. OOW
UPS on the first system, restart the second.
On restoration following a power failure or uncontrolled
4. shut down of the system, confirm that there are power OOW
supplies to each system.
Check ECDIS check- off cards to ensure that settings
OOW
are correct, in particular:
• Anti-grounding cone. OOW
• Safety depth. OOW
5. • Safety contour. OOW
• Velocity vector. OOW
• Units. OOW
• Chart priority. OOW
• Chart auto load. OOW
Check that the Primary and Secondary position sources
6. OOW
are selected and working correctly.
Confirm that the heading source is selected and
7. OOW
working correctly.
8. Confirm that RIO is operating correctly. OOW
9. Check current position. OOW
Verify that own vessel shape is correct and that the
10. OOW
ship is aligned to ship’s head.
11. Conduct Alarm self-test. OOW
B. Other
REMARKS
Area Of Incident:
Lat.: - Long.:
Date: Nav. Officer: Master:
This checklist should be placed in the bridge & be used for ECDIS failure.
Page 1 of 1
Explore more: www.sqemarine.com/shipmanuals & www.sqemarine.com/systems