Cutting Machine Check Sheet: Machine Set No.: Department: Contractor Name: Last Inspection Date: Inspection Date

The document is a checklist for inspecting a cutting machine. It lists 12 items to check such as ensuring the wheel guard covers 3/4 of the area, the cutting wheel is without cracks, the rear handle has no damage, and that an ELCB is available at the power source or within 2 meters. The checklist is used to inspect the machine and sign off by representatives of the contracting agency and VL.

Uploaded by

partha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views1 page

Cutting Machine Check Sheet: Machine Set No.: Department: Contractor Name: Last Inspection Date: Inspection Date

The document is a checklist for inspecting a cutting machine. It lists 12 items to check such as ensuring the wheel guard covers 3/4 of the area, the cutting wheel is without cracks, the rear handle has no damage, and that an ELCB is available at the power source or within 2 meters. The checklist is used to inspect the machine and sign off by representatives of the contracting agency and VL.

Uploaded by

partha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CUTTING MACHINE CHECK SHEET

Machine Set No.:


Department :
Contractor Name :
Last Inspection date :

Inspection date :

Sl. No. Check list OK Not OK NA Remarks


Wheel guard(covering ¾ area)
1
Cutting wheel without crack
2
Rear handle without damage
3
Presence cord strain reliever(Glands)
4
Trigger switch without damage.
5
Electric wire without cuts and joints.
6
Is ELCB available at the power source
(Repair Box) or at a maximum distance
7 of 2M from it?
Is ELCB tripping Checked
8
Body earthling incase of metal body
9
Power cable properly terminated
with gland
10
Presence of switch (on/off)
11
Any other points
12
Inspected By

Contract Agency Representative Sign Date & Time

VL Representative Sign Date & Time