Chapter 5 Air Transport Request Analysis
Chapter 5 Air Transport Request Analysis
                                                                                                 Region
                             Education /
          Region                                 Tourism        Trading       Industry          Hierarchy
                             Technology
   1 Jakarta                                                                                    
   2 Bandung                                                         
   3 Yogyakarta                                      
   4 Surabaya                                                                      
   5 Bali                                             
   6 Banten                                                                       
Source: Consultant analyzed result year 2008
From appearance table is upper psychologically interrelationship between regional kota/ is resulted
existence of domination of equality of potency wisata, then the relation of activity pendidikan/teknologi,
industry and commerce. Condition of this tables gives indication that request of air transport route of
region exit Banten related to network affiliate wisata in Indonesia.
assumption of Subdividing of potensi/karakter wilayah/kota purpose of this journey which will become
one of variable to determine passenger volume base number in compiling projection of passenger in the
future.
1. Jumlah pelaku perjalanan yang berpotensi menggunakan jasa angkutan udara adalah 53,11% dari
   responden
2. Jumlah calon penumpang yang didukung factor ekonomi adalah 27,9% dari jumlah responden.
3. Jumlah pelaku perjalanan berdasarkan motivasi pelaku perjalanan adalah:
   a. Perjalanan dinas/ tugas kantor     : 4,15% x 53,11%           =2,20%
   b. Urusan bisnis / usaha              : 5,39% x 53,11%           =1,89%
   c. Kunjungan keluarga/ social         : 17,43 x 5,11%                   =9,25%
   d. Rekreasi/wisata                    : 58,09% x 53,11%                 =30,85%
   e. Keperluan Lain                     : 14,94% x53,11%                  = 7,93%
4. Jumlah pelaku perjalanan berdasarkan motivasi perjalanan dan kemampuan ekonomi adalah:
From assumption calculation air transport service passenger potency base number in region Banten is
obtained number of penumpangh 53 one way passengers divided to become some town’s purpose of
air transport.
Air transport service passenger potency analysis resume done by merging condition of economics,
questionnaire, transportation service user of air, and utilization of usage of Airport facility is scored a
point [by] air transport passenger base in region Banten is 53 one way perhari passengers or 106
passengers perhari two directions or rounded up [by] 38690 passengers pertahun two directions.
With result of projection of earnings of perkapita which has been elaborated in front of yielded [by] cargo
volume base number is 2333ton/ year in the year 2008.
Like has been elaborated at chapter sub is upper, that air transport route wanted through responder
answer can be functioned as indication base to determine air transport route from and to region Banten
Selatan. Result from air transport route analysis gives information that choice route submitted
psychologically gives picture existence of interrelationship of town purpose of that one with other.
Indication emerging at the time of analysis between it:
1. Intercity interrelationship to potency wisata and culture.
2. Interrelationship of anatar town to education potency
3. Interrelationship of anatar town to commercial sector potency
4. Interrelationship of anatar town to sector potency industry
Hasil analisis jawaban responden yang telah dilakukan memberikan proporsi rute penerbangan sebagai
berikut:
Air traffic volume will determine area and airport facility which must be provided. Airport will serve some
activities so that volume every activity will have an effect on. Air traffic volume in general can be
formulated as model following:
           Dimana:
           Y         : Variabel dependen ( jumlah penumpang, kargo, dan pos)
           x1….xn :Explanatory Variables
           a1….an :Parameter Model
Keuntungan model ini adalah bahwa secara explicit dapat siketahui nilai elastisitas demand dengan
melihat nilai parameter model.
                                                        Pertumbuhan
           TAHUN             PESIMIS (%)               MODERAT (%)                  OPTIMIS (%)
            2008                    -                          -                             -
            2010                  2.04                       3.14                           5.18
            2015                  2.02                       3.09                           4.7
            2020                  2.00                       3.05                           4.63
            2025                  1.99                       3.02                           4.58
         2030                  1.99                          3.02                           4.58
Source: Consultant analyzed result year 2008
Hasil prakiraan permintaan jasa angkutan udara tahunan adalah sebagaimana tertera dalam Tabel 5.5
berikut:
sectors like: fishery, plantation, agrobisnis, industry processing ( bases on forestry and agriculture), and
tourism.
Step of main priority in supporting this program covers opens and or increases mobility nodes
connecting Wilayah Banten Selatan with other region. This strategic plan it is of course implication at
the importance of opening of air transport routes, remembers strategic of role of air transport in
supporting this sub-province region mobility with other region.
To determine movement magnitude forecast of daily plane is required existence of data specification of
plan plane which will be operated, air transport route plan and air transport service demand forecasting.
projection of Movement of daily aeroplane alighted from annual passenger volume per route. By paying
attention to type, capacities and load faktorpesawat air 0,7 will be able to be obtained number of
movement of plane. Operation pattern some airline merging some routes purpose of in one air transport
sectors. This thing is because still at least requests of one of the route and existence of the same air
transport sector. For example is route Banten-Bandung, Banten-Yogyakarta becomes Banten-Bandung-
Yogyakarta, Banten-Jakarta, Banten-Bali becomes Banten-Jakarta-Bali, Banten-Surabaya, and Banten-
Bali becomes Banten-Surabaya-Bali etcetera.
Hereinafter projection of movement of aeroplane to span time 20 years ( 2010-2030) done by taking
2(dua) condition or scenario different route configuraton that is:
From condition of air transport passenger forecast is region [by] Banten Selatan poured by kedalam 3
( three) scenario pessimist, moderate, and optimism, hence calculation with scenario moderate looked
into to be most relevant with condition of regional potency and economics of public as fluent supporter
of Airport operational in region Banten Selatan.
To know how far number of movement of plane serving air transport and plane capacities ( load factor)
in region Banten Selatan, can be presented at tables of following
:
Tabel 5.8 Jarak Tempuh Kota Tujuan Penerbangan
                                JARA       MINIMUM
    N                           K          PESAWAT
            KOTA TUJUAN
    o                                      YANG
                                (km)       DIOPERASIKAN
Tabel 5.9 Proyeksi Pergerakan Pesawat Harian 2 Arah Per Rute Pola Rute (1)
                                                                               Tahun
                                   Deskripsi
                                                       2008      2010       2015 2020             2025        2030
   Rute Penerbangan           Prediksi
                              Penumpang                   105         112       131        151        177      206
                              Harian per hari
 BNT-BDG                                                   29         31         36         42         49       57
 BNT-DPS                                                   22         23         27         31         36       42
 BNT-HLM                                                   21         22         26         30         35       41
 BNT-YOG                                                   15         16         19         22         26       30
 BNT-SUB                                                   11         12         14         16         19       22
 BNT-MDN                                                    7          8          9         10         12       14
 PERGERAKAN
 PESAWAT
 BNT-BDG                      M-25                          1          1 -             -          -       -
                              M-50                    -          -                1          1          1 -
                              M-75                    -          -          -          -          -              1
                              Total Pax (Demand)            29         31         36         42         49      57
                              Total Available Seat          24         24         50         50         50      75
                              Load Faktor                 1,22        1,3       0,73       0,85       0,98    0,76
 BNT-DPS                      M-50                           1          1          1          1          1       1
                              Total Pax (Demand)            22         23         27         31         36      42
                              Total Available Seat          50         50         50         50         50      50
                              Load Faktor                 0,43       0,46       0,54       0,62       0,72    0,84
 BNT-HLM                      M-50                           1          1          1          1          1       1
                              Total Pax (Demand)            21         22         26         30         35      41
                              Total Available Seat          50         50         50         50         50      50
                              Load Faktor                 0,42       0,45       0,52       0,61       0,71    0,82
 BNT-YOG                      M-50                           1          1          1          1          1       1
                              Total Pax (Demand)            15         16         19         22         26      30
                              Total Available Seat          50         50         50         50         50      50
                              Load Faktor                 0,31       0,33       0,38       0,45       0,52     0,6
 BNT-SUB                      M-50                           1          1          1          1          1       1
                              Total Pax (Demand)            11         12         14         16         19      22
                              Total Available Seat          50         50         50         50         50      50
PT UNIFIKASI PROFESIONAL MEDIA CONSULTANT                                                                      5-9
FINAL REPORT
COMPILATION WORK OF DETAIL ENGINEERING DESIGN OF SOUTHERN BANTEN AIRPORT AIRSIDE FACILITY
                                                              CHAPTER 5 AIR TRANSPORT REQUEST ANALYSIS
Tabel 5.10 Proyeksi Pergerakan Pesawat Harian 2 Arah Per Rute Pola Rute (2)
                                                                                     Tahun
                                    Deskripsi
                                                            2008      2010        2015 2020           2025          2030
   Rute Penerbangan           Prediksi
                              Penumpang                      105           112        131       151       177        206
                              Harian per hari
 BNT-BDG                                                         29        31          36       42        49             57
 BNT-DPS                                                         22        23          27       31        36             42
 BNT-HLM                                                         21        22          26       30        35             41
 BNT-YOG                                                         15        16          19       22        26             30
 BNT-SUB                                                         11        12          14       16        19             22
 BNT-MDN                                                          7         8           9       10        12             14
 PERGERAKAN
 PESAWAT
 BNT-BDG-YOG               M-25                         -             -           -         -         -         -
                           M-50                                  1            1           1 -         -         -
                           M-75                         -             -           -               1      1      1
                           Total Pax (Demand)                 45            48          56       65     75     87
                           Total Available Seat               50            50          50       75     75     75
                           Load Faktor                      0,90          0,95        1,11     0,86   1,00   1,16
 BNT-SUB-DPS               M-50                                1             1           1        1 -      -
                           Total Pax (Demand)           -             -           -          -           1      1
                           Total Available Seat               33            35          41       48     55     64
                           Load Faktor                      0,66          0,70        0,82     0,95   0,74   0,85
 BNT-HLM                   M-50                                1             1           1        1      1      1
                           Total Pax (Demand)                 21            22          26       30     35     41
                           Total Available Seat               50            50          50       50     50     50
                           Load Faktor                      0,42          0,45        0,52     0,61   0,71   0,82
 BNT-MDN                   M-75                                1             1           1        1      1      1
                           Total Pax (Demand)                  7             8           9       10     12     14
                           Total Available Seat               75            75          75       75     75     75
                           Load Faktor                       0,1           0,1        0,12     0,14   0,16   0,19
 JUMLAH PERGERAKAN PESAWAT
                                                             1            1           2         2         3          3
 HARIAN DENGAN LOAD FAKTOR > 0.70
Source: Consultant analyzed result year 2008
Tabel 5.11 Rute dan Tahun Layak Terbang 2 Arah (Pola Rute 1)
Tabel 5.12 Rute dan Tahun Layak Terbang 2 Arah (Pola Rute 2)
From result of visible above air transport route analysis that: Airport Banten Selatan at route pattern 1
actually starts can operate on the year 2008 with route Banten-Bandung applies type plane M-25 with
capacities 25 seat. This thing seen from amounts demand which is available in the year. While for route
PT UNIFIKASI PROFESIONAL MEDIA CONSULTANT                                                          5-11
FINAL REPORT
COMPILATION WORK OF DETAIL ENGINEERING DESIGN OF SOUTHERN BANTEN AIRPORT AIRSIDE FACILITY
                                                              CHAPTER 5 AIR TRANSPORT REQUEST ANALYSIS
pattern 2 can start operates on the year 2008 with route Banten-Bandung-Yogyakarta applies plane
type M-50.
Cp = (1.38 / )
Dimana:
Vp         : jumlah Penumpang Pada Saat Jam Sibuk
Mc         :Jumlah Penumpang Harian
Md         :Jumlah Pesawat Harian
Cp         :Koefisien Pada Saat Jam Sibuk
Tabel 5.13 Pergerakan Penumpang Pada Saat Jam Sibuk (2 Arah) Terhadap Total
Penumpang
                                                                     Tahun
                 Deskripsi
                                           2008        2010       2015 2020        2025     2030
 Vol. Penumpang Harian                       106         113       131     153      178      206
 Pergerakan Pswt Harian                         1          1          1      1         3        3
 Koefisien Pnp Jam Sibuk                     1,38       1,38       1,38   1,38      0,80     0,80
 Vol. Penumpang Pada Saat
                                           146          156       181     211       142     164
 Jam Sibuk
Source: Consultant analyzed result year 2008
Tabel 5.14 Pergerakan Penumpang Pada Saat Jam Sibuk (2 Arah) Terhadap Rute yang
Dilayani
                                                                     Tahun
                 Deskripsi
                                              2008     2010       2015 2020        2025     2030
 Vol. Penumpang yg dilayani Harian               29       31         36     42      120      140
 Pergerakan Pswt Harian                           1        1          1      1         3        3
 Koefisien Pnp Jam Sibuk                       1,38     1,38       1,38   1,38      0,80     0,80
                                                                    Tahun
             Jenis Pesawat
                                              2008     2010      2015 2020          2025     2030
 M-25                                            6        6
 M-50                                                                  4        4        3      2
 M-75                                                                                           1
 Jumlah Pesawat Jam Sibuk                      40         43       50        58       96      112
 Total Pax (Demand)                          146         156      181       211      142      164
 Total Available Seat                        150        150       200      200      150      175
 Load Factor                                 0,98       1,04      0,91     1,06     0,94     0,94
Source: Consultant analyzed result year 2008
                             PERTUMBUHAN
 TAHUN         PESIMIS         MODERAT               OPTIMIS
                 (%)             (%)                   (%)
   2008            -               -                     -
   2010          1,14            2,42                  5,78
   2015          1,14            2,42                  5,03
   2020          1,14            2,42                  4,78
   2025          1,14            2,42                  4,78
   2030          1,14            2,42                  4,78