Machinery Hire and Conveyance Rates
Machinery Hire and Conveyance Rates
2 Lead up to 2 Km:
  Out put     =           5.00 Cum                        Rate      Per             Amount
      0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.    346.90     Hour     Rs.    72.85
      0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.    320.80     Hour     Rs.    67.37
      0.21 Hrs. crew charges of Tipper 5.00 Cum @        186.20     Hour     Rs.    39.10
      0.20 add area allowance at 20% on Rs.               39.10              Rs.     7.82
           Rate for       5.00 Cum                                           Rs.   187.14
           Rate for       1.00 Cum                                           Rs.    37.43
      0.14 add overheads and contractors profit at        37.43     Hour     Rs.     5.10
           13.615% on Rs.
              Total rate for          1.00 Cum                               Rs.   42.53
3 Lead up to 3 Km:
  Out put      =          5.00 Cum                        Rate      Per             Amount
      0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.    346.90     Hour     Rs.    97.13
      0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.    320.80     Hour     Rs.    89.82
      0.28 Hrs. crew charges of Tipper 5.00 Cum @        186.20     Hour     Rs.    52.14
      0.20 Rs.
           add area allowance at 20% on Rs.               52.14              Rs.    10.43
           Rate for       5.00 Cum                                           Rs.   249.52
           Rate for       1.00 Cum                                           Rs.     49.9
      0.14 add overheads and contractors profit at        49.90     Hour     Rs.     6.79
           13.615% on Rs.
              Total rate for          1.00 Cum                               Rs.   56.69
4 Lead up to 4 Km:
  Out put     =           5.00 Cum                       Rate    Per           Amount
      0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   117.95
      0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   109.07
      0.34 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    63.31
      0.20 add area allowance at 20% on Rs.              63.31          Rs.    12.66
           Rate for       5.00 Cum                                      Rs.   302.99
           Rate for       1.00 Cum                                      Rs.    60.60
      0.14 add overheads and contractors profit at      60.60    Hour   Rs.     8.25
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   68.85
5 Lead up to 5 Km:
  Out put     =           5.00 Cum                       Rate    Per           Amount
      0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   138.76
      0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   128.32
      0.40 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    74.48
      0.20 add area allowance at 20% on Rs.              74.48          Rs.    14.90
           Rate for       5.00 Cum                                      Rs.   356.46
           Rate for       1.00 Cum                                      Rs.    71.29
      0.14 add overheads and contractors profit at      71.29    Hour   Rs.     9.71
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   81.00
2 Lead up to 2 Km:
  Out put     =           5.00 Cum                       Rate    Per           Amount
      0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.    72.85
      0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.    67.37
      0.21 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    39.10
      0.20 add area allowance at 20% on Rs.              39.10          Rs.     7.82
           Rate for       5.00 Cum                                      Rs.   187.14
           Rate for       1.00 Cum                                      Rs.    37.43
      0.14 add overheads and contractors profit at      37.43    Hour   Rs.     5.10
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   42.53
3 Lead up to 3 Km:
  Out put     =           5.00 Cum                       Rate    Per           Amount
      0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.    97.13
      0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.    89.82
      0.28 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    52.14
      0.20 add area allowance at 20% on Rs.              52.14          Rs.    10.43
           Rate for       5.00 Cum                                      Rs.   249.52
           Rate for       1.00 Cum                                      Rs.     49.9
      0.14 add overheads and contractors profit at      49.90    Hour   Rs.     6.79
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   56.69
4 Lead up to 4 Km:
  Out put      =          5.00 Cum                       Rate    Per           Amount
      0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   117.95
      0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   109.07
      0.34 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    63.31
      0.20 Rs.
           add area allowance at 20% on Rs.              63.31          Rs.    12.66
           Rate for       5.00 Cum                                      Rs.   302.99
           Rate for       1.00 Cum                                      Rs.     60.6
      0.14 add overheads and contractors profit at      60.60    Hour   Rs.     8.25
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   68.85
5 Lead up to 5 Km:
  Out put     =           5.00 Cum                       Rate    Per           Amount
      0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   138.76
      0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   128.32
      0.40 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    74.48
      0.20 add area allowance at 20% on Rs.              74.48          Rs.    14.90
           Rate for       5.00 Cum                                      Rs.   356.46
           Rate for       1.00 Cum                                      Rs.    71.29
      0.14 add overheads and contractors profit at      71.29    Hour   Rs.     9.71
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   81.00
2 Lead up to 2 Km:
  Out put     =           8.00 MT                        Rate    Per            Amount
      0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour    Rs.    72.85
      0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour    Rs.    67.37
      0.21 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour    Rs.    39.10
      0.20 add area allowance at 20% on Rs.              39.10           Rs.     7.82
           Rate for       8.00 MT                                        Rs.   187.14
           Rate for       1.00 MT                                        Rs.    23.39
      0.14 add overheads and contractors profit at      23.39    Hour    Rs.     3.18
           13.615% on Rs.
            Total rate for          1.00 MT                              Rs.   26.57
3 Lead up to 3 Km:
  Out put      =          8.00 MT                        Rate    Per            Amount
      0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour    Rs.    97.13
      0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour    Rs.    89.82
      0.28 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour    Rs.    52.14
      0.20 Rs.
           add area allowance at 20% on Rs.              52.14           Rs.    10.43
           Rate for       8.00 MT                                        Rs.   249.52
           Rate for       1.00 MT                                        Rs.    31.19
      0.14 add overheads and contractors profit at      31.19    Hour    Rs.     4.25
           13.615% on Rs.
            Total rate for          1.00 MT                              Rs.   35.44
4 Lead up to 4 Km:
  Out put     =           8.00 MT                        Rate    Per           Amount
      0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   117.95
      0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   109.07
      0.34 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    63.31
      0.20 add area allowance at 20% on Rs.              63.31          Rs.    12.66
           Rate for       8.00 MT                                       Rs.   302.99
           Rate for       1.00 MT                                       Rs.    37.87
      0.14 add overheads and contractors profit at      37.87    Hour   Rs.     5.16
           13.615% on Rs.
            Total rate for          1.00 MT                             Rs.   43.03
5 Lead up to 5 Km:
  Out put      =          8.00 MT                        Rate    Per           Amount
      0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   138.76
      0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   128.32
      0.40 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    74.48
      0.20 Rs.
           add area allowance at 20% on Rs.              74.48          Rs.    14.90
           Rate for       8.00 MT                                       Rs.   356.46
           Rate for       1.00 MT                                       Rs.    44.56
      0.14 add overheads and contractors profit at      44.56    Hour   Rs.     6.07
           13.615% on Rs.
            Total rate for          1.00 MT                             Rs.   50.63
2 Lead up to 2 Km:
  Out put     =           3.40 Cum                       Rate    Per           Amount
      0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.    72.85
      0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.    67.37
      0.21 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    39.10
      0.20 add area allowance at 20% on Rs.              39.10          Rs.     7.82
           Rate for       3.40 Cum                                      Rs.   187.14
           Rate for       1.00 Cum                                      Rs.    55.04
      0.14 add overheads and contractors profit at      55.04    Hour   Rs.     7.49
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   62.53
3 Lead up to 3 Km:
  Out put     =           3.40 Cum                       Rate    Per           Amount
      0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.    97.13
      0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.    89.82
      0.28 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    52.14
      0.20 add area allowance at 20% on Rs.              52.14          Rs.    10.43
           Rate for       3.40 Cum                                      Rs.   249.52
           Rate for       1.00 Cum                                      Rs.    73.39
      0.14 add overheads and contractors profit at      73.39    Hour   Rs.     9.99
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   83.38
4 Lead up to 4 Km:
  Out put      =          3.40 Cum                       Rate    Per           Amount
      0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   117.95
      0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   109.07
      0.34 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    63.31
      0.20 Rs.
           add area allowance at 20% on Rs.              63.31          Rs.    12.66
           Rate for       3.40 Cum                                      Rs.   302.99
           Rate for       1.00 Cum                                      Rs.    89.11
      0.14 add overheads and contractors profit at      89.11    Hour   Rs.    12.13
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   101.24
5 Lead up to 5 Km:
  Out put     =           3.40 Cum                       Rate    Per           Amount
      0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.   346.90   Hour   Rs.   138.76
      0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.   320.80   Hour   Rs.   128.32
      0.40 Hrs. crew charges of Tipper 5.00 Cum @       186.20   Hour   Rs.    74.48
      0.20 add area allowance at 20% on Rs.              74.48          Rs.    14.90
           Rate for       3.40 Cum                                      Rs.   356.46
           Rate for       1.00 Cum                                      Rs.   104.84
      0.14 add overheads and contractors profit at      104.84   Hour   Rs.    14.27
           13.615% on Rs.
            Total rate for          1.00 Cum                            Rs.   119.11
2 Lead up to 2 Km:
  Out put     =          8000 Ltrs                          Rate    Per          Amount
      0.21 Hrs. hire charges of water tanker 8000 ltrs     342.60   Hour   Rs.   71.95
           capacity @ Rs.
        0.21 Hrs. fuel charges of water tanker 8000 ltrs   320.80   Hour   Rs.   67.37
             capacity @ Rs.
        0.21 Hrs. crew charges of water tanker 8000 ltrs   186.20   Hour   Rs.   39.10
             capacity @ Rs.
        0.20 add area allowance at 20% on Rs.              39.10           Rs.     7.82
             Rate for       8000 Ltrs                                      Rs.   186.24
             Rate for       1000 Ltrs                                      Rs.    23.28
        0.14 add overheads and contractors profit at       23.28           Rs.     3.17
             13.615% on Rs.
             Total rate for           1000 Ltrs                            Rs.   26.45
3 Lead up to 3 Km:
  Out put     =          8000 Ltrs                          Rate    Per          Amount
      0.28 Hrs. hire charges of water tanker 8000 ltrs     342.60   Hour   Rs.   95.93
           capacity @ Rs.
        0.28 Hrs. fuel charges of water tanker 8000 ltrs   320.80   Hour   Rs.   89.82
             capacity @ Rs.
       0.28 Hrs. crew charges of water tanker 8000 ltrs   186.20   Hour   Rs.   52.14
            capacity @ Rs.
       0.20 add area allowance at 20% on Rs.              52.14           Rs.    10.43
            Rate for       8000 Ltrs                                      Rs.   248.32
            Rate for       1000 Ltrs                                      Rs.    31.04
       0.14 add overheads and contractors profit at       31.04           Rs.     4.23
            13.615% on Rs.
            Total rate for           1000 Ltrs                            Rs.   35.27
4 Lead up to 4 Km:
  Out put     =          8000 Ltrs                         Rate    Per           Amount
      0.34 Hrs. hire charges of water tanker 8000 ltrs    342.60   Hour   Rs.   116.48
           capacity @ Rs.
       0.34 Hrs. fuel charges of water tanker 8000 ltrs   320.80   Hour   Rs.   109.07
            capacity @ Rs.
       0.34 Hrs. crew charges of water tanker 8000 ltrs   186.20   Hour   Rs.   63.31
            capacity @ Rs.
       0.20 add area allowance at 20% on Rs.              63.31           Rs.    12.66
            Rate for       8000 Ltrs                                      Rs.   301.52
            Rate for       1000 Ltrs                                      Rs.    37.69
       0.14 add overheads and contractors profit at       37.69           Rs.     5.13
            13.615% on Rs.
            Total rate for           1000 Ltrs                            Rs.   42.82
5 Lead up to 5 Km:
  Out put     =          8000 Ltrs                         Rate    Per           Amount
      0.40 Hrs. hire charges of water tanker 8000 ltrs    342.60   Hour   Rs.   137.04
           capacity @ Rs.
       0.40 Hrs. fuel charges of water tanker 8000 ltrs   320.80   Hour   Rs.   128.32
            capacity @ Rs.
       0.40 Hrs. crew charges of water tanker 8000 ltrs   186.20   Hour   Rs.   74.48
            capacity @ Rs.
       0.20 add area allowance at 20% on Rs.              74.48           Rs.    14.90
            Rate for       8000 Ltrs                                      Rs.   354.74
            Rate for       1000 Ltrs                                      Rs.    44.34
       0.14 add overheads and contractors profit at       44.34           Rs.     6.04
            13.615% on Rs.
            Total rate for           1000 Ltrs                            Rs.   50.38
2 Lead up to 2 Km:
  Out put     =         3000 Nos                          Rate    Per          Amount
      0.21 Hrs. hire charges of Truck 10 Tonnes          321.50   Hour   Rs.   67.52
           capacity @ Rs.
      0.21 Hrs. fuel charges of Truck 10 Tonnes          320.80   Hour   Rs.   67.37
           capacity @ Rs.
      0.21 Hrs. crew charges of Truck 10 Tonnes          186.20   Hour   Rs.   39.10
           capacity @ Rs.
      0.20 add area allowance at 20% on Rs.              39.10           Rs.     7.82
           Rate for       3000 Nos                                       Rs.   181.81
           Rate for       1000 Nos                                       Rs.    60.60
      0.14 add overheads and contractors profit at       60.60           Rs.     8.25
           13.615% on Rs.
           Total rate for          1000 Nos                              Rs.   68.85
3 Lead up to 3 Km:
  Out put     =         3000 Nos                          Rate    Per          Amount
      0.28 Hrs. hire charges of Truck 10 Tonnes          321.50   Hour   Rs.   90.02
           capacity @ Rs.
      0.28 Hrs. fuel charges of Truck 10 Tonnes          320.80   Hour   Rs.   89.82
           capacity @ Rs.
      0.28 Hrs. crew charges of Truck 10 Tonnes          186.20   Hour   Rs.   52.14
           capacity @ Rs.
      0.20 add area allowance at 20% on Rs.              52.14           Rs.    10.43
           Rate for      3000 Nos                                        Rs.   242.41
           Rate for      1000 Nos                                        Rs.    80.80
      0.14 add overheads and contractors profit at       80.80           Rs.    11.00
           13.615% on Rs.
          Total rate for          1000 Nos                           Rs.   91.80
4 Lead up to 4 Km:
  Out put     =         3000 Nos                      Rate    Per           Amount
      0.34 Hrs. hire charges of Truck 10 Tonnes      321.50   Hour   Rs.   109.31
           capacity @ Rs.
      0.34 Hrs. fuel charges of Truck 10 Tonnes      320.80   Hour   Rs.   109.07
           capacity @ Rs.
      0.34 Hrs. crew charges of Truck 10 Tonnes      186.20   Hour   Rs.   63.31
           capacity @ Rs.
      0.20 add area allowance at 20% on Rs.          63.31           Rs.    12.66
           Rate for       3000 Nos                                   Rs.   294.35
           Rate for       1000 Nos                                   Rs.    98.12
      0.14 add overheads and contractors profit at   98.12           Rs.    13.36
           13.615% on Rs.
           Total rate for          1000 Nos                          Rs.   111.48
5 Lead up to 5 Km:
  Out put     =         3000 Nos                      Rate    Per           Amount
      0.40 Hrs. hire charges of Truck 10 Tonnes      321.50   Hour   Rs.   128.60
           capacity @ Rs.
      0.40 Hrs. fuel charges of Truck 10 Tonnes      320.80   Hour   Rs.   128.32
           capacity @ Rs.
      0.40 Hrs. crew charges of Truck 10 Tonnes      186.20   Hour   Rs.   74.48
           capacity @ Rs.
      0.20 add area allowance at 20% on Rs.          74.48           Rs.    14.90
           Rate for       3000 Nos                                   Rs.   346.30
           Rate for       1000 Nos                                   Rs.   115.43
      0.14 add overheads and contractors profit at   115.43          Rs.    15.72
           13.615% on Rs.
           Total rate for          1000 Nos                          Rs.   131.15
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
   slag, Stone for masonry work (per Cum):
   (i) Loading charges:
   Out put       =       5.50 Cum                       Rate       Per           Amount
             a) Labour:
        0.02 day Head mazdoor                          420.00      day    Rs.     8.40
        0.50 day Mazdoor                               370.00      day    Rs.   185.00
                                                                          Rs.   193.40
       0.20 add area allowance at 20% on Rs.           193.40             Rs.    38.68
            Total labour charges                                          Rs.   232.08
            Rate for       5.50 Cum                                       Rs.   232.08
            Rate for       1.00 Cum                                       Rs.     42.2
       0.14 add overheads and contractors profit at     42.20             Rs.     5.75
            13.615% on Rs.
            Total rate for           1.00 Cum                             Rs.    47.95
LOADING & UNLOADING CHARGES BY MANUAL MEANS (INCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
   (i) Loading charges:
   Out put       =       5.50 Cum                       Rate    Per          Amount
             a) Labour:
        0.01 day Head mazdoor                          420.00   day    Rs.     4.20
        0.25 day Mazdoor                               370.00   day    Rs.    92.50
                                                                       Rs.    96.70
       0.20 add area allowance at 20% on Rs.           96.70           Rs.    19.34
            Total labour charges                                       Rs.   116.04
            b) Machinery:
       0.50 Hrs. hire charges of Truck 10 Tonnes      321.50    Hour   Rs.   160.75
            capacity @ Rs.
       0.50 Hrs. fuel charges of Truck 10 Tonnes      320.80    Hour   Rs.   160.40
            capacity @ Rs.
       0.50 Hrs. crew charges of Truck 10 Tonnes      186.20    Hour   Rs.   93.10
            capacity @ Rs.
       0.20 add area allowance at 20% on Rs.           93.10           Rs.    18.62
            Total machinery charges                                    Rs.   432.87
            Total labour and machinery charges                            Rs.   548.91
            Rate for       5.50 Cum                                       Rs.   548.91
            Rate for       1.00 Cum                                       Rs.     99.8
       0.14 add overheads and contractors profit at     99.80             Rs.    13.59
            13.615% on Rs.
            Total rate for           1.00 Cum                             Rs.   113.39
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
   slag, Stone for machinery work (per Cum):
   (i) Loading charges:
   Out put       =       5.50 Cum                       Rate       Per           Amount
             a) Labour:
        0.02 day Head mazdoor                          420.00      day    Rs.     8.40
        0.50 day Mazdoor                               370.00      day    Rs.   185.00
                                                                          Rs.   193.40
       0.20 add area allowance at 20% on Rs.           193.40             Rs.    38.68
            Total labour charges                                          Rs.   232.08
            b) Machinery:
       0.50 Hrs. hire charges of Truck 10 Tonnes       321.50     Hour    Rs.   160.75
            capacity @ Rs.
       0.50 Hrs. fuel charges of Truck 10 Tonnes       320.80     Hour    Rs.   160.40
            capacity @ Rs.
       0.50 Hrs. crew charges of Truck 10 Tonnes       186.20     Hour    Rs.    93.10
            capacity @ Rs.
       0.20 add area allowance at 20% on Rs.            93.10             Rs.    18.62
            Total machinery charges                                       Rs.   432.87
            Total labour and machinery charges                            Rs.   664.95
            Rate for       5.50 Cum                                       Rs.   664.95
            Rate for       1.00 Cum                                       Rs.    120.9
       0.14 add overheads and contractors profit at    120.90             Rs.    16.46
            13.615% on Rs.
            Total rate for           1.00 Cum                             Rs.   137.36
   (ii) Unloading charges:
   Out put        =        5.50 Cum                   Rate     Per           Amount
              a) Labour:
         0.01 day Head mazdoor                        420.00   day    Rs.     4.20
         0.25 day Mazdoor                             370.00   day    Rs.    92.50
                                                                      Rs.    96.70
       0.20 add area allowance at 20% on Rs.          96.70           Rs.    19.34
            Total labour charges                                      Rs.   116.04
            b) Machinery:
       0.25 Hrs. hire charges of Truck 10 Tonnes      321.50   Hour   Rs.    80.38
            capacity @ Rs.
       0.25 Hrs. fuel charges of Truck 10 Tonnes      320.80   Hour   Rs.    80.20
            capacity @ Rs.
       0.25 Hrs. crew charges of Truck 10 Tonnes      186.20   Hour   Rs.    46.55
            capacity @ Rs.
       0.20 add area allowance at 20% on Rs.          46.55           Rs.     9.31
            Total machinery charges                                   Rs.   216.44
            Total labour and machinery charges                        Rs.   332.48
            Rate for       5.50 Cum                                   Rs.   332.48
            Rate for       1.00 Cum                                   Rs.    60.45
       0.14 add overheads and contractors profit at   60.45           Rs.     8.23
            13.615% on Rs.
            Total rate for           1.00 Cum                         Rs.    68.68
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
   slag, Stone for machinery work (per Cum):
   (i) Loading charges:
   Out put      =          5.50 Cum                     Rate       Per           Amount
             a) Machinery:
        0.17 Hrs. hire charges of Tipper 10 Tonnes     321.50     Hour    Rs.    54.66
             capacity @ Rs.
       0.17 Hrs. fuel charges of Tipper 10 Tonnes      320.80     Hour    Rs.    54.54
            capacity @ Rs.
       0.17 Hrs. crew charges of Tipper 10 Tonnes      186.20     Hour    Rs.    31.65
            capacity @ Rs.
       0.12 Hrs. FE loader 1.00 Cum bucket capacity @ 1432.00     Hour    Rs.   171.84
            45 Cum including Hire charges, fuel charges
            and crew charges @ Rs.
                                                                       PCC
                                  Rubble/Size    Cement/Steel/RC
                    Earth/Sand/                                    Slabs/Shabad
      Sl.   Lead in                Stone/Cut     C poles/A.C & G.I
                    Gravel/Murru                                    Slabs/CC &    Water     Bricks
      No     Kms                 Stone/Coarse     Sheets/Packed
                    m/Lime/Surki                                      Laterite
                                  aggregates         materials
                                                                   Blocks/Wood
###    1     1.00          0.00           0.00              0.00           0.00      0.00       0.00
       2     2.00         12.15          12.15              7.58          17.86      7.56      19.67
       3     3.00         26.31          26.31             16.45          38.71     16.38      42.62
       4     4.00         38.47          38.47             24.04          56.57     23.93      62.30
       5     5.00         50.62          50.62             31.64          74.44     31.49      81.97
       6     6.00         62.77          62.77             39.23          92.30     39.05     101.64
       7     7.00         74.92          74.92             46.82         110.16     46.61     121.31
       8     8.00         87.07          87.07             54.41         128.02     54.17     140.98
       9     9.00         99.22          99.22             62.00         145.88     61.73     160.65
      10    10.00        111.37         111.37             69.59         163.74     69.29     180.32
      11    11.00        123.52         123.52             77.18         181.60     76.85     199.99
      12    12.00        135.67         135.67             84.77         199.46     84.41     219.66
      13    13.00        147.82         147.82             92.36         217.32     91.97     239.33
      14    14.00        159.97         159.97             99.95         235.18     99.53     259.00
      15    15.00        172.12         172.12            107.54         253.04    107.09     278.67
      16    16.00        184.27         184.27            115.13         270.90    114.65     298.34
      17    17.00        196.42         196.42            122.72         288.76    122.21     318.01
      18    18.00        208.57         208.57            130.31         306.62    129.77     337.68
      19    19.00        220.72         220.72            137.90         324.48    137.33     357.35
      20    20.00        232.87         232.87            145.49         342.34    144.89     377.02
      21    21.00        245.02         245.02            153.08         360.20    152.45     396.69
      22    22.00        257.17         257.17            160.67         378.06    160.01     416.36
      23    23.00        269.32         269.32            168.26         395.92    167.57     436.03
      24    24.00        281.47         281.47            175.85         413.78    175.13     455.70
      25    25.00        293.62         293.62            183.44         431.64    182.69     475.37
      26    26.00        305.77         305.77            191.03         449.50    190.25     495.04
      27    27.00        317.92         317.92            198.62         467.36    197.81     514.71
      28    28.00        330.07         330.07            206.21         485.22    205.37     534.38
      29    29.00        342.22         342.22            213.80         503.08    212.93     554.05
      30    30.00        354.37         354.37            221.39         520.94    220.49     573.72
      31    31.00        364.49         364.49            227.72         535.83    226.78     590.11
      32    32.00        374.61         374.61            234.05         550.72    233.07     606.50
      33    33.00        384.73         384.73            240.38         565.61    239.36     622.89
      34    34.00        394.85         394.85            246.71         580.50    245.65     639.28
      35    35.00        404.97         404.97            253.04         595.39    251.94     655.67
      36    36.00        415.09         415.09            259.37         610.28    258.23     672.06
      37    37.00        425.21         425.21            265.70         625.17    264.52     688.45
      38    38.00        435.33         435.33            272.03         640.06    270.81     704.84
      39    39.00        445.45         445.45            278.36         654.95    277.10     721.23
      40    40.00        455.57         455.57            284.69         669.84    283.39     737.62
      41    41.00        465.69         465.69            291.02         684.73    289.68     754.01
      42    42.00        475.81         475.81            297.35         699.62    295.97     770.40
      43    43.00        485.93         485.93            303.68         714.51    302.26     786.79
      44    44.00        496.05         496.05            310.01         729.40    308.55     803.18
      45    45.00        506.17         506.17            316.34         744.29    314.84     819.57
      46    46.00        516.29         516.29            322.67         759.18    321.13     835.96
      47    47.00        526.41         526.41            329.00         774.07    327.42     852.35
      48    48.00        536.53         536.53            335.33         788.96    333.71     868.74
      49    49.00        546.65         546.65            341.66         803.85    340.00     885.13
      50    50.00        556.77         556.77            347.99         818.74    346.29     901.52
      51    51.00        566.89         566.89            354.32         833.63    352.58     917.91
      52    52.00        577.01         577.01            360.65         848.52    358.87     934.30
 53    53.00    587.13    587.13   366.98    863.41   365.16    950.69
 54    54.00    597.25    597.25   373.31    878.30   371.45    967.08
 55    55.00    607.37    607.37   379.64    893.19   377.74    983.47
 56    56.00    617.49    617.49   385.97    908.08   384.03    999.86
 57    57.00    627.61    627.61   392.30    922.97   390.32   1016.25
 58    58.00    637.73    637.73   398.63    937.86   396.61   1032.64
 59    59.00    647.85    647.85   404.96    952.75   402.90   1049.03
 60    60.00    657.97    657.97   411.29    967.64   409.19   1065.42
 61    61.00    668.09    668.09   417.62    982.53   415.48   1081.81
 62    62.00    678.21    678.21   423.95    997.42   421.77   1098.20
 63    63.00    688.33    688.33   430.28   1012.31   428.06   1114.59
 64    64.00    698.45    698.45   436.61   1027.20   434.35   1130.98
 65    65.00    708.57    708.57   442.94   1042.09   440.64   1147.37
 66    66.00    718.69    718.69   449.27   1056.98   446.93   1163.76
 67    67.00    728.81    728.81   455.60   1071.87   453.22   1180.15
 68    68.00    738.93    738.93   461.93   1086.76   459.51   1196.54
 69    69.00    749.05    749.05   468.26   1101.65   465.80   1212.93
 70    70.00    759.17    759.17   474.59   1116.54   472.09   1229.32
 71    71.00    769.29    769.29   480.92   1131.43   478.38   1245.71
 72    72.00    779.41    779.41   487.25   1146.32   484.67   1262.10
 73    73.00    789.53    789.53   493.58   1161.21   490.96   1278.49
 74    74.00    799.65    799.65   499.91   1176.10   497.25   1294.88
 75    75.00    809.77    809.77   506.24   1190.99   503.54   1311.27
 76    76.00    819.89    819.89   512.57   1205.88   509.83   1327.66
 77    77.00    830.01    830.01   518.90   1220.77   516.12   1344.05
 78    78.00    840.13    840.13   525.23   1235.66   522.41   1360.44
 79    79.00    850.25    850.25   531.56   1250.55   528.70   1376.83
 80    80.00    860.37    860.37   537.89   1265.44   534.99   1393.22
 81    81.00    870.49    870.49   544.22   1280.33   541.28   1409.61
 82    82.00    880.61    880.61   550.55   1295.22   547.57   1426.00
 83    83.00    890.73    890.73   556.88   1310.11   553.86   1442.39
 84    84.00    900.85    900.85   563.21   1325.00   560.15   1458.78
 85    85.00    910.97    910.97   569.54   1339.89   566.44   1475.17
 86    86.00    921.09    921.09   575.87   1354.78   572.73   1491.56
 87    87.00    931.21    931.21   582.20   1369.67   579.02   1507.95
 88    88.00    941.33    941.33   588.53   1384.56   585.31   1524.34
 89    89.00    951.45    951.45   594.86   1399.45   591.60   1540.73
 90    90.00    961.57    961.57   601.19   1414.34   597.89   1557.12
 91    91.00    971.69    971.69   607.52   1429.23   604.18   1573.51
 92    92.00    981.81    981.81   613.85   1444.12   610.47   1589.90
 93    93.00    991.93    991.93   620.18   1459.01   616.76   1606.29
 94    94.00   1002.05   1002.05   626.51   1473.90   623.05   1622.68
 95    95.00   1012.17   1012.17   632.84   1488.79   629.34   1639.07
 96    96.00   1022.29   1022.29   639.17   1503.68   635.63   1655.46
 97    97.00   1032.41   1032.41   645.50   1518.57   641.92   1671.85
 98    98.00   1042.53   1042.53   651.83   1533.46   648.21   1688.24
 99    99.00   1052.65   1052.65   658.16   1548.35   654.50   1704.63
100   100.00   1062.77   1062.77   664.49   1563.24   660.79   1721.02
101   101.00   1072.89   1072.89   670.82   1578.13   667.08   1737.41
102   102.00   1083.01   1083.01   677.15   1593.02   673.37   1753.80
103   103.00   1093.13   1093.13   683.48   1607.91   679.66   1770.19
104   104.00   1103.25   1103.25   689.81   1622.80   685.95   1786.58
105   105.00   1113.37   1113.37   696.14   1637.69   692.24   1802.97
106   106.00   1123.49   1123.49   702.47   1652.58   698.53   1819.36
107   107.00   1133.61   1133.61   708.80   1667.47   704.82   1835.75
108   108.00   1143.73   1143.73   715.13   1682.36   711.11   1852.14
109   109.00   1153.85   1153.85   721.46   1697.25   717.40   1868.53
110   110.00   1163.97   1163.97   727.79   1712.14   723.69   1884.92
111   111.00   1174.09   1174.09   734.12   1727.03   729.98   1901.31
112   112.00   1184.21   1184.21    740.45   1741.92    736.27   1917.70
113   113.00   1194.33   1194.33    746.78   1756.81    742.56   1934.09
114   114.00   1204.45   1204.45    753.11   1771.70    748.85   1950.48
115   115.00   1214.57   1214.57    759.44   1786.59    755.14   1966.87
116   116.00   1224.69   1224.69    765.77   1801.48    761.43   1983.26
117   117.00   1234.81   1234.81    772.10   1816.37    767.72   1999.65
118   118.00   1244.93   1244.93    778.43   1831.26    774.01   2016.04
119   119.00   1255.05   1255.05    784.76   1846.15    780.30   2032.43
120   120.00   1265.17   1265.17    791.09   1861.04    786.59   2048.82
121   121.00   1275.29   1275.29    797.42   1875.93    792.88   2065.21
122   122.00   1285.41   1285.41    803.75   1890.82    799.17   2081.60
123   123.00   1295.53   1295.53    810.08   1905.71    805.46   2097.99
124   124.00   1305.65   1305.65    816.41   1920.60    811.75   2114.38
125   125.00   1315.77   1315.77    822.74   1935.49    818.04   2130.77
126   126.00   1325.89   1325.89    829.07   1950.38    824.33   2147.16
127   127.00   1336.01   1336.01    835.40   1965.27    830.62   2163.55
128   128.00   1346.13   1346.13    841.73   1980.16    836.91   2179.94
129   129.00   1356.25   1356.25    848.06   1995.05    843.20   2196.33
130   130.00   1366.37   1366.37    854.39   2009.94    849.49   2212.72
131   131.00   1376.49   1376.49    860.72   2024.83    855.78   2229.11
132   132.00   1386.61   1386.61    867.05   2039.72    862.07   2245.50
133   133.00   1396.73   1396.73    873.38   2054.61    868.36   2261.89
134   134.00   1406.85   1406.85    879.71   2069.50    874.65   2278.28
135   135.00   1416.97   1416.97    886.04   2084.39    880.94   2294.67
136   136.00   1427.09   1427.09    892.37   2099.28    887.23   2311.06
137   137.00   1437.21   1437.21    898.70   2114.17    893.52   2327.45
138   138.00   1447.33   1447.33    905.03   2129.06    899.81   2343.84
139   139.00   1457.45   1457.45    911.36   2143.95    906.10   2360.23
140   140.00   1467.57   1467.57    917.69   2158.84    912.39   2376.62
141   141.00   1477.69   1477.69    924.02   2173.73    918.68   2393.01
142   142.00   1487.81   1487.81    930.35   2188.62    924.97   2409.40
143   143.00   1497.93   1497.93    936.68   2203.51    931.26   2425.79
144   144.00   1508.05   1508.05    943.01   2218.40    937.55   2442.18
145   145.00   1518.17   1518.17    949.34   2233.29    943.84   2458.57
146   146.00   1528.29   1528.29    955.67   2248.18    950.13   2474.96
147   147.00   1538.41   1538.41    962.00   2263.07    956.42   2491.35
148   148.00   1548.53   1548.53    968.33   2277.96    962.71   2507.74
149   149.00   1558.65   1558.65    974.66   2292.85    969.00   2524.13
150   150.00   1568.77   1568.77    980.99   2307.74    975.29   2540.52
151   151.00   1578.89   1578.89    987.32   2322.63    981.58   2556.91
152   152.00   1589.01   1589.01    993.65   2337.52    987.87   2573.30
153   153.00   1599.13   1599.13    999.98   2352.41    994.16   2589.69
154   154.00   1609.25   1609.25   1006.31   2367.30   1000.45   2606.08
155   155.00   1619.37   1619.37   1012.64   2382.19   1006.74   2622.47
156   156.00   1629.49   1629.49   1018.97   2397.08   1013.03   2638.86
157   157.00   1639.61   1639.61   1025.30   2411.97   1019.32   2655.25
158   158.00   1649.73   1649.73   1031.63   2426.86   1025.61   2671.64
159   159.00   1659.85   1659.85   1037.96   2441.75   1031.90   2688.03
160   160.00   1669.97   1669.97   1044.29   2456.64   1038.19   2704.42
161   161.00   1680.09   1680.09   1050.62   2471.53   1044.48   2720.81
162   162.00   1690.21   1690.21   1056.95   2486.42   1050.77   2737.20
163   163.00   1700.33   1700.33   1063.28   2501.31   1057.06   2753.59
164   164.00   1710.45   1710.45   1069.61   2516.20   1063.35   2769.98
165   165.00   1720.57   1720.57   1075.94   2531.09   1069.64   2786.37
166   166.00   1730.69   1730.69   1082.27   2545.98   1075.93   2802.76
167   167.00   1740.81   1740.81   1088.60   2560.87   1082.22   2819.15
168   168.00   1750.93   1750.93   1094.93   2575.76   1088.51   2835.54
169   169.00   1761.05   1761.05   1101.26   2590.65   1094.80   2851.93
170   170.00   1771.17   1771.17   1107.59   2605.54   1101.09   2868.32
171   171.00   1781.29   1781.29   1113.92   2620.43   1107.38   2884.71
172   172.00   1791.41   1791.41   1120.25   2635.32   1113.67   2901.10
173   173.00   1801.53   1801.53   1126.58   2650.21   1119.96   2917.49
174   174.00   1811.65   1811.65   1132.91   2665.10   1126.25   2933.88
175   175.00   1821.77   1821.77   1139.24   2679.99   1132.54   2950.27
176   176.00   1831.89   1831.89   1145.57   2694.88   1138.83   2966.66
177   177.00   1842.01   1842.01   1151.90   2709.77   1145.12   2983.05
178   178.00   1852.13   1852.13   1158.23   2724.66   1151.41   2999.44
179   179.00   1862.25   1862.25   1164.56   2739.55   1157.70   3015.83
180   180.00   1872.37   1872.37   1170.89   2754.44   1163.99   3032.22
181   181.00   1882.49   1882.49   1177.22   2769.33   1170.28   3048.61
182   182.00   1892.61   1892.61   1183.55   2784.22   1176.57   3065.00
183   183.00   1902.73   1902.73   1189.88   2799.11   1182.86   3081.39
184   184.00   1912.85   1912.85   1196.21   2814.00   1189.15   3097.78
185   185.00   1922.97   1922.97   1202.54   2828.89   1195.44   3114.17
186   186.00   1933.09   1933.09   1208.87   2843.78   1201.73   3130.56
187   187.00   1943.21   1943.21   1215.20   2858.67   1208.02   3146.95
188   188.00   1953.33   1953.33   1221.53   2873.56   1214.31   3163.34
189   189.00   1963.45   1963.45   1227.86   2888.45   1220.60   3179.73
190   190.00   1973.57   1973.57   1234.19   2903.34   1226.89   3196.12
191   191.00   1983.69   1983.69   1240.52   2918.23   1233.18   3212.51
192   192.00   1993.81   1993.81   1246.85   2933.12   1239.47   3228.90
193   193.00   2003.93   2003.93   1253.18   2948.01   1245.76   3245.29
194   194.00   2014.05   2014.05   1259.51   2962.90   1252.05   3261.68
195   195.00   2024.17   2024.17   1265.84   2977.79   1258.34   3278.07
196   196.00   2034.29   2034.29   1272.17   2992.68   1264.63   3294.46
197   197.00   2044.41   2044.41   1278.50   3007.57   1270.92   3310.85
198   198.00   2054.53   2054.53   1284.83   3022.46   1277.21   3327.24
199   199.00   2064.65   2064.65   1291.16   3037.35   1283.50   3343.63
200   200.00   2074.77   2074.77   1297.49   3052.24   1289.79   3360.02
201   201.00   2084.89   2084.89   1303.82   3067.13   1296.08   3376.41
202   202.00   2095.01   2095.01   1310.15   3082.02   1302.37   3392.80
203   203.00   2105.13   2105.13   1316.48   3096.91   1308.66   3409.19
204   204.00   2115.25   2115.25   1322.81   3111.80   1314.95   3425.58
205   205.00   2125.37   2125.37   1329.14   3126.69   1321.24   3441.97
206   206.00   2135.49   2135.49   1335.47   3141.58   1327.53   3458.36
207   207.00   2145.61   2145.61   1341.80   3156.47   1333.82   3474.75
208   208.00   2155.73   2155.73   1348.13   3171.36   1340.11   3491.14
209   209.00   2165.85   2165.85   1354.46   3186.25   1346.40   3507.53
210   210.00   2175.97   2175.97   1360.79   3201.14   1352.69   3523.92
211   211.00   2186.09   2186.09   1367.12   3216.03   1358.98   3540.31
212   212.00   2196.21   2196.21   1373.45   3230.92   1365.27   3556.70
213   213.00   2206.33   2206.33   1379.78   3245.81   1371.56   3573.09
214   214.00   2216.45   2216.45   1386.11   3260.70   1377.85   3589.48
215   215.00   2226.57   2226.57   1392.44   3275.59   1384.14   3605.87
216   216.00   2236.69   2236.69   1398.77   3290.48   1390.43   3622.26
217   217.00   2246.81   2246.81   1405.10   3305.37   1396.72   3638.65
218   218.00   2256.93   2256.93   1411.43   3320.26   1403.01   3655.04
219   219.00   2267.05   2267.05   1417.76   3335.15   1409.30   3671.43
220   220.00   2277.17   2277.17   1424.09   3350.04   1415.59   3687.82
221   221.00   2287.29   2287.29   1430.42   3364.93   1421.88   3704.21
222   222.00   2297.41   2297.41   1436.75   3379.82   1428.17   3720.60
223   223.00   2307.53   2307.53   1443.08   3394.71   1434.46   3736.99
224   224.00   2317.65   2317.65   1449.41   3409.60   1440.75   3753.38
225   225.00   2327.77   2327.77   1455.74   3424.49   1447.04   3769.77
226   226.00   2337.89   2337.89   1462.07   3439.38   1453.33   3786.16
227   227.00   2348.01   2348.01   1468.40   3454.27   1459.62   3802.55
228   228.00   2358.13   2358.13   1474.73   3469.16   1465.91   3818.94
229   229.00   2368.25   2368.25   1481.06   3484.05   1472.20   3835.33
230   230.00   2378.37   2378.37   1487.39   3498.94   1478.49   3851.72
231   231.00   2388.49   2388.49   1493.72   3513.83   1484.78   3868.11
232   232.00   2398.61   2398.61   1500.05   3528.72   1491.07   3884.50
233   233.00   2408.73   2408.73   1506.38   3543.61   1497.36   3900.89
234   234.00   2418.85   2418.85   1512.71   3558.50   1503.65   3917.28
235   235.00   2428.97   2428.97   1519.04   3573.39   1509.94   3933.67
236   236.00   2439.09   2439.09   1525.37   3588.28   1516.23   3950.06
237   237.00   2449.21   2449.21   1531.70   3603.17   1522.52   3966.45
238   238.00   2459.33   2459.33   1538.03   3618.06   1528.81   3982.84
239   239.00   2469.45   2469.45   1544.36   3632.95   1535.10   3999.23
240   240.00   2479.57   2479.57   1550.69   3647.84   1541.39   4015.62
241   241.00   2489.69   2489.69   1557.02   3662.73   1547.68   4032.01
242   242.00   2499.81   2499.81   1563.35   3677.62   1553.97   4048.40
243   243.00   2509.93   2509.93   1569.68   3692.51   1560.26   4064.79
244   244.00   2520.05   2520.05   1576.01   3707.40   1566.55   4081.18
245   245.00   2530.17   2530.17   1582.34   3722.29   1572.84   4097.57
246   246.00   2540.29   2540.29   1588.67   3737.18   1579.13   4113.96
247   247.00   2550.41   2550.41   1595.00   3752.07   1585.42   4130.35
248   248.00   2560.53   2560.53   1601.33   3766.96   1591.71   4146.74
249   249.00   2570.65   2570.65   1607.66   3781.85   1598.00   4163.13
250   250.00   2580.77   2580.77   1613.99   3796.74   1604.29   4179.52
251   251.00   2590.89   2590.89   1620.32   3811.63   1610.58   4195.91
252   252.00   2601.01   2601.01   1626.65   3826.52   1616.87   4212.30
253   253.00   2611.13   2611.13   1632.98   3841.41   1623.16   4228.69
254   254.00   2621.25   2621.25   1639.31   3856.30   1629.45   4245.08
255   255.00   2631.37   2631.37   1645.64   3871.19   1635.74   4261.47
256   256.00   2641.49   2641.49   1651.97   3886.08   1642.03   4277.86
257   257.00   2651.61   2651.61   1658.30   3900.97   1648.32   4294.25
258   258.00   2661.73   2661.73   1664.63   3915.86   1654.61   4310.64
259   259.00   2671.85   2671.85   1670.96   3930.75   1660.90   4327.03
260   260.00   2681.97   2681.97   1677.29   3945.64   1667.19   4343.42
261   261.00   2692.09   2692.09   1683.62   3960.53   1673.48   4359.81
262   262.00   2702.21   2702.21   1689.95   3975.42   1679.77   4376.20
263   263.00   2712.33   2712.33   1696.28   3990.31   1686.06   4392.59
264   264.00   2722.45   2722.45   1702.61   4005.20   1692.35   4408.98
265   265.00   2732.57   2732.57   1708.94   4020.09   1698.64   4425.37
266   266.00   2742.69   2742.69   1715.27   4034.98   1704.93   4441.76
267   267.00   2752.81   2752.81   1721.60   4049.87   1711.22   4458.15
268   268.00   2762.93   2762.93   1727.93   4064.76   1717.51   4474.54
269   269.00   2773.05   2773.05   1734.26   4079.65   1723.80   4490.93
270   270.00   2783.17   2783.17   1740.59   4094.54   1730.09   4507.32
271   271.00   2793.29   2793.29   1746.92   4109.43   1736.38   4523.71
272   272.00   2803.41   2803.41   1753.25   4124.32   1742.67   4540.10
273   273.00   2813.53   2813.53   1759.58   4139.21   1748.96   4556.49
274   274.00   2823.65   2823.65   1765.91   4154.10   1755.25   4572.88
275   275.00   2833.77   2833.77   1772.24   4168.99   1761.54   4589.27
276   276.00   2843.89   2843.89   1778.57   4183.88   1767.83   4605.66
277   277.00   2854.01   2854.01   1784.90   4198.77   1774.12   4622.05
278   278.00   2864.13   2864.13   1791.23   4213.66   1780.41   4638.44
279   279.00   2874.25   2874.25   1797.56   4228.55   1786.70   4654.83
280   280.00   2884.37   2884.37   1803.89   4243.44   1792.99   4671.22
281   281.00   2894.49   2894.49   1810.22   4258.33   1799.28   4687.61
282   282.00   2904.61   2904.61   1816.55   4273.22   1805.57   4704.00
283   283.00   2914.73   2914.73   1822.88   4288.11   1811.86   4720.39
284   284.00   2924.85   2924.85   1829.21   4303.00   1818.15   4736.78
285   285.00   2934.97   2934.97   1835.54   4317.89   1824.44   4753.17
286   286.00   2945.09   2945.09   1841.87   4332.78   1830.73   4769.56
287   287.00   2955.21   2955.21   1848.20   4347.67   1837.02   4785.95
288   288.00   2965.33   2965.33   1854.53   4362.56   1843.31   4802.34
289   289.00   2975.45   2975.45   1860.86   4377.45   1849.60   4818.73
290   290.00   2985.57   2985.57   1867.19   4392.34   1855.89   4835.12
291   291.00   2995.69   2995.69   1873.52   4407.23   1862.18   4851.51
292   292.00   3005.81   3005.81   1879.85   4422.12   1868.47   4867.90
293   293.00   3015.93   3015.93   1886.18   4437.01   1874.76   4884.29
294   294.00   3026.05   3026.05   1892.51   4451.90   1881.05   4900.68
295   295.00   3036.17   3036.17   1898.84   4466.79   1887.34   4917.07
296   296.00   3046.29   3046.29   1905.17   4481.68   1893.63   4933.46
297   297.00   3056.41   3056.41   1911.50   4496.57   1899.92   4949.85
298   298.00   3066.53   3066.53   1917.83   4511.46   1906.21   4966.24
299   299.00   3076.65   3076.65   1924.16   4526.35   1912.50   4982.63
300   300.00   3086.77   3086.77   1930.49   4541.24   1918.79   4999.02
301   301.00   3096.89   3096.89   1936.82   4556.13   1925.08   5015.41
302   302.00   3107.01   3107.01   1943.15   4571.02   1931.37   5031.80
303   303.00   3117.13   3117.13   1949.48   4585.91   1937.66   5048.19
304   304.00   3127.25   3127.25   1955.81   4600.80   1943.95   5064.58
305   305.00   3137.37   3137.37   1962.14   4615.69   1950.24   5080.97
306   306.00   3147.49   3147.49   1968.47   4630.58   1956.53   5097.36
307   307.00   3157.61   3157.61   1974.80   4645.47   1962.82   5113.75
308   308.00   3167.73   3167.73   1981.13   4660.36   1969.11   5130.14
309   309.00   3177.85   3177.85   1987.46   4675.25   1975.40   5146.53
310   310.00   3187.97   3187.97   1993.79   4690.14   1981.69   5162.92
311   311.00   3198.09   3198.09   2000.12   4705.03   1987.98   5179.31
312   312.00   3208.21   3208.21   2006.45   4719.92   1994.27   5195.70
313   313.00   3218.33   3218.33   2012.78   4734.81   2000.56   5212.09
314   314.00   3228.45   3228.45   2019.11   4749.70   2006.85   5228.48
315   315.00   3238.57   3238.57   2025.44   4764.59   2013.14   5244.87
316   316.00   3248.69   3248.69   2031.77   4779.48   2019.43   5261.26
317   317.00   3258.81   3258.81   2038.10   4794.37   2025.72   5277.65
318   318.00   3268.93   3268.93   2044.43   4809.26   2032.01   5294.04
319   319.00   3279.05   3279.05   2050.76   4824.15   2038.30   5310.43
320   320.00   3289.17   3289.17   2057.09   4839.04   2044.59   5326.82
321   321.00   3299.29   3299.29   2063.42   4853.93   2050.88   5343.21
322   322.00   3309.41   3309.41   2069.75   4868.82   2057.17   5359.60
323   323.00   3319.53   3319.53   2076.08   4883.71   2063.46   5375.99
324   324.00   3329.65   3329.65   2082.41   4898.60   2069.75   5392.38
325   325.00   3339.77   3339.77   2088.74   4913.49   2076.04   5408.77
326   326.00   3349.89   3349.89   2095.07   4928.38   2082.33   5425.16
327   327.00   3360.01   3360.01   2101.40   4943.27   2088.62   5441.55
328   328.00   3370.13   3370.13   2107.73   4958.16   2094.91   5457.94
329   329.00   3380.25   3380.25   2114.06   4973.05   2101.20   5474.33
330   330.00   3390.37   3390.37   2120.39   4987.94   2107.49   5490.72
331   331.00   3400.49   3400.49   2126.72   5002.83   2113.78   5507.11
332   332.00   3410.61   3410.61   2133.05   5017.72   2120.07   5523.50
333   333.00   3420.73   3420.73   2139.38   5032.61   2126.36   5539.89
334   334.00   3430.85   3430.85   2145.71   5047.50   2132.65   5556.28
335   335.00   3440.97   3440.97   2152.04   5062.39   2138.94   5572.67
336   336.00   3451.09   3451.09   2158.37   5077.28   2145.23   5589.06
337   337.00   3461.21   3461.21   2164.70   5092.17   2151.52   5605.45
338   338.00   3471.33   3471.33   2171.03   5107.06   2157.81   5621.84
339   339.00   3481.45   3481.45   2177.36   5121.95   2164.10   5638.23
340   340.00   3491.57   3491.57   2183.69   5136.84   2170.39   5654.62
341   341.00   3501.69   3501.69   2190.02   5151.73   2176.68   5671.01
342   342.00   3511.81   3511.81   2196.35   5166.62   2182.97   5687.40
343   343.00   3521.93   3521.93   2202.68   5181.51   2189.26   5703.79
344   344.00   3532.05   3532.05   2209.01   5196.40   2195.55   5720.18
345   345.00   3542.17   3542.17   2215.34   5211.29   2201.84   5736.57
346   346.00   3552.29   3552.29   2221.67   5226.18   2208.13   5752.96
347   347.00   3562.41   3562.41   2228.00   5241.07   2214.42   5769.35
348   348.00   3572.53   3572.53   2234.33   5255.96   2220.71   5785.74
349   349.00   3582.65   3582.65   2240.66   5270.85   2227.00   5802.13
350   350.00   3592.77   3592.77   2246.99   5285.74   2233.29   5818.52
351   351.00   3602.89   3602.89   2253.32   5300.63   2239.58   5834.91
352   352.00   3613.01   3613.01   2259.65   5315.52   2245.87   5851.30
353   353.00   3623.13   3623.13   2265.98   5330.41   2252.16   5867.69
354   354.00   3633.25   3633.25   2272.31   5345.30   2258.45   5884.08
355   355.00   3643.37   3643.37   2278.64   5360.19   2264.74   5900.47
356   356.00   3653.49   3653.49   2284.97   5375.08   2271.03   5916.86
357   357.00   3663.61   3663.61   2291.30   5389.97   2277.32   5933.25
358   358.00   3673.73   3673.73   2297.63   5404.86   2283.61   5949.64
359   359.00   3683.85   3683.85   2303.96   5419.75   2289.90   5966.03
360   360.00   3693.97   3693.97   2310.29   5434.64   2296.19   5982.42
361   361.00   3704.09   3704.09   2316.62   5449.53   2302.48   5998.81
362   362.00   3714.21   3714.21   2322.95   5464.42   2308.77   6015.20
363   363.00   3724.33   3724.33   2329.28   5479.31   2315.06   6031.59
364   364.00   3734.45   3734.45   2335.61   5494.20   2321.35   6047.98
365   365.00   3744.57   3744.57   2341.94   5509.09   2327.64   6064.37
366   366.00   3754.69   3754.69   2348.27   5523.98   2333.93   6080.76
367   367.00   3764.81   3764.81   2354.60   5538.87   2340.22   6097.15
368   368.00   3774.93   3774.93   2360.93   5553.76   2346.51   6113.54
369   369.00   3785.05   3785.05   2367.26   5568.65   2352.80   6129.93
370   370.00   3795.17   3795.17   2373.59   5583.54   2359.09   6146.32
371   371.00   3805.29   3805.29   2379.92   5598.43   2365.38   6162.71
372   372.00   3815.41   3815.41   2386.25   5613.32   2371.67   6179.10
373   373.00   3825.53   3825.53   2392.58   5628.21   2377.96   6195.49
374   374.00   3835.65   3835.65   2398.91   5643.10   2384.25   6211.88
375   375.00   3845.77   3845.77   2405.24   5657.99   2390.54   6228.27
376   376.00   3855.89   3855.89   2411.57   5672.88   2396.83   6244.66
377   377.00   3866.01   3866.01   2417.90   5687.77   2403.12   6261.05
378   378.00   3876.13   3876.13   2424.23   5702.66   2409.41   6277.44
379   379.00   3886.25   3886.25   2430.56   5717.55   2415.70   6293.83
380   380.00   3896.37   3896.37   2436.89   5732.44   2421.99   6310.22
381   381.00   3906.49   3906.49   2443.22   5747.33   2428.28   6326.61
382   382.00   3916.61   3916.61   2449.55   5762.22   2434.57   6343.00
383   383.00   3926.73   3926.73   2455.88   5777.11   2440.86   6359.39
384   384.00   3936.85   3936.85   2462.21   5792.00   2447.15   6375.78
385   385.00   3946.97   3946.97   2468.54   5806.89   2453.44   6392.17
386   386.00   3957.09   3957.09   2474.87   5821.78   2459.73   6408.56
387   387.00   3967.21   3967.21   2481.20   5836.67   2466.02   6424.95
388   388.00   3977.33   3977.33   2487.53   5851.56   2472.31   6441.34
389   389.00   3987.45   3987.45   2493.86   5866.45   2478.60   6457.73
390   390.00   3997.57   3997.57   2500.19   5881.34   2484.89   6474.12
391   391.00   4007.69   4007.69   2506.52   5896.23   2491.18   6490.51
392   392.00   4017.81   4017.81   2512.85   5911.12   2497.47   6506.90
393   393.00   4027.93   4027.93   2519.18   5926.01   2503.76   6523.29
394   394.00   4038.05   4038.05   2525.51   5940.90   2510.05   6539.68
395   395.00   4048.17   4048.17   2531.84   5955.79   2516.34   6556.07
396   396.00   4058.29   4058.29   2538.17   5970.68   2522.63   6572.46
397   397.00   4068.41   4068.41   2544.50   5985.57   2528.92   6588.85
398   398.00   4078.53   4078.53   2550.83   6000.46   2535.21   6605.24
399   399.00   4088.65   4088.65   2557.16   6015.35   2541.50   6621.63
400   400.00   4098.77   4098.77   2563.49   6030.24   2547.79   6638.02
401   401.00   4108.89   4108.89   2569.82   6045.13   2554.08   6654.41
402   402.00   4119.01   4119.01   2576.15   6060.02   2560.37   6670.80
403   403.00   4129.13   4129.13   2582.48   6074.91   2566.66   6687.19
404   404.00   4139.25   4139.25   2588.81   6089.80   2572.95   6703.58
405   405.00   4149.37   4149.37   2595.14   6104.69   2579.24   6719.97
406   406.00   4159.49   4159.49   2601.47   6119.58   2585.53   6736.36
407   407.00   4169.61   4169.61   2607.80   6134.47   2591.82   6752.75
408   408.00   4179.73   4179.73   2614.13   6149.36   2598.11   6769.14
409   409.00   4189.85   4189.85   2620.46   6164.25   2604.40   6785.53
410   410.00   4199.97   4199.97   2626.79   6179.14   2610.69   6801.92
411   411.00   4210.09   4210.09   2633.12   6194.03   2616.98   6818.31
412   412.00   4220.21   4220.21   2639.45   6208.92   2623.27   6834.70
413   413.00   4230.33   4230.33   2645.78   6223.81   2629.56   6851.09
414   414.00   4240.45   4240.45   2652.11   6238.70   2635.85   6867.48
415   415.00   4250.57   4250.57   2658.44   6253.59   2642.14   6883.87
416   416.00   4260.69   4260.69   2664.77   6268.48   2648.43   6900.26
417   417.00   4270.81   4270.81   2671.10   6283.37   2654.72   6916.65
418   418.00   4280.93   4280.93   2677.43   6298.26   2661.01   6933.04
419   419.00   4291.05   4291.05   2683.76   6313.15   2667.30   6949.43
420   420.00   4301.17   4301.17   2690.09   6328.04   2673.59   6965.82
421   421.00   4311.29   4311.29   2696.42   6342.93   2679.88   6982.21
422   422.00   4321.41   4321.41   2702.75   6357.82   2686.17   6998.60
423   423.00   4331.53   4331.53   2709.08   6372.71   2692.46   7014.99
424   424.00   4341.65   4341.65   2715.41   6387.60   2698.75   7031.38
425   425.00   4351.77   4351.77   2721.74   6402.49   2705.04   7047.77
426   426.00   4361.89   4361.89   2728.07   6417.38   2711.33   7064.16
427   427.00   4372.01   4372.01   2734.40   6432.27   2717.62   7080.55
428   428.00   4382.13   4382.13   2740.73   6447.16   2723.91   7096.94
429   429.00   4392.25   4392.25   2747.06   6462.05   2730.20   7113.33
430   430.00   4402.37   4402.37   2753.39   6476.94   2736.49   7129.72
431   431.00   4412.49   4412.49   2759.72   6491.83   2742.78   7146.11
432   432.00   4422.61   4422.61   2766.05   6506.72   2749.07   7162.50
433   433.00   4432.73   4432.73   2772.38   6521.61   2755.36   7178.89
434   434.00   4442.85   4442.85   2778.71   6536.50   2761.65   7195.28
435   435.00   4452.97   4452.97   2785.04   6551.39   2767.94   7211.67
436   436.00   4463.09   4463.09   2791.37   6566.28   2774.23   7228.06
437   437.00   4473.21   4473.21   2797.70   6581.17   2780.52   7244.45
438   438.00   4483.33   4483.33   2804.03   6596.06   2786.81   7260.84
439   439.00   4493.45   4493.45   2810.36   6610.95   2793.10   7277.23
440   440.00   4503.57   4503.57   2816.69   6625.84   2799.39   7293.62
441   441.00   4513.69   4513.69   2823.02   6640.73   2805.68   7310.01
442   442.00   4523.81   4523.81   2829.35   6655.62   2811.97   7326.40
443   443.00   4533.93   4533.93   2835.68   6670.51   2818.26   7342.79
444   444.00   4544.05   4544.05   2842.01   6685.40   2824.55   7359.18
445   445.00   4554.17   4554.17   2848.34   6700.29   2830.84   7375.57
446   446.00   4564.29   4564.29   2854.67   6715.18   2837.13   7391.96
447   447.00   4574.41   4574.41   2861.00   6730.07   2843.42   7408.35
448   448.00   4584.53   4584.53   2867.33   6744.96   2849.71   7424.74
449   449.00   4594.65   4594.65   2873.66   6759.85   2856.00   7441.13
450   450.00   4604.77   4604.77   2879.99   6774.74   2862.29   7457.52
451   451.00   4614.89   4614.89   2886.32   6789.63   2868.58   7473.91
452   452.00   4625.01   4625.01   2892.65   6804.52   2874.87   7490.30
453   453.00   4635.13   4635.13   2898.98   6819.41   2881.16   7506.69
454   454.00   4645.25   4645.25   2905.31   6834.30   2887.45   7523.08
455   455.00   4655.37   4655.37   2911.64   6849.19   2893.74   7539.47
456   456.00   4665.49   4665.49   2917.97   6864.08   2900.03   7555.86
457   457.00   4675.61   4675.61   2924.30   6878.97   2906.32   7572.25
458   458.00   4685.73   4685.73   2930.63   6893.86   2912.61   7588.64
459   459.00   4695.85   4695.85   2936.96   6908.75   2918.90   7605.03
460   460.00   4705.97   4705.97   2943.29   6923.64   2925.19   7621.42
461   461.00   4716.09   4716.09   2949.62   6938.53   2931.48   7637.81
462   462.00   4726.21   4726.21   2955.95   6953.42   2937.77   7654.20
463   463.00   4736.33   4736.33   2962.28   6968.31   2944.06   7670.59
464   464.00   4746.45   4746.45   2968.61   6983.20   2950.35   7686.98
465   465.00   4756.57   4756.57   2974.94   6998.09   2956.64   7703.37
466   466.00   4766.69   4766.69   2981.27   7012.98   2962.93   7719.76
467   467.00   4776.81   4776.81   2987.60   7027.87   2969.22   7736.15
468   468.00   4786.93   4786.93   2993.93   7042.76   2975.51   7752.54
469   469.00   4797.05   4797.05   3000.26   7057.65   2981.80   7768.93
470   470.00   4807.17   4807.17   3006.59   7072.54   2988.09   7785.32
471   471.00   4817.29   4817.29   3012.92   7087.43   2994.38   7801.71
472   472.00   4827.41   4827.41   3019.25   7102.32   3000.67   7818.10
473   473.00   4837.53   4837.53   3025.58   7117.21   3006.96   7834.49
474   474.00   4847.65   4847.65   3031.91   7132.10   3013.25   7850.88
475   475.00   4857.77   4857.77   3038.24   7146.99   3019.54   7867.27
476   476.00   4867.89   4867.89   3044.57   7161.88   3025.83   7883.66
477   477.00   4878.01   4878.01   3050.90   7176.77   3032.12   7900.05
478   478.00   4888.13   4888.13   3057.23   7191.66   3038.41   7916.44
479   479.00   4898.25   4898.25   3063.56   7206.55   3044.70   7932.83
480   480.00   4908.37   4908.37   3069.89   7221.44   3050.99   7949.22
481   481.00   4918.49   4918.49   3076.22   7236.33   3057.28   7965.61
482   482.00   4928.61   4928.61   3082.55   7251.22   3063.57   7982.00
483   483.00   4938.73   4938.73   3088.88   7266.11   3069.86   7998.39
484   484.00   4948.85   4948.85   3095.21   7281.00   3076.15   8014.78
485   485.00   4958.97   4958.97   3101.54   7295.89   3082.44   8031.17
486   486.00   4969.09   4969.09   3107.87   7310.78   3088.73   8047.56
487   487.00   4979.21   4979.21   3114.20   7325.67   3095.02   8063.95
488   488.00   4989.33   4989.33   3120.53   7340.56   3101.31   8080.34
489   489.00   4999.45   4999.45   3126.86   7355.45   3107.60   8096.73
490   490.00   5009.57   5009.57   3133.19   7370.34   3113.89   8113.12
491   491.00   5019.69   5019.69   3139.52   7385.23   3120.18   8129.51
492   492.00   5029.81   5029.81   3145.85   7400.12   3126.47   8145.90
493   493.00   5039.93   5039.93   3152.18   7415.01   3132.76   8162.29
494   494.00   5050.05   5050.05   3158.51   7429.90   3139.05   8178.68
495   495.00   5060.17   5060.17   3164.84   7444.79   3145.34   8195.07
496   496.00   5070.29   5070.29   3171.17   7459.68   3151.63   8211.46
497   497.00   5080.41   5080.41   3177.50   7474.57   3157.92   8227.85
498   498.00   5090.53   5090.53   3183.83   7489.46   3164.21   8244.24
499   499.00   5100.65   5100.65   3190.16   7504.35   3170.50   8260.63
500   500.00   5110.77   5110.77   3196.49   7519.24   3176.79   8277.02
501   501.00   5120.89   5120.89   3202.82   7534.13   3183.08   8293.41
502   502.00   5131.01   5131.01   3209.15   7549.02   3189.37   8309.80
503   503.00   5141.13   5141.13   3215.48   7563.91   3195.66   8326.19
504   504.00   5151.25   5151.25   3221.81   7578.80   3201.95   8342.58
505   505.00   5161.37   5161.37   3228.14   7593.69   3208.24   8358.97
506   506.00   5171.49   5171.49   3234.47   7608.58   3214.53   8375.36
507   507.00   5181.61   5181.61   3240.80   7623.47   3220.82   8391.75
508   508.00   5191.73   5191.73   3247.13   7638.36   3227.11   8408.14
509   509.00   5201.85   5201.85   3253.46   7653.25   3233.40   8424.53
510   510.00   5211.97   5211.97   3259.79   7668.14   3239.69   8440.92
511   511.00   5222.09   5222.09   3266.12   7683.03   3245.98   8457.31
512   512.00   5232.21   5232.21   3272.45   7697.92   3252.27   8473.70
513   513.00   5242.33   5242.33   3278.78   7712.81   3258.56   8490.09
514   514.00   5252.45   5252.45   3285.11   7727.70   3264.85   8506.48
515   515.00   5262.57   5262.57   3291.44   7742.59   3271.14   8522.87
                                         SPECIFICATION REPORT
                  The estimate for the work Const. of Ambedkar Bhavan at Hanumapalli of V.Kota
in Chittoor District vide G.O.Rt.No. 246 Social welafare (Budget & LA) Department dt: 15-06-2017
was administratively sanctioned for Rs. 111.00 lakhs. Hence, the estimate was prepared for Rs.
111.00 lakhs with the following specifications.
     1        VRCC M 20 grade design mix , using 20mm HBG machine crushed graded metal for Colum
              Beams, Roof Slabs
     2        Providing HYSD bars Fe 415 for all diameters more than 6mm for VRCC & RCC work
     3        P.C.C (1:3:6) prop: nominal mix for Bed Blocks and Hold Fasts
     4        RCC M 25 grade design mix , using 20mm HBG machine crushed graded metal for sun sha
              7.5cm thick at fixed end and 5.0 cm thick at free end, of any width as per approved plan
     5        PCC M20 grade Design Mix , using 20mm HBG machine crushed gradedmetal for steps
     6        Brick masonry in CM(1:8) prop. using 2nd class traditional bricks for Superstructure
     7        Reinforced Brick masonry 115mm thick in CM(1:4) prop. using 2nd class traditional bricks f
              Partition walls
     8        Plastering 12 mm thick in two coats, base coat 8mm thick in CM(1:6) and top coat 4mm th
              CM(1:4) for even face of walls
     9        Plastering 20 mm thick in two coats, base coat 16mm thick in CM(1:6) and top coat 4mm
              CM(1:4) for uneven face of walls
     10       Ornamental Plastering to ceiling, 12 mm thick in two coats with base coat of (1:5) 8mmth
              top coat cm (1:3) 4mm thick
     11       Providing impervious coat over RCC roof slab, in side of septic tank to required slopes with
              (1:3) prop. 20 mm thick (average) mixed with water proofing compound
     12       Flooring with Polished Kadapa Slabas 15 to 18 mm thick set over a base coat of CM (1:8),
              thick over already laid C.C. bed
     13       Providing Skirting to internal walls to 12.5 cm height with Polished Kadapa slabs of minimu
              mm thick
  14    Supply & fixing of T.W. doors of size 1.52 x 2.40 mtrs, 1.22 x 2.13m & 0.90 x 2.13m with
        thick flush door shutters
  15    Supply & fixing of M.S. doors of size 0.75 x 1.90 mtrs for toilets
  16  Supply & fixing of M.S. windows of size 1.50 x 1.35 mtrs, 1.20 x 1.35m & 0.90 x 1.35m
  17  Supply & fixing of M.S. grills, for ventilators in toilet block
  18  Whiting to new walls and ceiling in two coats with Birla white or equavalent quality for inte
      walls
  19  Painting with Plastic emulsion grade -1 paint to exterior faces of new walls with 3 coats of
      make shade and colour
  20  Painting two coats with synthetic enamel paint 1st grade to new iron work & wood work
AMENITIES:
  1)    Sub-Estimate is prepared for Water supply and Sanitary Arrangements as per the requirem
  2)    based on approved
        Sub-Estimate       plan. for Internal Electrification the requirements based on approved
                     is prepared
  3)    Sub-Estimate is prepared for Toilet block
  4)    Sub-Estimate is prepared for Septic tank
General Items :-
               The General Items like P.S. Charges @ 7%, GST @12%, Seignerage charges @
        charges @ 0.50%, NAC charges @ 0.1%, Provision for Tender publication charges, Pro
        power connection charges, Provision for price adjusement of Cement & Steel & Pro
        Unforseen Items are also provide in this estimate.
                 Thus the estimate is prepared duly adopting the rates of SSR 2016-17 and the
        be carried out as per the standard spectifications of APDSS.
st :111.00 Lakhs.
 ons
undations and as bed concrete for
ment.
des of foundations and for basement.
oilets
.20 x 1.35m & 0.90 x 1.35m
or Footings,
for basement.
or Columns, Roof
rk
r sun shades,
ed plan
 steps
 e
al bricks for
t 4mm thick in
at 4mm thick in
) 8mmthick and
opes with CM
M (1:8), 12mm
of minimum 15
3m with 35mm
1.35m
y for internal
coats of approved
d work
 requirements
approved plan.
utive Engineer
               GOVERNMENT OF ANDHRA PRADESH
                   Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415
                   grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting,
                   bending, to required sizes and shapes placing in position with cover
                   blocks of approved size and binding wire of 20SWG, forming grills
                   for reinforcement work as per approved designs and drawings
12    0.5          including cost and conveyance of bars from approved sources to site    50652.40          25,326
                   of work, including cost and conveyance of binding wire, cover blocks,
                   chairs, overlaps, spacers, dowels, wastage etc., and all operational,
                   incidental, and labour charges such as cutting, bending, placing in
                   position, tying etc., and sales & other taxes,on cost of all materials
                   complete for finished item of work (APSS No.126) in all floors.
             MT                                                                                       MT
                   Dadooing to walls with glazed red or white full body ceramic wall
                   tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6mm
                   1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to
                   15) of any colour and finish in all shades and designs and set over a
                   base coat of CM (1:5), 12mm thick and neat cement paste at the rate
13   15.00         of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with            533.30          8,000
                   pigment of matching shade including cost and conveyance of all
                   materials like cement, sand, water, tiles, etc. to site, seigniorage
                   charges, sales and other taxes on all materials, C921 such as mixing of
                   cement mortar, laying in position, curing, lift charges etc., complete
                   for finished item of work (APSS No.701 & 707) in All Floors
             Sqm                                                                                      Sqm
              Sqm                                                                                         Sqm
                    Flooring with Non-skid red or white full body Ceramic floor tiles of
                    size 300 x 300 mm and thickness between 7-8 mm 1st quality
                    conforming to IS:13711, IS:13712, IS:13630(Parts 1to15) of any
                    colour and finish in all shades and designs set over a base coat of CM
                    (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat
                    cement slurry of honey like consistency spread at the rate of 3.3 Kgs
14    3.00          of cement per Sq.m and jointed with neat white cement paste to full          915.95         2,748
                    depth mixed with pigment of matching shade including cost and
                    conveyance of all materials like cement, sand, water, ceramic tiles etc.
                    to site, seigniorage charges, sales and other taxes on all materials, all
                    operational, incidental and labour charges such as mixing of cement
                    mortar, laying, curing, lift charges etc., complete for finished item of
                    work.(APSS No.701 & 707) in All Floors
              Kgs   Supply and Fixing MS GILLS including Labour Charges for fixing                        Kgs
                    complete including cost and conveyance of all materials to site, sales
15   125.00                                                                                      72.27          9,034
                    and other taxes, all labour charges etc., complete for finished item of
                    work
              Sqm   Whiting to new walls and ceiling in two coats with White cement or                    Sqm
                    equavalent quality to give an even shade after thoroughly brushing the
                    surface to remove all loose powdered materials including cost and
16   10.00          conveyance of all materials and water to site, sales & other taxes, all      35.20           352
                    operational, incidental and labour charges such as cleaning the
                    surface, painting, curing etc., complete for finished item of work for
                    internal walls. (APSS No.901 & 908) in All Floors
              Sqm                                                                                         Sqm
                    Painting to New walls with two coats of acrylic emulsion paint
                    having VOC (Volatile Organic Compound) content less than 50
                    grams/liter of superior quality of approved brand and shade over base
                    coat of cement primer grade -I making three coats in all to give an
                    even shade after thoroughly brushing the surface to remove all loose
17   25.00          powdered materials, including cost and conveyance of all materials,          146.10         3,653
                    including cost and conveyance of all materials, cost of brushes, water
                    to site, etc., sales & other taxes, all operational, incidental and labour
                    charges such as scaffolding charges, lift charges, curing etc., complete
                    for finished item of work in all floors for Walls.(APSS No. 911) in All
                    Floors INTERNAL
              Sqm   Painting to New Iron work with two coats of ready mixed Synthetic                     Sqm
                    Enamel paints in all shades Grade - I having VOC (Volatile Organic
                    Compound ) content less than 50 grams/ liter over an existing steel
18   10.00          primer including cost and conveyance of all materials to site, sales &       94.95           950
                    other taxes, incidental, operational and all labour charges etc.,
                    complete for finished item of work. (APSS No. 1201, 1207 &
                    1212).in All Floors
              Rmt                                                                                         Rmt
                    Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4
                    Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special
                    such as plain bends, off sets, door bends, single junctions, double
19   15.00          junctions as per site requirement, fixing with PVC clamps if necessary       171.20         2,568
                    with required number of Bombay nails including cost and conveyance
                    of all materials to site, labour charges etc.complete for finished item
                    of work at all floor levels. (APSS No. 1302 1319 & 1326)
             Rmt      Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC                    Rmt
                      Pipes with fittings in ground or on wall including cost of tees,
                      elbows, bends, reducers, couplings, running joints, union flanges,
                      unions etc. with necessary excavation in all types of soils except rock
20   7.30                                                                                        309.30              2,258
                      requiring blasting, refilling, chiselling masonry walls and making
                      good the walls & floors to the original surface and fixing MS clamps
                      on TW blocks on walls including cost and conveyance of all materials
                      and labour charges complete for finished item of work.
             Nos                                                                                           Nos
                      Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed
                      Water Closet 1st qualityISI marked confirming to IS:2556-Part-3-
                      1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick
                      masonry seat, CC squatting plate and fixing 12.70mm dia NP Push
                      cock 1st quality , P trap or S trap of Indian W.C. shall be encased on
                      CC (1:2:4) 150mm alround well above the joint to stop leakage at the
21    2               joint etc., 10 Litres capacity Single Flush white PVC low level         3431.65                6,863
                      flushing system parryware, slimline with internal components and
                      short bend including cost and conveyance of all materials to site, all
                      labour charges, sales and other taxes on all materials etc., complete
                      for finished item of work for all floorscomplete including cost and
                      conveyance of all materials to site, cost of CC bed, labour charges and
                      seigniorage charges etc., complete for finished item of work.
             Nos      Supplying and fixing NP bib taps of size 12.70mm dia of Indian make                  Nos
                      Seiko or equivalent including cost and conveyance of all materials,
22    8                                                                                          403.15              3,225
                      labour charges etc., complete for finished item of work in all
                      floors.400 Grams
             Nos      Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6)                     Nos
                      prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted
                      with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and
23    4                                                                                          3695.00            14,780
                      cover of 20kg., including cost and convenyance of all materials to
                      site, all labour charges, sales and otehr taxes on all materials etc.,
                      complete for finished item of work
             Liters   Providing and placing on terrace (at all floor levels) polyetheylene                 Liters
                      water storage tank with double layer approved brand and manufacture
                      with cover and suitable locking arrangement and making necessary
24   5,000            holes for inlet and outlets and over flow pipes but without fittings and    5.95              29,750
                      base support for tanks including cost and conveyance of all materials
                      and labour charges for placing and fixing in position as directed by
                      Engineer-in-Charge.
                      Supply and run of 2 of 2.5 sq.mm (phase neutral and earth) FRLS /
                      HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990
                      specification flexible copper cable in existing MS conduit pipe for
                      individual ligting circuits including labour charges etc., complete as
26    30      Rmt                                                                                 54.65     Rmt      1,640
                      required for switch boards.
                      Makes of wires:- Finolex / RR kabel / Havells / APAR E-beam /
                      KEI / Polycab / Bonton / V-Guard / GM / Million / HPL / Goldmedal /
                      Finecab / Vimal / Fortune Art / Gloster / Kundan cab/Sudhakar
               Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR / ZHFR
               P.V.C. insulated 1100V grade as per IS : 694 / 1990 specification
               flexible copper cable (ISI MARK) in existing pipe with 6A Modular
               switch, Ceiling rose/BH/SBH Modular switches with cover plate
               including all labour charges etc., complete for Light, Fan, Exhaust Fan
               etc., complete. (for Residential Building)
               Makes of wires:- Finolex / RR kabel / Havells / APAR E-beam /
27   2   Job                                                                             462.75   Job      926
               KEI / Polycab / Bonton / V-Guard / GM / Million / HPL / Goldmedal /
               Finecab / Vimal / Fortune Art / Gloster / Kundan cab/Sudhakar
 1    2                                              3             4         5       6         7           8
      Toilet Blocks ( 3 Nos)
      Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in
      Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B)
      including all operational incidental labour charges such as shoring, strutting, sheeting,
 1
      planking and dewatering including cost of hire charges of T & P, labour charges etc.,
      complete for finished item of work including seignerage charges excluding dewatering
      charges etc., complete for Foundation of Building.(APSS No. 308)
      Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4)
      proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard
      Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry
 3    including cost and conveyance of all materials like cement, sand, coarse aggregate, water
      etc. to site, including seigniorage charges, sales & other taxes on all materials, all
      operational, incidental and labour charges such as mixing, laying, curing concrete, etc.,
      complete for finished item of work (APSS No. 402)
      Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted
      Granite stones from approved quarry including cost and conveyance of all materials like
      Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales &
 4
      other taxes on all materials, all operational, incidental, and labour charges such as cutting
      stones to required size and shape, mixing of cement mortar, constructing masonry, curing
      etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)
    Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size
    290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost
    and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site,
5
    including seigniorage charges, sales & other taxes on all materials, all operational, incidental
    and labour charges such as mixing cement mortar, constructing masonry, scaffolding
    charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
    Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size
    (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from
    approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete
    including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse
6   aggregate, water etc., to site and cost of seigniorage charges on all materials including
    centering using Cashewrina Ballies and Wooden runners & staging including all bracings,
    cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc.,
    complete but excluding cost of steel and it’s fabrication charges for finished item of work
    (APSS No. 402 & 403) For Lintels
    Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using 20mm
    size (SS 5) machine crushed hard blasted granite graded metal (coarse aggregate) from
    approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete
    including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse
    aggregate, water etc. to site and cost of seigniorage charges on all materials including
7
    centering using Cashewrina Ballies and Wooden runners & staging including all bracings,
    cross members etc., shuttering, machine mixing, laying concrete, 7.5cm thick at fixed end
     and 5cm thick at free end with an average thickness of 6.25cm including labour
    charges for mixing, laying, curing etc., complete but excluding cost of steel and its
    fabrication charges for finished item of work (APSS No. 402 & 403)
    Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm
    size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from
    approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete
    including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse
8   aggregate, water etc., to site and cost of seigniorage charges on all materials including
    centering using Cashewrina Ballies and Wooden runners & staging including all bracings,
    cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges,
    curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item
    of work (APSS No. 402 & 403) For 100 mm thick slabs
                                              Page 44 of 147
1    2                                               3            4         5        6         7         8
     Toilet Block                              1     x    1      6.46      2.21              14.28
     Septictank Slab                           1     x    1      2.70      2.40               6.48
     Water Sump Slab                           1     x    1      3.00      2.50              7.50
                                                                                   Total                28.26
                                                                                    Say                 28.50
                                                                                                        Sqm
     Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
     4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
     like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
9    materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
     charges, lift charges, including cutting of Grooves wherever necessary as directed by
     Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for
     finished item of work. (APSS 901,903 & 904)
     Internal
     Toilet Block Allround                     1     x    2      5.10               0.80      8.16
     Deduct Doors                            -0.50   x    2      0.75               0.80     -0.60
     Deduct Ventilators                      -0.50   x    2      0.60               0.45     -0.27
     Buffele Wall At Septic Tank               2     x    2      1.80               1.20      8.64      15.93
     External
     Toilet Block Allround                     1     x    1      8.20               2.30     18.86
     At Base Ment                              1     x    1      8.20               0.45     3.69
     Deduct Doors                            -0.50   x    2      0.75               2.10     -1.58
     Deduct Ventilators                      -0.50   x    2      0.60               0.45     -0.27
     Sunshade Top & Bottom                     1     x    2      2.50      0.60              3.00       23.71
                                                                                   Total                39.64
                                                                                   Say                  40.00
                                                                                                        Sqm
     Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm
     thick (average) mixed with water proofing compound manufactured by reputed
     manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab
     when it is green, finished smooth with a floating coat of neat cement and thread lining at
10   regular intervals of 45cmx45cm including cost and conveyance of all materials like cement,
     sand, water proofing compound, water etc., to site, seigniorage charges, sales & other
     taxes on all materials, all operational, incidental and labour charges such as mixing mortar,
     laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing,
     lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
     Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and
     top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all
     materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on
11   all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
     charges, lift charges, including cutting of Grooves wherever necessary as directed by
     Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for
     finished item of work. (APSS 901,903 & 904)
     Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-
     1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in
     position with cover blocks of approved size and binding wire of 20SWG, forming grills for
     reinforcement work as per approved designs and drawings including cost and conveyance
12   of bars from approved sources to site of work, including cost and conveyance of binding
     wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational,
     incidental, and labour charges such as cutting, bending, placing in position, tying etc., and
     sales & other taxes,on cost of all materials complete for finished item of work (APSS
     No.126) in all floors.
                                                                                  Total                0.361
                                                                                   Say                 0.500
                                                                                                        MT
     Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300
     mm / 245 mm x 325 mm and thickness 6mm 1st quality conforming to IS:13711, IS:13712,
     IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and set over a
     base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and
13   jointed with white cement paste mixed with pigment of matching shade including cost and
     conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges,
     sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in
     position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) in
     All Floors
     Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and
     thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630(Parts
     1to15) of any colour and finish in all shades and designs set over a base coat of CM (1:8),
     12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like
     consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white
14
     cement paste to full depth mixed with pigment of matching shade including cost and
     conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, seigniorage
     charges, sales and other taxes on all materials, all operational, incidental and labour
     charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for
     finished item of work.(APSS No.701 & 707) in All Floors
                                               Page 46 of 147
1    2                                                3            4         5        6         7         8
     Whiting to new walls and ceiling in two coats with White cement or equavalent quality to
     give an even shade after thoroughly brushing the surface to remove all loose powdered
     materials including cost and conveyance of all materials and water to site, sales & other
16
     taxes, all operational, incidental and labour charges such as cleaning the surface, painting,
     curing etc., complete for finished item of work for internal walls. (APSS No.901 & 908) in All
     Floors
     Internal
     Toilet Block Allround                      1     x    2      5.10              0.80       8.16
     Deduct Doors                             -0.50   x    2      0.75              0.80      -0.60
     Deduct Ventilators                       -0.50   x    2      0.60              0.45      -0.27
                                                                                    Total                7.29
                                                                                    Say                  10.00
                                                                                                         Sqm
     Painting to New walls with two coats of acrylic emulsion paint having VOC (Volatile Organic
     Compound) content less than 50 grams/liter of superior quality of approved brand and
     shade over base coat of cement primer grade -I making three coats in all to give an even
     shade after thoroughly brushing the surface to remove all loose powdered materials,
17
     including cost and conveyance of all materials, including cost and conveyance of all
     materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental
     and labour charges such as scaffolding charges, lift charges, curing etc., complete for
     finished item of work in all floors for Walls.(APSS No. 911) in All Floors INTERNAL
     External
     Toilet Block Allround                      1     x    1      8.20              2.30      18.86
     At Base Ment                               1     x    1      8.20              0.45       3.69
     Deduct Doors                             -0.50   x    2      0.75              2.10      -1.58
     Deduct Ventilators                       -0.50   x    2      0.60              0.45      -0.27
     Sunshade Top & Bottom                      1     x    2      2.50     0.60               3.00       23.71
                                                                                    Total                23.71
                                                                                    Say                  25.00
                                                                                                         Sqm
     Painting to New Iron work with two coats of ready mixed Synthetic Enamel paints in all
     shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/
18   liter over an existing steel primer including cost and conveyance of all materials to site,
     sales & other taxes, incidental, operational and all labour charges etc., complete for finished
     item of work. (APSS No. 1201, 1207 & 1212).in All Floors
     Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm.
     Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door
     bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if
19
     necessary with required number of Bombay nails including cost and conveyance of all
     materials to site, labour charges etc.complete for finished item of work at all floor levels.
     (APSS No. 1302 1319 & 1326)
     Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in
     ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints,
     union flanges, unions etc. with necessary excavation in all types of soils except rock
20
     requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to
     the original surface and fixing MS clamps on TW blocks on walls including cost and
     conveyance of all materials and labour charges complete for finished item of work.
                                                Page 47 of 147
1    2                                             3             4        5        6        7          8
     a) 41.30 Od Dia
     At Tank to Toilets                       1     x   1      7.30                        7.30
                                                                                 Total               7.30
                                                                                 Say                 7.30
                                                                                                     Rmt
     Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st
     qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware /
     Parryware / Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP
     Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4)
     150mm alround well above the joint to stop leakage at the joint etc., 10 Litres capacity
21
     Single Flush white PVC low level flushing system parryware, slimline with internal
     components and short bend including cost and conveyance of all materials to site, all labour
     charges, sales and other taxes on all materials etc., complete for finished item of work for
     all floorscomplete including cost and conveyance of all materials to site, cost of CC bed,
     labour charges and seigniorage charges etc., complete for finished item of work.
     Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection
     chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-
23   6") frame and cover of 20kg., including cost and convenyance of all materials to site, all
     labour charges, sales and otehr taxes on all materials etc., complete for finished item of
     work
     Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with
     double layer approved brand and manufacture with cover and suitable locking arrangement
24   and making necessary holes for inlet and outlets and over flow pipes but without fittings and
     base support for tanks including cost and conveyance of all materials and labour charges for
     placing and fixing in position as directed by Engineer-in-Charge.
                                                                                 Total               5,000
                                                                                 Say                 5,000
                                                                                                     Liters
     Supply and Fixing of 20 mm outer dia 2.10 mm thick Heavy grade with IS:9537 part 3 FRLS
     regid PVC pipe (ISI MARK) concealed in Roof Slabs with all required MS deep boxes and all
25
     accessories including and labour charges etc., complete.
     Makes:- VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline
     Dy EE & EE Sirs                          1     x   1       15                          15
     Ladies & Gents Toilets                   1     x   1       15                          15
                                                                                 Total                30
                                                                                 Say                  30
                                                                                                     Rmt
                                              Page 48 of 147
1    2                                                 3            4     5        6        7         8
     Supply and run of 2 of 2.5 sq.mm (phase neutral and earth) FRLS / HFFR / ZHFR P.V.C.
     insulated 1100V grade as per IS : 694 / 1990 specification flexible copper cable in existing
     MS conduit pipe for individual ligting circuits including labour charges etc., complete as
26   required for switch boards.
     Makes of wires:- Finolex / RR kabel / Havells / APAR E-beam / KEI / Polycab / Bonton / V-
     Guard / GM / Million / HPL / Goldmedal / Finecab / Vimal / Fortune Art / Gloster / Kundan
     cab/Sudhakar
     At Toilets                                1       x   1     30.00                      30
                                                                                 Total               30
                                                                                 Say                 30
                                                                                                     Rmt
     Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR / ZHFR P.V.C. insulated 1100V
     grade as per IS : 694 / 1990 specification flexible copper cable (ISI MARK) in existing pipe
     with 6A Modular switch, Ceiling rose/BH/SBH Modular switches with cover plate including
     all labour charges etc., complete for Light, Fan, Exhaust Fan etc., complete.            (for
     Residential Building)
     Makes of wires:- Finolex / RR kabel / Havells / APAR E-beam / KEI / Polycab / Bonton / V-
27
     Guard / GM / Million / HPL / Goldmedal / Finecab / Vimal / Fortune Art / Gloster / Kundan
     cab/Sudhakar
     Makes of switches:- Legrand Arteor / Schneider Zen celo/ Crabtree Murano/ GM-Zenova /
     Legrand Myrius / Cabtree Thames Platinum / GM- Zicono/ / Million / Logus / Gold Medal
     Curve / GIFA / CPL/ Panasonic Vision / Salzer S 90 Series.
     At Toilets                                1       x   2                                2
                                                                                 Total                2
                                                                                 Say                  2
                                                                                                     Nos
Total
                                               Page 49 of 147
   1    2                          3             4    5    6        7           8
Assistant Exe Engineer   Dy. Executive Engineer           Executive Engineer
Irrigation Section          Irrigation Sub Division       Irrigation Division
Madanapalle                 Madanapalle                     Madanapalle
                              Page 50 of 147
                                                  SUB ESTIMATE
Name of the work : Construction of Toilets to primisess of Water Resources Department Division Office at
                                    Madanapalli in Chittoor District
                         PROVIDING ELECTRIFICATION                                      Est. Cost 222803.00
1     Supply and fixing of 25mm outer dia 2.20 mm thick Heavy grade with IS:9537
      part 3 FRLS regid PVC pipe (ISI MARK) concealed in Roof Slabs with all required
      MS deep boxes and all accessories including and labour charges etc., complete.
                                         1   X    1     300.00                  300.00
                                                                                300.00 Rm            65.70    1 Rm     19710
2     Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR / ZHFR P.V.C.
      insulated 1100V grade as per IS : 694 / 1990 specification flexible copper cable
      (ISI MARK) in existing pipe with 6A Modular switch, Ceiling rose/BH/SBH
      Modular switches with cover plate including all labour charges etc., complete
      for Light, Fan, Exhaust Fan etc., complete. (for Non Residential Building)
                                         1   X    80                               80
                                                                                   80      point    490.70 1 point     39256
3     Supply and Fixing of 16A/6A, 2 in one socket with 16A switch control modular
      type with MS flush boxes with front cover plate including all labour charges
      etc., complete.
                                         1   X    15                               15
                                                                                  15       No       336.35 1 each       5045
4     Supply and run of 3 of 2.5 sq.mm (phase neutral and earth) FRLS / HFFR / ZHFR
      P.V.C. insulated 1100V grade as per IS : 694 / 1990 specification flexible copper
      cable in existing MS conduit pipe for individual ligting circuits including labour
      charges etc., complete as required for switch boards.
                                         1   X    1     450.00                  450.00
                                                                                450.00 Rm            82.10    1 Rm     36945
5     Supply, Transportaton, and fixing of 4-28W box type tube light fitting with
      28Watt electronic ballast with all accessories with 40Watt tube and operating
      voltage 90 to 350 Volts, power factor 0.98 and harmonics shall be as per IS
      specifications including all labour charges and conveyance of all materials etc
      complete with with flexible wire and connections
                                         1   X    40                             40.00
                                                                                 40.00 No          1097.45 1 each      43898
6     Supply and Fixing of batten holder/angle holder on existing block with 13W CFL
      lamp and all labour charges etc., complete. In lieu of ceiling rose.
                                         1   X    20                               20
                                                                                  20       No        89.00 1 each       1780
7     Supply of 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and,
      with double ball bearings, power input not more than 50W , air delivery more
      than 200 cubic meter/min but without Regulator.
                                         1   X    25                               25
                                                                                  25       No      1613.00 1 each      40325
                                                       Page 51 of 147
8    Supply of Modular type Electronic fan regulator hum free step type socket size
     in the existing switch board.
                                       1    X   25                               25
                                                                                25       No    343.00 1 each     8575
9    Labour charges for fixing of ceiling fan with regulator including transportation,
     3 core wire leads etc complete
                                       1    X   25                               25
                                                                                25       No    129.45 1 each     3236
10   Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG
     G.I bearer wire through PVC cleats with all accessories including labour charges
     etc., complete for service mains.
                                       1    X    1    60.00                    60.00
                                                                               60.00 Rm         50.05   1 Rm     3003
11   Providing independent earthing for Important equipment with 40mm dia 'B' class
     2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected
     with reducer providing G.I funnel with mesh enclosed in C.C.Chamber of 400m x
     400m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with
     salt and charcoal from the bottom of the pipe giving earth connection from
     electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and
     labour charges complete, as per IS specifications 732/1982 (Part II)
                                       1    X    2                               2
                                                                                 2       No   3741.10 1 each     7482
12   Supply and fixing 4way TPN, D.B with IP-43 Protection (Metal Door) suitable for
     3 phase ELCB /FP Isolator as incommer and 10kA SP MCBs as outing going
     including internal connection and labour charges for flush mounting etc.,
     complete.
     Mak
                                     1     X   2                               2
                                                                                 2       No   6774.00 1 each    13548
TOTAL 222803
                 0                                               0                              Site Engineer,
                 0                                               0                            APEWIDC,Kuppam
                                                     Page 52 of 147
                                            SUB ESTIMATE
2             15.00 Nos.   Constructing 457.2mm x 457.2mm (1'-6" x 1'-        1 Each    3695.00    55425
                           6") brick in CM (1:6) prop. Masonry
                           inspection chamber upto 914.4mm (3'-0") and
                           fitted with light weight 457.2mm x 457.2mm
                           (1'-6" x 1"-6") frame and cover of 20kg.,
                           including cost and convenyance of all
                           materials to site, all labour charges, sales and
                           otehr taxes on all materials etc., complete for
                           finished item of work
3              2.00 Nos.   Supplying and fixing 580 mm x 440 mm long          1 Each    3431.65     6863
                           Orissa pan white glazed Water Closet 1st
                           qualityISI marked confirming to IS:2556-Part-
                           3-1981 with "P" or "S" trap Hindware /
                           Parryware / Neycer with brick masonry seat,
                           CC squatting plate and fixing 12.70mm dia
                           NP Push cock 1st quality , P trap or S trap of
                           Indian W.C. shall be encased on CC (1:2:4)
                           150mm alround well above the joint to stop
                           leakage at the joint etc., 10 Litres capacity
                           Single Flush white PVC low level flushing
                           system parryware, slimline with internal
                           components and short bend including cost
                           and conveyance of all materials to site, all
                           labour charges, sales and other taxes on all
                           materials etc., complete for finished item of
                           work for all floorscomplete including cost and
                           conveyance of all materials to site, cost of CC
                           bed, labour charges and seigniorage charges
                           etc., complete for finished item of work.
                                             Page 53 of 147
    1              2                              3                             4             5      6
4                           Supplying & fixing Ashirvad/Astral flow
                            guard for equivalent CPVC Pipes with fittings
                            in ground or on wall including cost of tees,
                            elbows, bends, reducers, couplings, running
                            joints, union flanges, unions etc.       with
                            necessary excavation in all types of soils
                            except rock requiring blasting, refilling,
                            chiselling masonry walls and making good the
                            walls & floors to the original surface and
                            fixing MS clamps on TW blocks on walls
                            including cost and conveyance of all materials
                            and labour charges complete for finished item
                            of work.
5               4.00 Nos.   Supplying and fixing Gunmetal Gate ( GM           1 Each     2463.65      9855
                            peet ) valve as per IS-778 Class - I , Indian
                            make heavy type including cost and
                            conveyance of all materials , labour charges
                            etc. complete for finished item of work. for
                            40mm Nominal bore
6              10.00 Nos.   Supplying and fixing NP bib taps of size          1 Each     403.15       4032
                            12.70mm dia of Indian make Seiko or
                            equivalent including cost and conveyance of
                            all materials, labour charges etc., complete
                            for finished item of work in all floors.400
                            grams
7            4000.00 Ltrs   Providing and placing on terrace (at all floor    1 Ltrs         5.95    23800
                            levels)polyetheylene water storage tank with
                            double     layer    approved    brand     and
                            manufacture with cover and suitable locking
                            arrangement and making necessary holes for
                            inlet and outlets and over flow pipes but
                            without fittings and base support for tanks
TOTAL 159845
                                              Page 54 of 147
                                                  SUB ESTIMATE
Name of the work : Construction of Toilets to primisess of Water Resources Department
                   Division Office at Madanapalli in Chittoor District
                                                TOILET BLOCK
                                                       Measurements in Mts.
Sl. No            Description             Nos
                                                        L         B     D      Quantity     Rate    Unit    Amount
  1                    2                   3            4         5      6         7          8       9       10
  1      Earth work excavation and depositing on bank with initial lead of 10m and
         initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary
         Gravelly Soils ( SS 20-B) including all operational incidental labour charges
         such as shoring, strutting, sheeting, planking and dewatering including cost
         of hire charges of T & P, labour charges etc., complete for finished item of
         work including seignerage charges excluding dewatering charges etc.,
         complete for Foundation of Building.(APSS No. 308)
                                                     Page 55 of 147
1                2                  3           4         5       6         7          8       9      10
                                             Page 56 of 147
1                  2                 3           4         5       6         7          8       9      10
9    Providing impervious coat over RCC roof slab to required slopes with CM
     (1:3) prop. 20mm thick (average) mixed with water proofing compound
     manufactured by reputed manufacturers as approved by Engineer-in-charge
     at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth
     with a floating coat of neat cement and thread lining at regular intervals of
     45cmx45cm including cost and conveyance of all materials like cement,
     sand, water proofing compound, water etc., to site, seigniorage charges,
     sales & other taxes on all materials, all operational, incidental and labour
     charges such as mixing mortar, laying, rounding off at junctions of wall and
     slab, rendering smooth with thread lining, curing, lift charges,        etc.,
     complete for finished item of work (APSS No. 901 & 903).
     Lintels
     Front side                 1    x   2    16.00      0.23    0.15        1.10
     For Toilet doors           1    x   5    1.80       0.23    0.15        0.31
                                                                             1.41
                                                                             1.42     7974.70 1 Cum   11324
11   Reinforced Cement Concrete M20 mix using 20mm size (SS5) hard granite
     machine crushed graded metal (Coarse aggregate) from approved quarry,
     using a quantity of 350 kgs. of cement per 1 cum of concrete including cost
     and conveyance of all materials like cement, fine aggregate (Sand), coarse
     aggregate, water, etc., to site and cost of seigniorage charges and all
     operational , incidental and all other taxes on all materials and all labour
     charges for steel centering, shuttering, and scafolding with props and steel
     plate as per the approved shuttering plan and other accessories as per the
     norms and stability calculations , using cashewrina Ballies and wooden
     runners & staging including all bracings, cross members etc.,machine
     mixing, laying concrete, lift charges, curing, etc., complete but excluding
     cost of steel and it’s fabrication charges for finished item of work (APSS No.
     402 & 403) for Sun Shades of 0.60mts wide 75mm thick at fixed end and
     50mm thick at free end
                                              Page 57 of 147
1                 2                    3          4         5       6         7          8       9      10
15   Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x
     300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711,
     IS:13712, IS:13630(Parts 1to15) of any colour and finish in all shades and
     designs set over a base coat of CM (1:8), 12mm thick laid over flooring bed /
     V.R.C.C. slab, with neat cement slurry of honey like consistency spread at
     the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement
     paste to full depth mixed with pigment of matching shade including cost
     and conveyance of all materials like cement, sand, water, ceramic tiles etc. to
     site, seigniorage charges, sales and other taxes on all materials, all
     operational, incidental and labour charges such as mixing of cement mortar,
     laying, curing, lift charges etc., complete for finished item of work.(APSS
     No.701 & 707) in All Floors
                                               Page 58 of 147
1                   2                  3          4         5     6         7          8        9      10
17   Painting to New walls with two coats of acrylic emulsion paint having VOC
     (Volatile Organic Compound) content less than 50 grams/liter of superior
     quality of approved brand and shade over base coat of cement primer grade
     -I making three coats in all to give an even shade after thoroughly brushing
     the surface to remove all loose powdered materials, including cost and
     conveyance of all materials, including cost and conveyance of all materials,
     cost of brushes, water to site, etc., sales & other taxes, all operational,
     incidental and labour charges such as scaffolding charges, lift charges,
     curing etc., complete for finished item of work in all floors for Walls.(APSS
     No. 911) in All Floors INTERNAL
18   Painting to New walls with two coats of acrylic emulsion paint weather proof
     waterbased, modified acrylic with silicon additives exterior grade having VOC
     (Volatile Organic Compound ) content less than 50 grams/ liter of superior
     quality of approved brand and shade over base coat of cement primer grade
     -I making three coats in all to give an even shade after thoroughly brushing
     the surface to remove all loose powdered materials, including cost and
     conveyance of all materials, including cost and conveyance of all materials,
     cost of brushes, water to site, etc., sales & other taxes, all operational,
     incidental and labour charges such as scaffolding charges, lift charges,
     curing etc., complete for finished item of work in all floors for Walls.(APSS
     No. 911) in All Floors EXTERNAL
                                               Page 59 of 147
1                 2                   3          4         5       6         7           8        9      10
20   Providing and fixing 30mm thick Solid panel PVC door shutter consisting of
     frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x
     19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall
     have a coat of steel primers of approved make and manufacture. M.S. frame
     shall be covered with 5mm thick heat moulded PVC ‘C’ channel of size 30 x
     50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail,
     lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm
     wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of
     10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the
     stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side,
     and joined together with solvent cement adhesive etc. An additional 5mm
     thick PVC strip of 20mm width is to be stuck on the interior side of the ‘C’
     Channel using PVC solvent adhesive. Complete as per direction of Engineer-
     in-charge, manufacturer’s specification & drawing for finished item of work .
21   Supply and fixing of MS Grills for doors, windows, Ventilators etc., including
     cost of conveyance of all materials and all labour charges etc., completed
22   Painting to New Iron work with two coats of ready mixed Synthetic Enamel
     paints in all shades Grade - I having VOC (Volatile Organic Compound )
     content less than 50 grams/ liter over an existing steel primer including cost
     and conveyance of all materials to site, sales & other taxes, incidental,
     operational and all labour charges etc., complete for finished item of work.
     (APSS No. 1201, 1207 & 1212).in All Floors
23   Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as
     per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required
     sizes and shapes placing in position with cover blocks of approved size and
     binding wire of 20SWG, forming grills for reinforcement work as per
     approved designs and drawings including cost and conveyance of bars from
     approved sources to site of work, including cost and conveyance of binding
     wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all
     operational, incidental, and labour charges such as cutting, bending, placing
     in position, tying etc., and sales & other taxes,on cost of all materials
     complete for finished item of work (APSS No.126) in all floors.
24   Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes
     with fittings in ground or on wall including cost of tees, elbows, bends,
     reducers, couplings, running joints, union flanges, unions etc.          with
     necessary excavation in all types of soils except rock requiring blasting,
     refilling, chiselling masonry walls and making good the walls & floors to the
     original surface and fixing MS clamps on TW blocks on walls including cost
     and conveyance of all materials and labour charges complete for finished
     item of work.
                                              Page 60 of 147
1                2                   3           4         5      6         7          8        9     10
26   Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water
     Closet 1st qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or
     "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC
     squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or
     S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well
     above the joint to stop leakage at the joint etc., 10 Litres capacity Single
     Flush white PVC low level flushing system parryware, slimline with internal
     components and short bend including cost and conveyance of all materials
     to site, all labour charges, sales and other taxes on all materials etc.,
     complete for finished item of work for all floorscomplete including cost and
     conveyance of all materials to site, cost of CC bed, labour charges and
     seigniorage charges etc., complete for finished item of work.
27   Supply & fixing of tested NP bib taps at all levels of 12.70 of Indian make
     first quality ( N.P bib tap indian make heavy duty ) including cost &
     conveyance of all materials, labour charges for finished item of work
     complete for all floors. 400 grms
28   Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy
     type including cost and conveyance of all materials , labour charges etc.
     complete for finished item of work.
     25.4 mm Dia                1    x   2      ---       ---     ---     2.00        235.20 1 Nos    470
29   Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm.
     Prince/sudhakar or any ISI brand and fixing all special such as plain bends,
     off sets, door bends, single junctions, double junctions as per site
     requirement, fixing with PVC clamps if necessary with required number of
     Bombay nails including cost and conveyance of all materials to site, labour
     charges etc.complete for finished item of work at all floor levels. (APSS No.
     1302 1319 & 1326)
     110mm Dia
                                1    x   1    55.00       ---     ---   55.00
                                                                        55.00         171.20 1 Rmt   9416
30   Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK)
     concealed in wall with all required accessories including masonary work for
     light, fan and separate plug point with well seasoned TW box including all
     labour charges etc., complete. Make :
                                              Page 61 of 147
1                    2                3             4              5   6       7             8          9         10
31   Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of
     light point complete with all connections and all labour charges with 5.0W
     LED Lamp with input voltage 90 to 300V, Colour temparature 3000k -
     6500k, Beam angle 170 - 220 degrees, B22 base, 350 Lumens. Makes:
     Phillips / Crompton / Bajaj / Havells / Halonix / VIN / Jaquor / Renesola
     (for new installation).
     Makes : Gold Medal /Million / Vimal
                                 1    x    20                  ---     ---20.00
                                                                          20.00            393.55 Nos           7871
33   Supply and run of 2 of 2.5 sq.mm FR PVC insulated flexible copper cable
     and one run of 1.0 sq.mm flexible copper wire for earthing in existing PVC/
     MS conduit pipe for circuit mains including labour charges (phase neutral
     and earth) etc., complete as requirement
                                                Page 62 of 147
                                                  SEPTIC TANK SUB ESTIMATE
Name of the work : Construction of Toilets to primisess of Water Resources Department Division Office at
                                     Madanapalli in Chittoor District
Sl.                                                Measurements                                                        Per    Amount
      Description of item                                                              QTY        Unit    Rate
No.                                   Nos.            L           B            D                                       Unit
 1                  2                     3           4           5            6              7                    8              9
 1    Earth work excavation and depositing on bank (Manual means) with initial lead
      of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth &
      Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour
      charges such as
                                                            Page 63 of 147
1                 2                    3        4            5            6              7                    8              9
                                                                                  2.19
                                                                        Or say    2.50       Sqm   3992.10        1 Cum 9980.00
5   Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6)
    and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
    conveyance of all materials like cement, sand, water etc., to site, seigniorage
    charges, sales & other taxes on all materials, all operational, incidental and
    labour charges such as mixing mortar,scaffolding charges, lift charges,
    finishing,including cutting of Grooves wherever necessary as directed by
    Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall
    for finished item of work. (APSS 901,903 & 904)
                                                                                  0.75
                                                                        Or say    1.00       MT    50652.40       1 MT   50652.00
    TOTAL >>>                                                                                                            298082.00
                                                       Page 64 of 147
1            2           3      4         5          6   7        8             9
                                    Page 65 of 147
                                                                                                                      LEAD CHART
Name of the work : Construction of Toilets to primisess of Water Resources Department Division Office at Madanapalli in Chittoor District
RATES AS PER COMMON SSR OF 2017-18 with cement and steel rates of 26-02-17
                                                                                         Lead in KM
                                                                                                                                                   Initial Cost  Add                                      Area
                                                                                                                                                    including Differenc                                allowence
                                                         Avg.                                                             contractore                                       1%
Sl.                                                                Source of                                  Convence                               Stacking     in                Loading unloading on loading
               Description                 SSR Sl.No. Thickness                                                              profit                                       towards                                      Total      Unit per
No.                                                                 Material                                  Charges                       net      Charges Seignio-               charges charges & unloading
                                                        in mm                     MR        CT        Total                &13.615%                                       storage
                                                                                                                                        conveyance wherever     rage                                  charges @
                                                                                                                                                   necesssary Charges                                      0%
(1)                 (2)                       (3)        (4)          (5)         (6)       (7)        (8)      (9)                                    (10)      (11)      (12)      (13)     (14)       (15)           (16)           (17)
                                                                  Bahuda River
1     Sand for Cocrete                       M-005                               30.00        0.00    30.00      356.70        42.74        313.96      95.00     0.00       0.00     0.00      0.00        0.00        451.70     Cum.
                                                                     Mahal
                                                                  Bahuda River
2     Sand for Mortor & Plasterings          M-005                               30.00        0.00    30.00      356.70        42.74        313.96     170.00     0.00       0.00     0.00      0.00        0.00        526.70     Cum.
                                                                     Mahal
3 Sand for filling& blindage M-004 Local 5.00 0.00 5.00 77.60 9.30 68.30 95.00 0.00 0.00 0.00 0.00 0.00 172.60 Cum.
4 Gravel M-008 Local 5.00 0.00 5.00 77.60 9.30 68.30 110.00 0.00 0.00 0.00 0.00 0.00 187.60 Cum.
       LEAD                                                                                                                                                                                                                       66
                                                                                          Lead in KM
                                                                                                                                                         Initial Cost  Add                                      Area
                                                                                                                                                          including Differenc                                allowence
                                                     Avg.                                                                      contractore                                        1%
Sl.                                                               Source of                                     Convence                                   Stacking     in                Loading unloading on loading
               Description             SSR Sl.No. Thickness                                                                       profit                                        towards                                   Total     Unit per
No.                                                                Material                                     Charges                           net      Charges Seignio-               charges charges & unloading
                                                    in mm                          MR        CT        Total                    &13.615%                                        storage
                                                                                                                                              conveyance wherever     rage                                  charges @
                                                                                                                                                         necesssary Charges                                      0%
21 Cement                              CSSR-A.05                    At Site       0.00                   0.00          0.00           0.00             0.00    3882.00   0.00      0.00     0.00     79.10      15.82     3976.92        M.T
   Mild Steel Bars (Fe 250) for
22                                       M-126                      At Site       0.00                   0.00          0.00           0.00             0.00   36000.00   0.00      0.00     0.00     94.81      18.96    36113.77        M.T
   6mm
   High Yield Strength Deformed
23 Bars (Fe 415) for 8mm to            CSSR-A.62                    At Site       0.00                   0.00          0.00           0.00             0.00   32100.00   0.00      0.00     0.00     94.81      18.96    32213.77        M.T
   40mm dia
25 M.S. Flats CSSR-A.69 At Site 0.00 0.00 0.00 0.00 0.00 36500.00 0.00 0.00 0.00 94.81 18.96 36613.77 M.T
26 M.S. Plates CSSR-A.69 At Site 0.00 0.00 0.00 0.00 0.00 40000.00 0.00 0.00 0.00 94.81 18.96 40113.77 M.T
      CERTIFICATES:-
  1 Certified that the above leads are true and correct to the best of my knowledge
  2 Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
  3 Certified that the 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing
  4 Certified that the work site does not falls within 12 Kms belt of any municipality/ Corporation Limits and hence no extra allowence is required
       LEAD                                                                                                                                                                                                                         67
                                                                       Lead in KM
                                                                                                                                Initial Cost  Add                                      Area
                                                                                                                                 including Differenc                                allowence
                                             Avg.                                                      contractore                                       1%
Sl.                                                   Source of                             Convence                              Stacking     in                Loading unloading on loading
             Description       SSR Sl.No. Thickness                                                       profit                                       towards                                   Total   Unit per
No.                                                    Material                             Charges                      net      Charges Seignio-               charges charges & unloading
                                            in mm                 MR      CT        Total               &13.615%                                       storage
                                                                                                                     conveyance wherever     rage                                  charges @
                                                                                                                                necesssary Charges                                      0%
      LEAD                                                                                                                                                                                               68
                                            DATA
Name of the work : Construction of Toilets to primisess of Water Resources Department
                   Division Office at Madanapalli in Chittoor District
             Overheads          13.615%
                                        Page 69 of 147
Page 70 of 147
          Rate per 1 cu.m.                                                                         Total     1232.60
                                            Hire charges of machinery
    SL.                                                                       fuel       crew
            Description of machinery          Units         Hire charges                            total
    No                                                                      charges     charges
     1    concrete     mixer300/200
                                              Hour               41.50       84.90      230.10     356.50
          (diesel)
     2    Batchingplant 0.5 cum               Hour               89.00       85.00      357.50     531.50
     3    needle vibrator 40 mm
                                              Hour               5.90        19.70      165.60     191.20
          (petrol)
     4                                                                                              0.00
Sl. No. Description Quantity Rate (Rs.) Per Unit Amount (Rs.)
1         Earth work excavation and depositing on bank with initial lead of 10m and initial lift
          of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils
          ( SS 20-B) including all operational incidental labour charges such as shoring,
          strutting, sheeting, planking and dewatering including cost of hire charges of T & P,
          labour charges etc., complete for finished item of work including seignerage charges
          excluding dewatering charges etc., complete for Foundation of Building.(APSS No.
          308)
          Light Mazdoor                       0.364                Nos      444.00          1.00 Day          161.62
          Add 75% for excavation of                1             cu.m.       0.00           1.00 cu.m.         0.00
          foundation of building
          add seigniorage charges                  1             cum         0.00           1.00 cum           0.00
          Add       Overheads        &
          Contractors            Profit      161.62              cu.m.      0.13615         1.00 cu.m.         22.00
          @13.615%
          Rate per 1 cu.m.                                                                         Total      183.65
2         Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to
          (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using
          40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including
          cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to
          site, including seigniorage charges, sales & other taxes on all materials, all
          operational, incidental, and labour charges such as mixing, laying and ramming
          concrete in layers in position not exceeding 15cm, finishing top surface, curing
          concrete, etc., complete for finished item of work for Foundations and Flooring Bed
          (APSS No. 402)
          Material
          Metal 40mm                        0.9             cu.m.          886.51           1.00 cu.m.      797.86
          Sand                              0.45            cu.m.          408.96           1.00 cu.m.      184.03
          Cement                            129.6           Kgs.           3976.92      1000.00 Kgs.        515.41
          Water                             1.2             KL             77.00            1.00 KL         92.40
          Machinery
          concrete     mixer300/200                1             Hour       356.50          1.00 Hour         356.50
          (diesel)
          LA oncrew charges                       20%                       230.10          1.00               46.02
          Labour
          1st class mason                         0.1            Nos.       558.00          1.00 Each          55.80
          Light Mazdoor                           1.39           Nos.       444.00          1.00 Each         617.16
          Add      Overheads           &     2665.18             cu.m.      0.13615         1.00 cu.m.        362.86
          Contractors              Profit
          Rate per Cu.m.                                                                           Total     3028.05
          @13.615%
Material
                                                         Page 71 of 147
Page 72 of 147
    Graded     Metal   20mm    to      0.9          cu.m.        0.00        1.00 cu.m.            0.00
    6mm
    Sand                              0.45          cu.m.      408.96        1.00 cu.m.           184.03
    Cement                            331.2          Kgs.      3976.92   1000.00 Kgs.            1317.16
    Water                              1.2           KL         77.00        1.00 KL               92.40
    Machinery
    concrete     mixer300/200            1          Hour       356.50        1.00 Hour            356.50
    (diesel)
    LA oncrew charges                 20%                      230.10        1.00                  46.02
    Labour
    1st class mason                    0.1          cu.m.      558.00        1.00 cu.m.            55.80
    men &women Mazdoor                1.39           Nos.      444.00        1.00 Each            617.16
    Basic rate per Cum.                                                              Total       2669.07
    Rate for other Floors                            GF          FF        SF          TF              4th
    Basic Rate of P.C.C(1:2:4)                     2669.07     2669.07   2669.07    2669.07      2669.07
    per Cum.
    Hire charges on centering                      277.00      277.00    277.00     277.00        277.00
    material
    Labour charges for centering                   473.00      520.30    567.60     614.90        662.20
    La on centering labour            20%           94.60      104.06    113.52     122.98        132.44
    charges
    Lift Charges per Cum.                            0.00       67.30    134.59     201.89        269.18
                                                   3513.67     3637.73   3761.78    3885.84      4009.89
    Add      Overheads          &    0.13615       478.39      495.28    512.17     529.06        545.95
    Contractors             Profit
    Rate per cu.m.                    Total       3992.10      4133.05   4273.95 4414.90         4555.85
    @13.615%
4   Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted
    Granite stones from approved quarry including cost and conveyance of all materials
    like Granite stones, cement, sand, water, etc., to site including seigniorage charges,
    sales & other taxes on all materials, all operational, incidental, and labour charges
    such as cutting stones to required size and shape, mixing of cement mortar,
    constructing masonry, curing etc., complete for finished item of work for foundation
    and basement (APSS No. 601 & 615)
    Material
    Graded     Metal   20mm    to 0.80          cu.m.         0.00           1.00 cu.m.         0.00
    6mm
                                             Page 73 of 147
  5th       6th
2669.07   2669.07
277.00    277.00
709.50    756.80
141.90    151.36
336.48    403.78
4133.95   4258.01
562.84    579.73
4696.80   4837.75
                    Page 74 of 147
         Sand                             0.40        cu.m.         408.96        1.00 cu.m.         163.58
         Cement                           350.00      kgs           3976.92    1000.00 kgs           1391.92
         Water                            1.20        KL            77.00         1.00 KL            92.40
         Machinery
         Batchingplant 0.5 cum            1.333       Hour          531.50        1.00 Hour          708.49
         needle vibrator 40        mm 1.333           Hour          191.20        1.00 Hour          254.87
         (petrol)
         LA on crew charges               20%                       697.29        1.00               139.46
         manpower
         1st Class Mason                  0.167       Nos.          558.00        1.00 Each          93.19
         2nd Class Mason                  0.167       Nos.          504.00        1.00 Each          84.17
         Man Mazdoor                      5.60        Nos.          444.00        1.00 Each          2486.40
         Basic rate per Cum.                                                             Total       5414.48
  5th      6th
5414.48   5414.48
 760.00   760.00
1429.50   1524.80
 285.90   304.96
1331.88   1598.25
9221.76   9602.49
1255.54   1307.38
10477.30 10909.90
                    Page 76 of 147
         needle vibrator 40        mm      0.308         Hour      191.20         1.00 Hour           58.89
         (petrol)
         LA on crew charges                20%                     161.11         1.00                32.22
         manpower
         1st Class Mason                   0.067          Nos.     558.00         1.00 Each           37.39
         2nd Class Mason                   0.133          Nos.     504.00         1.00 Each           67.03
         Man Mazdoor                       3.077          Nos.     444.00         1.00 Each          1366.19
         Basic rate per Cum.                                                              Total      3373.32
         Material
         Graded     Metal   20mm    to      0.8          cu.m.      0.00          1.00 cu.m.          0.00
         6mm
         Sand                               0.4          cu.m.     408.96         1.00 cu.m.         163.58
         Cement                            350            kgs      3976.92    1000.00 kgs            1391.92
         Water                              1.2           KL        77.00         1.00 KL             92.40
         Machinery
         Batchingplant 0.5 cum             1.333         Hour      531.50         1.00 Hour          708.49
         LA on crew charges                20%                     476.55         1.00                95.31
         manpower
         1st Class Mason                   0.167          Nos.     558.00         1.00 Each           93.19
         2nd Class Mason                   0.167          Nos.     504.00         1.00 Each           84.17
         Man Mazdoor                        5.6           Nos.     444.00         1.00 Each          2486.40
         Basic rate per Cum                                                                          5115.46
    a)   For Lintels
         Rate for other Floors                            GF         FF         SF          TF         4th
         Rate as worked out above                       5115.46    5115.46    5115.46    5115.46     5115.46
         per
         HireCum.
              charges on centering                      760.00     760.00     760.00     760.00      760.00
         material
         Labour charges for centering                   953.00     1048.30    1143.60    1238.90     1334.20
         La on centering labour            20%          190.60     209.66     228.72     247.78      266.84
         charges
         Lift charges @ 10% extra on                               266.38     532.75     799.13      1065.50
         each floor                                     7019.06    7399.80    7780.53    8161.27     8542.00
         Add      Overheads          &    0.13615       955.64     1007.48    1059.32    1111.16     1162.99
         Contractors
         Rate per Cum.           Profit    Total       7974.70     8407.30   8839.85 9272.45         9705.00
         @13.615%
                                                  Page 77 of 147
  5th      6th
 337.33   337.33
 152.00   152.00
 190.50   203.20
 38.10     40.64
 73.53     88.24
 791.46   821.41
 107.76   111.84
 899.25   933.30
  5th      6th
5115.46   5115.46
 760.00   760.00
1429.50   1524.80
 285.90   304.96
1331.88   1598.25
8922.74   9303.47
1214.83   1266.67
10137.60 10570.15
                    Page 78 of 147
8        Reinforced cement concrete with M 20 grade Design mix ( by weigh batching )
         using 20mm size (SS 5) machine crushed hard blasted granite graded metal (coarse
         aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per
         1 Cum of concrete including cost and conveyance of all materials like cement, fine
         aggregate (sand) ,coarse aggregate, water etc. to site and cost of seigniorage charges
         on all materials      including centering using Cashewrina Ballies and Wooden
         runners & staging including all bracings, cross members etc., shuttering, machine
         mixing, laying concrete, 7.5cm thick at fixed end and 5cm thick at free end with an
         average thickness of 6.25cm including labour charges for mixing, laying, curing
         etc., complete but excluding cost of steel and its fabrication charges for finished
         item of work (APSS No. 402 & 403)
         for sun-shades of any width as per approved plan / design and of average
         thickness of 62.50mm ( thickness at support 75mm and thickness at edge
         50mm) (APSS No. 402, 403)
         material
         Graded     Metal   20mm   to     0.8          cu.m.       0.00         1.00 cu.m.          0.00
         6mm
         Sand                             0.4          cu.m.      408.96        1.00 cu.m.         163.58
         Cement                          350            kgs      3976.92    1000.00 kgs            1391.92
         Water                            1.2           KL        77.00         1.00 KL             92.40
         Machinery
         Batchingplant 0.5 cum          0.308          Hour       531.50        1.00 Hour          163.70
         LA on crew charges              20%                      110.11        1.00                22.02
         manpower
         1st Class Mason                0.067           Nos.      558.00        1.00 Each           37.39
         2nd Class Mason                0.133           Nos.      504.00        1.00 Each           67.03
         Man Mazdoor                    3.077           Nos.      444.00        1.00 Each          1366.19
         Basic rate per Cu.m                                                           Total       3304.23
    a)   Chajja / Sunshade
         Cost of RCC for 62.5 mm        0.0625         cu.m.     3304.23     1.00      cu.m.       206.51
         thick sunshade
         Rate for other Floors                          GF         FF         SF          TF         4th
         Rate as worked out above                     206.51      206.51    206.51     206.51      206.51
         per
         HireCum.
              charges on centering                    150.00      150.00    150.00     150.00      150.00
         material
         Labour charges for centering                 146.00      160.60    175.20     189.80      204.40
         La on centering labour          20%           29.20      32.12     35.04      37.96        40.88
         charges
         Lift charges @ 10% extra on                               9.19     18.38      27.57        36.77
         each floor                                   531.71      558.42    585.13     611.84      638.56
         Add        Overheads        & 0.13615        72.39     76.03       79.67     83.30         86.94
         Contractors
         Rate per Sqmt.          Profit  Total      604.15     634.50      664.85    695.15        725.55
         @13.615%
9        Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size
         290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including
         cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to
         site, including seigniorage charges, sales & other taxes on all materials, all
         operational, incidental and labour charges such as mixing cement mortar,
         constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
         finished item of work. (APSS No. 501 & 504).
                                                Page 79 of 147
 5th      6th
206.51   206.51
150.00   150.00
219.00   233.60
43.80    46.72
45.96    55.15
665.27   691.98
90.58    94.21
755.90   786.20
                  0.009135 109.469075
                  180
                          Page 80 of 147
     Man Mazdoor                          0.7           Nos.      444.00       1.00       Each     310.80
     Woman Mazdoor                        2.1           Nos.      444.00       1.00       Each     932.40
     Basic Rate per Cum.                                                                          4283.48
10   Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS
     1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and
     shapes placing in position with cover blocks of approved size and binding wire of
     20SWG, forming grills for reinforcement work as per approved designs and drawings
     including cost and conveyance of bars from approved sources to site of work, including
     cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels,
     wastage etc., and all operational, incidental, and labour charges such as cutting,
     bending, placing in position, tying etc., and sales & other taxes,on cost of all materials
     complete for finished item of work (APSS No.126) in all floors.
     Material
     Cost of steel including 5%          1.05           MT       32213.77      1.00 MT            33824.46
     wastage  and overlaps
     cost of binding wire                 6              Kg       51.00        1.00 Kg             306.00
     Labour
     Blacksmith/Tin Smith/Bar             3             Nos       702.00       1.00 Nos           2106.00
     bender I st class Smith/Bar
     Blacksmith/Tin                       7             Nos       558.00       1.00 Nos           3906.00
     bender II st class
     Light mazdoor                        10            Nos       444.00       1.00 Nos           4440.00
     Rate per MT                                                                       Total      44582.46
11   Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM
     (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and
     conveyance of all materials like cement, sand, water etc., to site, seigniorage charges,
     sales & other taxes on all materials,all operational, incidental and labour charges such
     as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves
     wherever necessary as directed by Engineer - in - charge, finishing, curing, etc.,
     complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
     Material
     Base coat 8mm thick in
     C.M. (1:5)
     Cement                              3.17           kgs      3976.92    1000.00 kgs            12.61
     cost of sand for mortor             0.011         cu.m.      408.96       1.00 cu.m.           4.50
     Top Coat 4mm thick in C.M.
     (1:3)
     Cement                              1.92           kgs      3976.92    1000.00 kgs             7.64
     cost of sand for mortor             0.004         cu.m.      408.96       1.00 cu.m.           1.64
     Labour
                                                Page 81 of 147
  5th       6th
4283.48   4283.48
 44.13     44.13
 851.56   966.67
 170.31   193.33
 970.62   1164.74
6320.10   6652.35
 860.48   905.72
7180.60   7558.10
  5th       6th
44582.46 44582.46
5226.00   6271.20
49808.46 50853.66
6781.42   6923.73
56589.90 57777.40
90.851735
                                Page 82 of 147
     1st Class Mason                     0.063          Nos.     558.00       1.00 Each         35.15
     2nd Class Mason                     0.147          Nos.     504.00       1.00 Each         74.09
     Light mazdoor                       0.39           Nos.     444.00       1.00 Each         173.16
     Basic rate per 1 Sqmt.                                                                     308.78
12   Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top
     coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of
     all materials like cement, sand, water etc., to site, seigniorage charges, sales & other
     taxes on all materials,all operational, incidental and labour charges such as mixing
     mortar, scaffolding charges, lift charges, including cutting of Grooves wherever
     necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for
     Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
     Material
     Base coat 8mm thick in
     C.M. (1:6)
     Cement                              2.64           kgs      3976.92   1000.00    kgs       10.50
     cost of sand for mortor             0.011         cu.m.     408.96     1.00     cu.m.       4.50
     Top Coat 4mm thick in
     C.M. (1:4)
     Cement                              1.44           kgs      3976.92   1000.00    kgs        5.73
     cost of sand for mortor             0.004         cu.m.     408.96     1.00     cu.m.       1.64
     Labour
     1st Class Mason                     0.063          Nos.     558.00     1.00     Each       35.15
     2nd Class Mason                     0.147          Nos.     504.00     1.00     Each       74.09
     Light mazdoor                       0.39           Nos.     444.00     1.00     Each       173.16
     Basic rate per 1 Sqmt.                                                                     304.76
                                                Page 83 of 147
 5th      6th
308.78   308.78
 2.37     2.37
38.00    43.08
 7.60     8.62
141.20   169.44
497.95   532.29
67.80    72.47
565.75   604.76
 5th      6th
304.76   304.76
 0.99     0.99
19.16    21.75
 3.83     4.35
141.20   169.44
469.94   501.29
63.98    68.25
533.95   569.55
                  Page 84 of 147
13   Providing impervious coat over RCC roof slab to required slopes with CM (1:3)
     prop. 20mm thick (average) mixed with water proofing compound manufactured by
     reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid
     over roof slab when it is green, finished smooth with a floating coat of neat cement and
     thread lining at regular intervals of 45cmx45cm including cost and conveyance of all
     materials like cement, sand, water proofing compound, water etc., to site, seigniorage
     charges, sales & other taxes on all materials, all operational, incidental and labour
     charges such as mixing mortar, laying, rounding off at junctions of wall and slab,
     rendering smooth with thread lining, curing, lift charges, etc., complete for finished
     item of work (APSS No. 901 & 903).
     cost of cement for Cement       10.08            kg       3.98          1.00 kg             40.09
     Mortar (1:3)
     sand for Cement Mortar          0.021          cu.m.     408.96         1.00 cu.m.          8.59
     (1:3)
     Water proof compound              0.2           Kgs      102.00         1.00   Kgs          20.40
     1st Class Mason                 0.066           Nos.     558.00         1.00   Each         36.83
     2nd Class Mason                 0.154           Nos.     504.00         1.00   Each         77.62
     Man Mazdoor                      0.37           Nos.     444.00         1.00   Each        164.28
     Basic rate per 1 Sqmt.                                                                     347.80
     Rate for other Floors                           GF         FF         SF          TF         4th
     Basic rate per 1 Sqmt.                        347.80     347.80     347.80      347.80     347.80
     Lift charges @ 10% extra on                               27.87      55.74       83.62     111.49
     each floor
                                                   347.80     375.67     403.54      431.42     459.29
     Add      Overheads           & 0.13615         47.35      51.15      54.94       58.74      62.53
     Contractors              Profit
     @13.615%
     Rate per 1 Sqmt.                 Say          395.15     426.85     458.50     490.20      521.85
14   Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm
     and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712,
     IS:13630(Parts 1to15) of any colour and finish in all shades and designs set over a
     base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat
     cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per
     Sq.m and jointed with neat white cement paste to full depth mixed with pigment of
     matching shade including cost and conveyance of all materials like cement, sand,
     water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all
     materials, all operational, incidental and labour charges such as mixing of cement
     mortar, laying, curing, lift charges etc., complete for finished item of work.(APSS
     No.701 & 707) in All Floors
     Material
     Ceramic Tiles (BMT-C.01)         1.05          Sqmt.     432.00         1.00 Sqmt.         453.60
     Sand                            0.012           cum      408.96         1.00 cum            4.91
     Cement                           2.16           Kgs      3976.92     1000.00 Kgs            8.59
     Grey Cement for slurry           3.3            Kgs      3976.92     1000.00 Kgs            13.12
     White Cement for pointing        0.2            Kgs       25.00         1.00 Kgs            5.00
     Labour
     1st Class Mason                 0.096           Nos.     558.00         1.00 Each           53.57
     2nd Class Mason                 0.224           Nos.     504.00         1.00 Each          112.90
     Man Mazdoor                      0.33           Nos.     444.00         1.00 Each          146.52
     Add water charges @1% on         1%                      798.21                             7.98
     labour
     Basic rate per 1 Sqmt.                                                                     806.19
     Rate for other Floors                           GF         FF          SF         TF         4th
     Basic rate per 1 Sqmt.                        806.19     806.19     806.19      806.19     806.19
     Lift charges @ 10% extra on                               31.30      62.60      93.90      125.19
     each floor                                    806.19     837.49     868.79      900.09     931.38
     Add      Overheads           & 0.13615        109.76     114.02     118.29      122.55     126.81
     Contractors
     Rate per Sqmt.           Profit               915.95     951.55     987.10     1022.65     1058.20
     @13.615%
                                             Page 85 of 147
 5th       6th
347.80    347.80
139.36    167.23
487.16    515.03
66.33      70.12
553.50 585.15
  5th       6th
806.19    806.19
156.49    187.79
962.68    993.98
131.07    135.33
1093.75   1129.35
                    Page 86 of 147
15   Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300
     mm / 245 mm x 325 mm and thickness 6mm 1st quality conforming to IS:13711,
     IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs
     and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of
     3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching
     shade including cost and conveyance of all materials like cement, sand, water, tiles,
     etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as
     mixing of cement mortar, laying in position, curing, lift charges etc., complete for
     finished item of work (APSS No.701 & 707) in All Floors
     Glazed ceramic wall tiles          1.05          Sqmt      339.00        1.00 Sqmt          355.95
     (BMT-C.21)
     Grey cement                        0.33           Kgs      3976.92   1000.00 Kgs             1.31
     White cement                        0.6           Kgs       25.00        1.00 Kgs           15.00
     Cement for Cement Mortar           3.45           Kgs      3976.92       1.00 Kgs           13.72
     CM (1:5)
     Sand  Mortar CM (1:5)              0.012         Cum       408.96        1.00 Cum            4.91
     Labour
     1st Class Mason                    0.077          Nos.     558.00        1.00 Each          42.97
     Man Mazdoor                        0.08           Nos.     444.00        1.00 Each          35.52
     Basic rate per 1 Sqmt.                                                                      469.38
     Rate for other Floors                             GF         FF        SF         TF         4th
     Basic rate per 1 Sqmt.                          469.38     469.38    469.38     469.38      469.38
     Lift charges @ 10% extra on                                 7.85      15.70      23.55      31.39
     each floor                                      469.38     477.23    485.08     492.93      500.77
     Add      Overheads           &    0.13615        63.91      64.97     66.04      67.11      68.18
     Contractors
     Rate per Sqmt.           Profit                 533.30     542.20    551.15     560.05      568.95
     @13.615%
16   Whiting to new walls and ceiling in two coats with White cement or equavalent
     quality to give an even shade after thoroughly brushing the surface to remove all loose
     powdered materials including cost and conveyance of all materials and water to site,
     sales & other taxes, all operational, incidental and labour charges such as cleaning the
     surface, painting, curing etc., complete for finished item of work for internal walls.
     (APSS No.901 & 908) in All Floors
17   Painting to New walls with two coats of water proof cement paint of superior
     quality of approved brand and shade over base coat of cement primer grade -I making
     three coats in all to give an even shade after thoroughly brushing the surface to
     remove all loose powdered materials, including cost and conveyance of all materials,
     including cost and conveyance of all materials, cost of brushes, water to site, etc.,
     sales & other taxes, all operational, incidental and labour charges such as scaffolding
     charges, lift charges, curing etc., complete for finished item of work in all floors for
     External Walls.(APSS No. 912) in All Floors
     Material
     Cement Primer Grade I               0.1           Kgs      128.00        1.00 Kgs           12.80
     water proof cement paint           0.35           Kgs       42.68        1.00 Kgs           14.94
     pack
     Labour for Priming Coat
     1st class painter                  0.021          Nos.     642.00        1.00 Each          13.48
     2nd class painter                  0.049          Nos.     504.00        1.00 Each          24.70
     Labour for Two Coats
     1st class painter                  0.015          Nos.     642.00        1.00 Each           9.63
                                               Page 87 of 147
 5th      6th
469.38   469.38
39.24    47.09
508.62   516.47
69.25    70.32
577.90   586.80
                  Page 88 of 147
     2nd class painter                 0.035          Nos.      504.00           1.00 Each         17.64
     Man and women mazdoor             0.15           Nos.      444.00           1.00 Each         66.60
                                                                                                   159.79
     Add      Overheads      &        0.13615                   159.79                             21.75
     Contractors         Profit
     Rater per 1 Sqmt. for all                                                          Total      181.55
     @13.615%
     floors
18   Painting to New Iron work with two coats of ready mixed Synthetic Enamel paints
     in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50
     grams/ liter over an existing steel primer including cost and conveyance of all
     materials to site, sales & other taxes, incidental, operational and all labour charges
     etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
19   Supply and Fixing MS GILLS including Labour Charges for fixing complete including
     cost and conveyance of all materials to site, sales and other taxes, all labour charges
     etc., complete for finished item of work
20   Painting to New walls with two coats of acrylic emulsion paint having VOC (Volatile
     Organic Compound) content less than 50 grams/liter of superior quality of approved
     brand and shade over base coat of cement primer grade -I making three coats in all to
     give an even shade after thoroughly brushing the surface to remove all loose powdered
     materials, including cost and conveyance of all materials, including cost and
     conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all
     operational, incidental and labour charges such as scaffolding charges, lift charges,
     curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in
     All Floors INTERNAL
                                              Page 89 of 147
Page 90 of 147
21   Painting to New walls with two coats of acrylic emulsion paint weather proof
     waterbased, modified acrylic with silicon additives exterior grade having VOC (Volatile
     Organic Compound ) content less than 50 grams/ liter of superior quality of approved
     brand and shade over base coat of cement primer grade -I making three coats in all to
     give an even shade after thoroughly brushing the surface to remove all loose powdered
     materials, including cost and conveyance of all materials, including cost and
     conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all
     operational, incidental and labour charges such as scaffolding charges, lift charges,
     curing etc., complete for finished item of work in all floors for Walls.(APSS No. 911) in
     All Floors EXTERNAL
     Cement Primer Grade I             0.1            Kgs       128.00          1.00 Kgs            12.80
     (BMT-J.01)
     Plastic  Emulsion Paint-          0.08           Ltr       193.00          1.00 Ltr            15.44
     BMT-J.24
     Labour for Priming Coat
     1st class painter                0.021           Nos.      642.00          1.00 Each           13.48
     2nd class painter                0.049           Nos.      504.00          1.00 Each           24.70
     Labour for Two Coats
     1st class painter                0.021           Nos.      642.00          1.00 Each           13.48
     2nd class painter                0.049           Nos.      504.00          1.00 Each           24.70
     Mazdoor                          0.150           Nos.      444.00          1.00 Each           66.60
                                                                                                   171.20
     Add      Overheads      &       0.13615                    171.20                              23.31
     Contractors         Profit
     Rater per 1 Sqmt. for all                                                          Total      194.55
     @13.615%
     floors
22   Making Green Chalk Board of size 3.00Mx1.20Mts including border with plastering in
     CM (1:2) 12mm thick as base coat and 3mm thick top coat with cement green oxide
     powder in (1:1) prop. and making border of 50x20mm thick alround the chalk board
     over existing plastered surface and painting the chalk board surface with chalk board
     paint as per direction of Engineer-in-Charge including cost and conveyance of all
     materials, sales and other taxes on cost of materials and all operational, incidental and
     labour charges etc., complete for finished item of work (APSS No.1603)
                                              Page 91 of 147
Page 92 of 147
     DATA FOR GREEN BOARD
     Cost of Base Coat in CM           4.03         Sqmts.       1791.14        10.00     Sqmts.     721.83
     (1:2)
     Cost of Top Coat                   3.6         Sqmts.       2602.62        10.00     Sqmts.     936.94
     20mm thick Plastering in          0.43         Sqmts.       3499.16        10.00     Sqmts.     150.46
     CM
     Cost(1:2)
          of chalk Board paint         4.03         Sqmts.        384.40        10.00     Sqmts.     154.91
                                                                                          Total     1964.14
     Rate per Each Board                                                                   Say      1964.15
     rate per sqmt                                                                                   545.60
     Add      Overheads         &     0.13615                     545.60                              74.28
     Contractors            Profit                             rate per sqmt                         619.90
     @13.615%
23   Providing and laying of cinder concrete in cement cinder mix (1 :15) prop. Using 12.5
     mm nominal size cinder laid in layers and compacted as directed for filling sunken
     floors including cost and conveyence of all materials, water to the work site, seinerage
     charges and all operational, incidental labour charges such as mixing cement & cinder
     etc. complete for finished item of work.
     cost of cinder meterial BMT-      1.00            cum        567.00        1.00       cum       567.00
     A.17
     43 Grade cement                   95.00           Kgs       3976.92       1000.00    Kgs        377.81
     1st Class Mason                    0.10           Nos.      558.00          1.00     Each        55.80
     Man mazdoor                        2.36           Nos.      444.00          1.00     Each      1047.84
                                                                                                    2048.45
     Add      Overheads         &     0.13615                                                        278.90
     Contractors            Profit
     @13.615%
                                                                                                    2327.35
24   Flooringwith 16 to 18mm thick high polished granite stone slabs of black colour
     approved by the engineer-incharge laid over RCC slab or bed alredy laid and set over
     base coat of     CM (1:8) 20mm thick including neat cement , slurry of honey like
     consistency spread at the rate of 3.30kg per sqm and joined with neat white cement
     paste mixed with pisment of matching shade to ful allmaterials to work site depth
     including cost and conveyence of and all materials to work site and operational ,
     incidentallabour and lift charges and seignorage charges etc., complete for finshed
     item of work for platform in kitchen/diniing (SS 701 & special)
     Materials
     High polished granite 16 to 10.50           Sqm            2343.75    1 sqm         Sqm       24609.42
     18mm   thick for
     corese sand  black
                      C.M. 1:8   0.20            Cum            526.70     1 cum         Cum       105.34
     Cement for CM1: 8 base 36.00                Kgs            3976.92    1000 kgs Kgs            143.17
     coat
     Cement for slurry      33.00                Kgs            3976.92    1000 kgs Kgs            131.24
     Cement for joining              6.00        Kgs            3976.92    1000 kgs Kgs            23.86
     Labour
     1 st class mason                3.00        Nos            558.00     each          Nos       1674.00
     2nd class mason                 1.00        Nos            504.00     each          Nos       504.00
     Man Mazdoor                     8.00        Nos            444.00     each          Nos       3552.00
     Add water charges @1% on 1%                                30743.03                           307.43
     labour                                                                                        31050.46
     Rete per 1 sqm                                                                                3105.05
     Add       Overheads        & 0.13615                                                          422.75
     Contractors
     Rete per 1 sqm         Profit                                                                 3527.80
     @13.615%
25   Half Rounding the edges of granite slab including polishing all labour charges, hire
     charegs of tools and plants All incidental charges etc., complete for finished item of
     work as directed by the engineer incharge
                                              Page 93 of 147
Page 94 of 147
     As per SSR BMM-V.10                  1         RMT             289.00   1.00      RMT         289.00
     Add       Overheads             & 0.13615                                                     39.35
     Contractors                 Profit
     Rate per RM                                                                       total       328.35
     @13.615%
26   Manufacture, supply, & delivery of 50mm outer dia HDPE pipes ( PE - 100 Grades )
     conforming to IS 4984 - 1995 at 6Kg/Sqcm. including cost and conveyance of all
     materials to site, all labour charges, sales and other taxes on all materials etc.,
     complete for finished item of work for All Floors.
     Intial Cost as per PHSSR 1                 RMT      62.00      1.00     RMT         62.00
     Table - 16
     Add        Overheads        & 0.13615                                               8.44
     Contractors             Profit
     @13.615%
                                                                             total rate per Rmt. 70.45
                                               Page 95 of 147
Page 96 of 147
                                     Data for Water supply and Sanitary arrangements
 Name of the work : Construction of Toilets to primisess of Water Resources Department Division Office at Madanapalli in Chittoor
                                                              District
22      Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all
        materials, labour charges etc., complete for finished item of work in all floors.
     a) 300 grams
        Basic rate as per ssr item                          BMW-E.09          1.00        Nos   223.00      1.00 Nos              223.00
        Area allowence on labour charges                    BMW-E. 10     20%                   29.00       1.00       0.00         5.80
                                                                                                                                  228.80
              Add Overheads & Contractors Profit @13.615%                  13.62%                                                  31.15
        Total rate per 1 Nos                                                                                                      259.95
     b) 400 gms
        Basic rate as per ssr item                          BMW-E 07          1.00        Nos   349.00      1.00 Nos              349.00
        Area allowence on labour charges                    BMW-E 08      20%                   29.00       1.00       0.00         5.80
                                                                                                                                  354.80
              Add Overheads & Contractors Profit @13.615%                  13.62%                                                  48.31
        Total rate per 1 Nos                                                                                                      403.15
19      Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all
        special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC
        clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour
        charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
     WS-DATA                                                                                                                  P No 97
     c) 28.60 mm dia CPVC SDR 13.50
        Basic rate as per ssr item                          BMW-I 222          1.00 Rmt           123.00     1.00 RMT              123.00
        Area allowence on labour charges                    BMW-I 415      20%        Rmt          31.00     1.00 Rmt                6.20
                                                                                                                                   129.20
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                  17.59
        Total rate per 1 RMT                                                                                                       146.80
21 (A Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to
   & IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and
   B) fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround
      well above the joint to stop leakage at the joint etc., 10 Litres capacity Single Flush white PVC low level flushing system
      parryware, slimline with internal components and short bend including cost and conveyance of all materials to site, all labour
      charges, sales and other taxes on all materials etc., complete for finished item of work for all floorscomplete including cost
      and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item
      of work.
        Basic rate as per ssr item                          BMW-D.04           1.00     Nos       1399.00    1.00 Nos            1399.00
        Area allowence on labour charges                    BMW-D.06       20%                    377.00     1.00       0.00        75.40
        Providing brick masonry seat                        BMW-D.09           1.00     Nos       278.00     1.00 Nos              278.00
                                                                                                                                 1752.40
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                 238.59
        Total cost (A +B)                                                                                                        1991.00
     (C) Supply and Fixing 10 Litres capacity Single Flush white PVC low level flushing system parryware, slimline with internal
         components and short bend including cost and conveyance of all materials to site, all labour charges, sales and other taxes on
          all materials etc., complete for finished item of work for all floors.
        Basic rate as per ssr item                          BMW-G.08           1.00     Nos       1254.00    1.00 Nos            1254.00
        Area allowence on labour charges                    BMW-G.152      20%                     70.00     1.00       0.00        14.00
                                                                                                                                 1268.00
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                 172.64
        Total rate per 1 No                                                                                                      1440.65
                                                                              Total cost (A +B+C)                                3431.65
24      Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and
        manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow
        pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for
        placing and fixing in position as directed by Engineer-in-Charge.
        Basic rate as per ssr item                          BMW-G.01           1.00         Lit    5.00      1.00 Lit                5.00
        Area allowence on labour charges                    BMW-G.02       20%                     1.00      1.00       0.00         0.20
                                                                                                                                     5.20
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                   0.71
        Total rate per 1 Ltr                                                                                                         5.95
25      Supplying and fixing 609.6 mm x 457.2 mm x 254 mm RCC terrazo finished sink (or constructed at site with 50.80 mm thick)
        brass plug and chain incluiding CI cantilever brackets, 31.75 mm dia PVC flexible waste pipe 914.4 mmm length of 1st quality
        including cost and conveyance fo all materials labour charges etc., complete for finished item of work
        Basic rate as per ssr item                          BMW-D.40           1.00     Nos       704.00     1.00 Nos              704.00
        Area allowence on labour charges                    BMW-D.41       20%                    225.00     1.00       0.00        45.00
                                                                                                                                   749.00
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                 101.98
        Total rate per 1 No                                                                                                        851.00
     WS-DATA                                                                                                                   P No 98
26     Supply and fixing of stainless steel sink with drain board of size 914.4 mm x 457.2 mm 1 mm thick of indian make on
       cantilever brackets including 32 mm CP waste coupling including supply & fixing of 31.75 mm dia PVC flexible waste pipe of
       914.4 mm length of 1st quality, chasing brick masonry wall and making good after construction i.e., restoring to original
       srufaces etc., complete including cost and conveyance of all materials and labour charges for all operations etc., complete for
       finished item of work in all floors
       Basic rate as per ssr item                           BMW-I.119           1.00     Nos   6471.00        1.00 Nos            6471.00
       Area allowence on labour charges                     BMW-I.120       20%                 506.00        1.00       0.00       101.20
                                                                                                                                  6572.20
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                  894.81
       Total rate per 1 No                                                                                                        7467.05
27     Supply & Fixing of 22" dia RCC Cover for manhole with nominal reinforecement 3" thick with hooks for lfifting including cost
       and conveyance of all materials, labour charges etc., complete for finished tiem of work
       Basic rate as per ssr item                           BMW-I.130           1.00     Nos    633.00        1.00 Nos              633.00
       Area allowence on labour charges                                     20%                  0.00         1.00       0.00         0.00
                                                                                                                                    633.00
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                   86.18
       Total rate per 1 No                                                                                                          719.20
28     Supply and fixing of 100 mm dia CI Vent pipe of 3 mts length double socket fitted with AC cowl and mosquito proof wire mesh
       including cost and conveyance of all materials to site and labour charges for placing and fixing in position etc., complete for
       finished item of work.
       Basic rate as per ssr item                           BMW-H.05            1.00     Nos   1902.00        1.00 Nos            1902.00
       Area allowence on labour charges                                     20%                  0.00         1.00       0.00         0.00
                                                                                                                                  1902.00
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                  258.96
       Total rate per 1 No                                                                                                        2161.00
29     Supply and fixing of 75 mm dia CI Vent pipe of 3 mts lenth fitted with AC cowl and mosquito proof wire mesh including cost
       and conveyance of all materials to site and labour charges for placing and fixing in position etc., complete for finished item of
       work.
       Basic rate as per ssr item                           BMW-H.04           1.00      Nos   1410.00        1.00 Nos            1410.00
       Area allowence on labour charges                                     20%                  0.00         1.00     0.00          0.00
                                                                                                                                  1410.00
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                 191.97
       Total rate per 1 No                                                                                                        1602.00
30   a Supply and fixing of CI pipes 101.6mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with cement
       caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery walls in CM
       (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete including cost and
       conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,, complete for finished item of
       work all Floors
       Basic rate as per ssr item                           BMW-C.02           1.00      Nos    880.00        1.00 Nos             880.00
       Area allowence on labour charges                     BMW-C.07        20%                 227.00        1.00     0.00         45.40
                                                                                                                                   925.40
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                 125.99
       Total rate per 1 No                                                                                                        1051.40
31   b Supply and fixing of CI pipes 76.2 mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with cement
       caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery walls in CM
       (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete including cost and
       conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,, complete for finished item of
       work all Floors
       Basic rate as per ssr item                           BMW-C.01           1.00      Nos    678.00        1.00 Nos            678.00
       Area allowence on labour charges                     BMW-C.07        20%                 227.00        1.00     0.00        45.40
                                                                                                                                  723.40
              Add Overheads & Contractors Profit @13.615%                     13.615%                                              98.49
       Total rate per 1 No                                                                                                        821.90
23     Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0")
       and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and convenyance of
       all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished item of work
       Basic rate as per ssr item                           BMW-B.06            1.00     Nos   3238.00        1.00 Nos            3238.00
       Area allowence on labour charges                     BMW-B.08        20%                 71.00         1.00       0.00        14.20
                                                                                                                                  3252.20
              Add Overheads & Contractors Profit @13.615%                  13.615%                                                  442.79
       Total rate per 1 No                                                                                                        3695.00
     WS-DATA                                                                                                                    P No 99
24     Supply and Fixing of AC Cowls 88.9 mn dia with all necessary requirements including all operational , incidental sales and
       other taxes and all labour charges etc., complete including cost and convenyance of all materials complete for finished item of
       work for all Floors.
       Basic rate as per ssr item                          BMW-I.36          1.00      Nos    62.00         1.00 Nos            62.00
       Area allowence on labour charges                    BMW-I.37       20%                 14.00         1.00     0.00        2.80
                                                                                                                                64.80
             Add Overheads & Contractors Profit @13.615%                 13.615%                                                 8.82
       Total rate per 1 No                                                                                                      73.65
25      Supply & Fixing of steel surgical long elbow action handle 12.7 mm dia bib cock Indian make heavy type including all
       materials
       Basic rate as per ssr item                     BMW-I.126          1.00    Nos 853.00        1.00 Nos          853.00
       Area allowence on labour charges                    BMW            20%                               1.00       0.00      0.00
                                                                                                                               853.00
             Add Overheads & Contractors Profit @13.615%                 13.615%                                               116.14
       Total rate per 1 No                                                                                                     969.15
26     Supply & Fixing of Jaquar make chrome plated Metro pole flush valve concealed type with cover plate 40mm size with 7 years
       warranty / Jupiter Aqua Lines-JALor equivalent series
       Basic rate as per ssr item                          BMW-I.198          1.00     Nos   3189.00        1.00 Nos          3189.00
       Area allowence on labour charges                    BMW            20%                  0.00         1.00       0.00      0.00
                                                                                                                              3189.00
             Add Overheads & Contractors Profit @13.615%                 13.615%                                               434.18
       Total rate per 1 No                                                                                                    3623.20
27     Supply and Fixing of AC Cowls 63.50 mn dia with all necessary requirements including all operational , incidental sales and
       other taxes and all labour charges etc., complete including cost and convenyance of all materials complete for finished item of
       work for all Floors.
       Basic rate as per ssr item                          BMW-I.38           1.00     Nos    42.00         1.00 Nos            42.00
       Area allowence on labour charges                    BMW-I.39       20%                 11.00         1.00       0.00      2.20
                                                                                                                                44.20
             Add Overheads & Contractors Profit @13.615%                 13.615%                                                 6.02
       Total rate per 1 No                                                                                                      50.25
28     Construction of 50.8mm thick RCM Baffle wall with 2.267 Kg steel and rabit wire mesh in CM (1:3) prop: with fine rendering
       in neat cement in septic tank including cost and convenyance of all materials to site, seigonarage charges sales and othe taxes
       on all materials , and all labour charges etc., complete for finished item of work.
       Basic rate as per ssr item                          BMW-I.95          1.00      Nos   212.00         1.00 Nos           212.00
       Area allowence on labour charges                    BMW-I.97       20%                 44.00         1.00     0.00        8.80
                                                                                                                               220.80
             Add Overheads & Contractors Profit @13.615%                 13.615%                                                30.06
       Total rate per 1 No                                                                                                     250.90
29     Supply and Fixing of C.I. (Spun ) Soil waste and ventilating pipe of 3.00 Mt length of 100mm dia with double socket for vent
       over septic tank including cost and convenyance of all materials to site, all labour charges sales and all other taxes on all
       materials etc., complete for finished item of work.
       Basic rate as per ssr item                          BMW-H05            1.00     Nos   1902.00        1.00 Nos          1902.00
       Area allowence on labour charges                                   20%                  0.00         1.00       0.00      0.00
       Basic rate as per ssr item                          BMW-I.36           1.00     Nos    62.00         1.00 Nos            62.00
       Area allowence on labour charges                    BMW-I37        20%                 14.00         1.00       0.00      2.80
                                                                                                                              1966.80
             Add Overheads & Contractors Profit @13.615%                 13.615%                                               267.78
       Total rate per 1 No                                                                                                    2234.60
30     Supply and Fixing of 914.4mm x 457.2mm Light Weight CI Manhole Frame and Cover (30 Kgs) complete for finished item of
       work including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc.,
       complete for finished item of work.
       Basic rate as per ssr item                          BMW-I.86           1.00     Nos   1732.00        1.00 Nos          1732.00
       Area allowence on labour charges                    BMW-I88        20%                140.00         1.00       0.00     28.00
                                                                                                                              1760.00
             Add Overheads & Contractors Profit @13.615%                 13.615%                                               239.62
       Total rate per 1 No                                                                                                    1999.65
     WS-DATA                                                                                                              P No 100
31     Supply and Fixing of CI Steps for Septic Tank / Manhole complete for finished item of work including cost and conveyance of
       all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.
       Basic rate as per ssr item                          BMW-I.89              1.00    Nos    57.00         1.00 Nos             57.00
       Area allowence on labour charges                    BMW-I90            20%               11.00         1.00       0.00       2.20
                                                                                                                                   59.20
             Add Overheads & Contractors Profit @13.615%                      13.615%                                               8.06
       Total rate per 1 No                                                                                                         67.30
32     Supply and Fixing 10 Litres capacity Single Flush white PVC low level flushing system parryware, slimline with internal
       components and short bend including cost and conveyance of all materials to site, all labour charges, sales and other taxes on
        all materials etc., complete for finished item of work for all floors.
       Basic rate as per ssr item                          BMW-G.08              1.00    Nos   1254.00        1.00 Nos          1254.00
       Area allowence on labour charges                                       20%                0.00         1.00       0.00       0.00
                                                                                                                                1254.00
             Add Overheads & Contractors Profit @13.615%                      13.615%                                            170.73
       Total rate per 1 No                                                                                                      1424.75
33     Supply & Fixing 4" dia (101.6 mm) CI Plug (Door) bends 1st quality ISI marked conforming to IS : 1729-1979 with cement
       caulked joints and fixing as per site requirements with standard practice including cost and conveyance of all materials to site,
       all labour charges, sales and other taxes on all materials etc., complete for finished item of work for all floors.
       Basic rate as per ssr item                          BMW-C.12              1.00    Nos   396.00         1.00 Nos           396.00
       Area allowence on labour charges                    BMW-C.14           20%               72.00         1.00       0.00      14.40
                                                                                                                                 410.40
             Add Overheads & Contractors Profit @13.615%                       13.62%                                              55.88
       Total rate per 1 No                                                                                                       466.30
34     Supply & Fixing 3" dia (76.2 mm) CI Plug (Door) bends 1st quality ISI marked conforming to IS : 1729-1979 with cement
       caulked joints and fixing as per site requirements with standard practice including cost and conveyance of all materials to site,
       all labour charges, sales and other taxes on all materials etc., complete for finished item of work for all floors.
       Basic rate as per ssr item                          BMW-C.11              1.00    Nos   322.00         1.00 Nos           322.00
       Area allowence on labour charges                    BMW-C.14           20%               72.00         1.00       0.00      14.40
                                                                                                                                 336.40
             Add Overheads & Contractors Profit @13.615%                      13.615%                                              45.80
       Total rate per 1 No                                                                                                       382.20
35     Manufacture, supply & delivery of 50mm of outer dia HDPE pipes of 10 Kg/Sqcm. conforming to IS 4984 - 1995 including
       transportation to site including laying and jointing of HDPE pipes as per BIS No.7634 Part -II/75 including fixing required
       specials /fittings including excavation of trenches up to 0.50 mts depth in all soils except rock requires blasting and refilling
       trenches after laying and jointing of pipes as per standard specifications including cost and conveyance of all materials to site,
       all labour charges, sales and other taxes on all materials etc., complete for finished item of work.
       Basic rate as per ssr item                          TABLE 16(1)           1.00   RMT     93.00         1.00 RMT             93.00
                                                           page 52
       Labour charges for laying and jointing              12 (b) page 5 of      1.00   RMT     31.00         1.00 RMT             31.00
                                                           PH ssr
36     Construction of 60,000 liters capacity OHSR(VRCC) with 15.0 mts staging without seismic analysis including fixtures OF rcc
       OR ALLUMINIUM LADDER INSIDE 0.45 Mtrs wide, MS ladder on the outside . Lighting including condutor & earthing etc.,
       RCC ventilators with copper or stainless steel skyproof mesh, Manhole frame and cover 0.75x0.75mts with frame as per IS
       specifications (light duty - 2 Nos), Ralling with 32mm dia GI pipes (A class in 2 nos alround OHSR fixed in RCC (1:2:4) poles of
       size 100x75x75mm with 1.50mts intervals alround periphery on top of the OHSR for smaller capacities,Water level indicator of
       good quality with ebonite /copper float approved pattern - 1 no
     WS-DATA                                                                                                                P No 101
          d. RCC ventilators with copper or stainless steel
          skyproof mesh
38        Construction of Perforated Dry Brick Masonry without using CM and keeping vertical dry joints of 15 to 20mm as directed by
          the Engineer – in – Charge including cost and conveyance of all amterials to site seignorage charges, sales and other taxes, all
          labour charges etc., complete item of work for Soak Pit.
      WS-DATA                                                                                                                 P No 102
       Brick layer                                                              1.28 Each        465.00         1 Each           595.20
       Man Mazdoor                                                              0.64 Each        420.00         1 Each           268.80
       Women Mazdoor                                                            1.93 Each        420.00         1 Each           810.60
                                                                                              Total                             4385.50
             Add Overheads & Contractors Profit @13.615%                  13.615%                                                597.09
                                          Rate per Cum                                                                          4982.60
39     Supplying and fixing of European Water Closet of 1st quality confirming to IS: 2556-Part-2-1973 of Hindustan / Neycer or
       Parryware make white gllazed with 'S' trap lying and fixing best Indian make plastic seal and lid for European water closets
       with rubb
       Basic rate as per ssr item                          BMW-d14              1.00    Nos    1703.00      1.00 Nos            1703.00
       Area allowence on labour charges                    BMW-d15         0%                   264.00                             0.00
       Plastic seat & lid as per IS 2548-1996              BMW-d 16             1.00    Nos     766.00      1.00 Nos             766.00
                                                                                                                                2469.00
             Add Overheads & Contractors Profit @13.615%      0.13615                                                            336.15
40     Supplying and fixing NP Push cock of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of
       all materials, labour charges etc., complete for finished item of work in all floors.
       Basic rate as per ssr item                          BMW-E.29          1.00       Nos     234.00      1.00 Nos             234.00
       Area allowence on labour charges                    BMW            20%                               1.00     0.00          0.00
                                                                                                                                 234.00
             Add Overheads & Contractors Profit @13.615%                  13.615%                                                 31.86
       Total rate per 1 No                                                                                                       265.90
41     Supplying and fixing PPR Ball valve as per ISI Class - I , Indian make heavy type including cost and conveyance of all
       materials , labour charges etc. complete for finished item of work.
     WS-DATA                                                                                                              P No 103
       Total rate per 1 No                                                                                                         954.40
42     Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty - including cost and
       conveyance of all materials , labour charges etc. complete for finished item of work.
       50 mm NB Size
       Basic rate as per ssr item                            BMW-F.39             1.00      Nos   2548.00      1.00 Nos           2548.00
       Area allowence on labour charges                      BMW-F 40      20%                    112.00       1.00        0.00     22.40
                                                                                                                                  2570.40
               Add Overheads & Contractors Profit @13.615%                  0.13615                                                349.96
       Total rate per 1 No                                                                                                        2920.40
43     Supply and fixing of 4" (101.6mm) Nahny trap including cost and conveyance
       Rate for SSR 2013-14--BMW-G.114, Sl.No.448, P.No. 139                              1 No               83.00
       Round Jali SSR 2013-14--BMW-G.121, Sl.No.455, P.No. 139                                               20.00
       Add Overheads & Contractors Profit @13.615%                       0.13615                             14.02
                                                                                                             11.62
       Rate for each                                                                                        128.65
44     Supply, excavation of trench and laying of 63mm OD 10kg/cm2 PVC Pipe including cost & conveyance of
       materials to site, labour charges for excavation of trench and refilling the same complete for finished item
       of work.
       a) 75 mm Dia
       Cost of 10kg/cm2 pressure water PVC pipe PH SSR P.59                                       177.00
       Excavation of trench 1x0.60x0.90                          cum       0.54          183.65    99.17
       Add 120% extra for narrow excavation for laying of pipe line                               111.07
       Laying of pipe line BMW G-152                                                               70.00
       Back Filling of Gravel                                              0.54          271.10   146.39
       Total                                                                                      603.64
       Add Overheads & Contractors Profit @13.615%                       0.13615                   82.19
       Total                                                                                      685.81
                                                                                                  1 Rmt
       b) 63mm Dia
       Cost of 10kg/cm2 pressure water PVC pipe PH SSR P.59                                       122.00
       Excavation of trench 1x0.60x0.90                          cum       0.54          183.65    99.17
       Add 120% extra for narrow excavation for laying of pipe line                               111.07
       Laying of pipe line BMW G-152                                                               70.00
       Back Filling of Gravel                                              0.54          271.10   146.39
       Total                                                                                      548.64
       Add Overheads & Contractors Profit @13.615%                       0.13615                   74.70
       Total                                                                                      623.32
                                                                                                  1 Rmt
45      Supply & Fixing of steel surgical long elbow action handle 12.7 mm dia bib cock Indian make heavy type
       including all materials
       As per the SSR Item NO BMW-I.126                                                          853.00
       Add Overheads & Contractors Profit @13.615%                      0.13615                  116.14
       Total                                                                                     969.14 1 No
46     Supply & Fixing of Jaquar make chrome plated Metro pole flush valve concealed type with cover plate
       40mm size with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
     WS-DATA                                                                                                                  P No 104
49     Supply & Fixing of Exclusive overhead shower with 190mm long light body shower arm Jaquar make
       Continental series,Chrome finish with 7 years warranty/ Jupiter Aqua LinesJALor equivalent series
52 Filling of brick bats in the soak pit i/c cost and conveyance of all materials, labour charges etc.
53     Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost
       and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.
     WS-DATA                                                                                                                      P No 105
                                     Electrical DATAS 2017-18
25   1.4.2 (c)   102   Supply and Fixing of 20 mm outer dia 2.10 mm thick Heavy grade
                       with IS:9537 part 3 FRLS regid PVC pipe (ISI MARK) concealed in
                       Roof Slabs with all required MS deep boxes and all accessories
                       including and labour charges etc., complete.
                       Makes:- VIP / Besto plast / GoldMedal / Million plast / GM /
                       Sudhakar / Polyline
26   3.1.4   205   Supply and run of 2 of 2.5 sq.mm (phase neutral and earth) FRLS /
                   HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990
                   specification flexible copper cable in existing MS conduit pipe for
                   individual ligting circuits including labour charges etc., complete as
                   required for switch boards.
                   Makes of wires:- Finolex / RR kabel / Havells / APAR E-beam / KEI /
                   Polycab / Bonton / V-Guard / GM / Million / HPL / Goldmedal /
                   Finecab / Vimal / Fortune Art / Gloster / Kundan cab/Sudhakar
 Name of the work : Construction of Toilets to primisess of Water Resources Department Division
                             Office at Madanapalli in Chittoor District
                                    Area allowence
                        Overheads and contractors profit on
                                    materials
                        Overheads and contractors profit on             0.000%
                                     labour
 Index Specific                       Description                     Unit    QTY      Rate Rs.    Amount Rs.             ohr
-code   ation No.
               1                            2                          3      4         5                     6            7
  1    1.4.2         Supply and Fixing of 25mm dia 2.20mm thick PVC pipe (ISI MARK) concealed in Roof Slabs
                     with all required accessories including masonary work and labour charges etc., complete.
              (C)    Make : Sudhakar/ Maco Plast / Modi
                                                                                                       1332.25
                   Add contr profit @14% on material                0.00                                   0.00
                   Total material cost                                                                 1332.25
                   b) Labour charges :
       elec-8.1.74 Skilled Electrician                              day      0.6      515.00            309.00
       elec-8.1.75 Semi skilled Electrician                         day      1.2      400.00            480.00
       elec-8.1.76 Helpers                                          day      0.6      400.00            240.00
                   Add area allowence on labour charges @           0%                                     0.00
                   Add contr profit @14% on Labour                  0%                1029.00              0.00
                   C) Cost for 6 Points                                                                2361.25
                   Rate per Point = C/6                                                                 393.55
  4        12      Supply and Fixing of 16A 3pin and 6A 3pin plug socket with and 16A switch control duly
                   recessed in wall with MS switch deep box of 6" x8" x2 1/2" size covered with hylam sheet
                   including earth connections and all labour charges etc., complete.
                   Makes : G
  5           19     Supply and run of 2 of 2.5 Sq mm PVC insulated flexible copper cable and 1 run of 1.00 Sq
                     mm flexible PVC insulated flexible copper cable in the existing conduit pipe for run of mains
                     from main panel board to TPN DB'S with pin type lugs and connectio
  6           21    Supply and fixing TPN Distribution board with IP-43 protection (Metal Door) suitable for 3
                    phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including
                    internal connection and labour charges for flush mounting etc., complete.
                    Mak
  7           26    Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per
                    size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary
                    accessories with hume pipe ring duly providing staggered holes
                   a) Material
       elec-8.1.52 Earth Work Excavation of Hard gravel Soil           cum    0.81      110.00                89.10
                   with small boulder for trench 1st step of size
                   1.5 x 0.6 x 0.9 m
                    Excavation of Hard disteggrated rocks and          cum    0.864     183.65               158.67
                    boulders for trench 2nd Step of size 1.2 x 0.6
                    x 1.2 m (Civil SSR)
                    25% extra for narrow trench & pit and back                 1        27.50                 27.50
                    filling with Sand, Coke, Salt etc., and leveling
       elec-8.1.58 40mm dia 'B' Class G.I pipe                          Mtr    2.5      381.00               952.50
                    25 x 6 mm (1"X 1/4") G.I Flat duly drilled         Each     1       75.00                 75.00
                   12mm holes (4 Nos) of 200 mm (8") length
                   a) Material
        elec-3.6.1 Supply of 1 x 36/40W Box type tube light           each       1       800.00               800.00
                   luminaire powder coated CRCA sheet steel
                   housing with Electronic Ballast Chokes and all
                   standard accessories. Makes: Wipro / G.E. /
                   Phillips / Crompton / Bajaj
  10          32    Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball
                    bearings with all standard accessories.
                    Makes: Crompton Decora / Bajaj Ultima /Havells Velocity / Usha Astra / Orient PSPO.
                   a) Material
        elec-5.1.1 1200 mm (48") Ceiling Fan                         each      1       1700.00                   1700
  11          33    Supply and erecting Electronic type regulator for ceiling fans 1200 mm sweep complete
                    erected on existing board.Make : Anchor / Gold Medal Olive / Million Zoom
                   a) Material
       elec-1.7.12 Steeped type Electronics type Regulator            M        1       198.00               198.00
                   Add contr profit @14% on material                 0.00                                     0.00
                   Total material cost                                                                      198.00
                   b) Labour charges.
       elec-8.1.78 Semi skilled Electrician                           day     0.1      400.00                40.00
                   Sundries.                                                                                 21.20
                   Add area allowence on labour charges @             0%                                      0.00
                   Add contr profit @14% on Labour                    0%                61.20                 0.00
                   Rate per Each                                                                            259.20
                   Note : Labour is Considered for 10 jobs /
                   day
              34    Labour Charges
  12                Labour charges for Fixing of Ceiling fan and regulator including transportation and giving
                    connections with twin core wire etc., complete.
                   a) Material
        elec-1.6.8 23/0060 Twin Core wire                             M        1        10.40                10.40
                   Unforseen item works, such as painting to          LS       1        3.00                  3.00
                   down rod, screws etc.,
                                                                                                             13.40
                   Add contr profit @14% on material                 0.00                                     0.00
                   Total for material                                                                        13.40
                   b) Labour charges.
       elec-8.1.77 Skilled Electrician                                day    0.125     515.00                64.38
       elec-8.1.85 Helper                                             day    0.125     400.00                50.00
                   Add area allowence on labour charges @             0%                                      0.00
               DOOR SIZE 4.00 x 2.13 mtrs : Area = 8.52 Sqm                            4.00       X    2.13      8.52
               Medium teak Wood Frame
               Verticals      2 x 2 x 2.13 x 0.150 x 0.125     = 0.15975              0.15975   cum
               Horizental     2 x 4.00 x 0.150 x 0.125         = 0.15000              0.15000   cum
               Total qnty for Scantlings upto 3.00 mtrs & above 2.00 mtrs            0.30975 cum
               Medium teak Wood Shutters
               Styles                  2 x 4 x 1.90 x 0.125 x 0.040                    0.076    cum
               Bottom rails           1 x 2 x 800mm x 250mm x 40mm                     0.016    cum
               Top & Middle rails     2 x 3 x 800mm x 200mm x 40mm                    0.0384    cum
               Rails for Glazed Shutters (Side Windows )
               Bottom 1x2 x 1000mm x 250mm x 40mm                                      0.020    cum
               Top 1x2 x 1000mm x 200mm x 40mm                                         0.016    cum
               Total qnty for Scantlings upto 2.00 mtrs                              0.16640 cum
               Cost of 5mm thick pin headed glass panels 2No 800mm X 1500mm            2.400    Sqm
               Cost 10mmX10mm MS rods for safty in Glazed portion @ 100mm X
               100mm grid
               Verticals =   (750/100)-1 = 6 Nos @ 1.80 x 2      = 21.60 Rm
                         Horizantals = (1450/100) - 1 = 13 Nos @ 800 x 2 =
                                                                                       33.28    Kgs
               20.80 Rm
                  Total    = 42.40 Rmt @ 0.785Kg/Rmt = 33.28 Kgs
                                              Data
               Material
     0.30975 Cost of Medium Teak Wood scantlings: up to 2.0 M (BMT-E.01)             67804.00     1    Cum     21002.29
0.16640 Cost of Medium Teak Wood scantlings: 2.0 to 3.0 M (BMT-E.02) 75339.00 1 Cum 12536.41
0.036 Cost of Medium Teak Wood Plancks: any thickness (BMT-E.04) 135610.00 1 Cum 4881.96
2.400 Cost of Plain Float Glass 5 mm thick ( BMT-I.02 ) 474.00 1 Sqm 1137.60
       6.00    Cost of MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA (BMS        30.00      1    Each       180.00
               W.69)
2.00 Cost of Brass Aldrop (IS:2681) 350 mm long (BMT-G.38) 2094.00 1 Each 4188.00
       3.00    Cost of Brass Tower Bolt-10 mm Bolt (IS:204) 250 mm Long (BMT          365.00      1    Each     1095.00
               G.04)
2.00 Cost of Brass fancy handles 150 mm (BMT-G.58) 284.00 1 Each 568.00
6.00 Cost of Brass Butt hinges (IS:205)- 150 mm Long (BMT-G22) 324.00 1 Each 1944.00
1.00 Cost of Flat latch Aluminium 300long (BMT-G.50) 159.00 1 Each 159.00
2   Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of
    sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on
    both faces of 35mm thick including cost of fixtures such as Aluminium Tower Bolts 250mm long 2 Nos, Aluminium
    Handles 150mm long 2 Nos, 300mm long Aluminium Aldrops 1No, 125 mm long M.S.Powder Coated butt hinges
    6Nos, 300 mm long Aluminium Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos 300mm long including
    cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in
    position , with Hardware fixtures etc., complete for finsihed item of work.
              DOOR SIZE 1.22 x 2.13 mtrs : Area = 2.6 Sqm                             1.22      X    2.13      2.60
              Medium teak Wood Frame
              Verticals 2 x 2.13 x 0.075 x 0.10       = 0.0319                      0.03195   cum
              Horizental 1 x 1.22 x 0.075 x 0.10      = 0.00864                     0.00915   cum
                                      Total        = 0.04110                        0.04110   cum
              Flush door shutters, solid bond wood block board type with
              commercial ply on both faces.: 35 mmthick
              conforming to IS:2202 (BMT-N.17 )
      6.00    Cost of MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA (BMS       30.00      1    Each       180.00
              W.69)
                                                                                                              8589.24
                                    Add Overheads & Contractors Profit @13.615% 13.615%                       1169.43
              Rate per / Each                                                                                 9758.70
              WINDOW SIZE 1.52 x 1.22 mtrs : Area = 1.85 Sqm                        1.52      X     1.22     1.85
              Sal Wood Frame
              Verticals 4 x 1.22 x 0.075 x 0.10          =                         0.03660   cum
              Horizental 2 x 1.52 x 0.075 x 0.10         =                         0.02280   cum
              Styles and rails
              Vertical 2 x8 x0.54 x0.075 x0.03 =                                   0.01944   cum
              Horizontal 2 x8 x0.33 x0.075 x0.03 =                                 0.01188   cum
                                         Total       =                             0.09072   cum
              12 mm thick Bison Panel
                                       1x8 x 0.2 x 0.42 = 2.45 Sqm                  0.67     sqm
              Grill
              12mm Square bars @ 125mm c/c                                          10.74    kgs
                                                 ABSTRACT
              a)MATERIAL
    0.09072 Cost of Sal wood scantling                                            67804.00    1    Cum       6151.18
      0.67    Cost 12mm thick Bison Panel                                          332.00     1     Sqm       222.44
     10.74    (BMT-K.103)
              Cost of 12 mm Square bars                                             35.61     1      Kg       382.49
      4.00    MS Hold Fasts                                                         30.00     1    Each       120.00
      8.00    Cost of 100 long Aluminium Towerbolts                                 57.00     1    Each       456.00
      8.00    Cost of 100mm Long AluminiumHandles                                   51.00     1    Each       408.00
     16.00    Cost of 75mm long M.S.Powder Coated but hinges                        8.00      1    Each       128.00
      8.00    Cost of Window Stays                                                  20.00     1    Each       160.00
              a) LABOUR
      0.48    Carpenter class I                                                    600.00     1     day       289.03
      1.12    Carpenter class II                                                   504.00     1     day       566.51
      0.80    Light mazdoor                                                        444.00     1     day       354.46
     10.74    Fabrication and Fixing Charges                                        12.00     1      Kg       128.88
                                                                                                             9366.99
                                    Add Overheads & Contractors Profit @13.615% 13.615%                      1275.32
              Rate per / Each
4   Supply and Fixing of Ventilator of size 1.20 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm
    square rods @ 150mm c/c fixing in position ,complete for finsihed item of work
              VENTILATOR SIZE 1.20 x 0.45 mtrs : Area = 0.54                         1.2      X     0.45     0.54
              Angular frame 25 x 25 x 3mm thick
              Verticals 1 x 2 x 0.45        =                                       0.90      m
              Horizental 1 x2 x 1.20       =                                        2.40      m
              For Hold fasts 1 x 2 x 0.15 =                                         0.30
                                         Total       =                              3.60      m     3.96      Kgs
              10 mm square rods @ 150 mm c/c
              Verticals 1 x 7 x 0.45        =                                       3.15
              Horizental 1 x2 x 1.20       =                                        2.40
              total                                                                 5.55      m    4.3568     Kgs
                                                 ABSTRACT
              a)MATERIAL
      8.32    Cost of Structural Steel                                              35.61     1    Cum        296.19
              a) LABOUR
      8.32    Fabrication Charges                                                   24.00     1      Kg       199.60
      8.32    Fixing Charges                                                        4.00      1      Kg        33.27
5   Supply and Fixing of Ventilator of size 0.90 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm
    square rods @ 150mm c/c fixing in position ,complete for finsihed item of work
             VENTILATOR SIZE 0.90 x 0.45 mtrs : Area = 0.41                        0.9     X    0.45    0.41
             Angular frame 25 x 25 x 3mm thick
             Verticals 1 x 2 x 0.45          =                                    0.90     m
             Horizental 1 x2 x 0.90       =                                       1.80     m
             For Hold fasts 1 x 2 x 0.15 =                                        0.30
                                        Total        =                            3.00     m    3.3      Kgs
             10 mm square rods @ 150 mm c/c
             Verticals 1 x 5 x 0.45          =                                    2.25
             Horizental 1 x2 x 0.90       =                                       1.80
             total                                                                4.05     m   3.1793    Kgs
                                                 ABSTRACT
             a)MATERIAL
      6.48   Cost of Structural Steel                                             35.61    1   Cum       230.75
             a) LABOUR
      6.48   Fabrication Charges                                                  24.00    1    Kg       155.50
      6.48   Fixing Charges                                                       4.00     1    Kg        25.92
                                                                                                         412.17
                                     Add Overheads & Contractors Profit @13.615% 13.615%                  56.12
             Rate per / Each                                                                             468.30
6   Supply and Fixing of Ventilator of size 0.76 x 0.3 with 25mm x 25mm x 3mm thick equal L angles and 10mm
    square rods @ 150mm c/c fixing in position ,complete for finsihed item of work
             VENTILATOR SIZE 0.76 x 0.3 mtrs : Area = 0.23                        0.76     X    0.3     0.23
             Angular frame 25 x 25 x 3mm thick
             Verticals 1 x 2 x 0.3       =                                        0.60     m
             Horizental 1 x2 x 0.76       =                                       1.52     m
             For Hold fasts 1 x 2 x 0.15 =                                        0.30
                                        Total        =                            2.42     m   2.662     Kgs
               DOOR SIZE 1.52 x 2.13 mtrs : Area = 3.24 Sqm                            1.52      X     2.13      3.24
               medium teak wood for Frame
               Verticals 2 x 2.13 x 0.075 x 0.10        = 0.03195                    0.03195    cum
               Horizental 1 x 1.52 x 0.075 x 0.10       = 0.01140                    0.01140    cum
                                      Total         = 0.04335                        0.04335    cum
               Flush door shutters, solid bond wood block board type with
               commercial ply on both faces.: 35 mmthick
               conforming to IS:2202 (BMT-N.17 )
                                                                                                                9988.36
                                    Add Overheads & Contractors Profit @13.615% 13.615%                         1359.92
                                         Rate per / Each                                                       11348.30
8    Supply and Fixing of Door with Double leaf shutter, Door Size 1.00x2.13 mtrs with medium teak wood Frame of
     sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
     both faces of 35mm thick including cost of fixtures such as Alluminium Tower Bolts 250mm long 2 Nos,
     Alluminimum Handles 150mm long 2 Nos, 300mm long Alluminium Aldrops 1No, 125mm long M.S.Powder Coated
     butt hinges 6Nos, 300 mm long Alluminium Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos including
     cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in
     position , with Hardware fixtures etc., complete for finsihed utem of work.
               DOOR SIZE 1.00 x 2.13 mtrs : Area = 2.13 Sqm                            1.00      X     2.13      2.13
               medium teak wood for Frame
               Verticals 2 x 2.13 x 0.075 x 0.10        =                            0.03195    cum
               Horizental 1 x 1.00 x 0.075 x 0.10       =                            0.00750    cum
                                      Total         =                                0.03945    cum
2    0.03195 Cost of medium Teak wood scantling of size up to 2.0 M                  75339.00     1    Cum      2407.08
                ( BMT-E.2)
3     1.8172   Flush door shutters, solid bond wood block board type with             1260.00     1    Sqm      2289.67
               commercial ply on both faces.: 35 mmthick
               conforming to IS:2202 (BMT-N.17 )
4      6.00    MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA (BMS-W.69)          30.00      1    Each       180.00
5      1.00    Cost of 300mm Long Aluminium Aldrops(BMT-G.42)                         360.00      1    Each       360.00
6      2.00    Cost of 250 long Aluminium Towerbolts (BMT-G.10)                       144.00      1    Each       288.00
7      2.00    Cost of 150mm Long Aluminium Handles (BMT-G.34)                        119.00      1    Each       238.00
8      6.00    Cost of 125mm long M.S. Powder Coated but hinges (BMT-G.29)             29.00      1    Each       174.00
9      1.00    Cost of Flat latch Aluminium 300long (BMT-G.50)                        159.00      1    Each       159.00
10     2.00    Cost of MS-Powder Coated - Door Stoppers ( BMT - G.53)                  42.00      1    Each        84.00
               a) LABOUR
       0.21    Carpenter class I                                                      600.00      1     day       125.69
       0.49    Carpenter class II                                                     504.00      1     day       246.35
       0.35    Light mazdoor                                                          444.00      1     day       154.14
       1.82    Labour charges for fixing Flush door shutters of any                   348.00      1    Sqm        632.39
               thickness to the existing door frame including fixing the
               fixtures to the door shutter excluding cost of shutter (BMM-V.23)
                                                                                                                7846.85
                                    Add Overheads & Contractors Profit @13.615% 13.615%                         1068.35
                                         Rate per / Each                                                        8915.20
9    Supply and Fixing of Door with Single leaf shutter, Door Size 0.90x2.13 mtrs with medium teak wood Frame of
     sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
     both faces of 35mm thick including cost of fixtures such as Alluminium Tower Bolts 250mm long 2 Nos,
     Alluminium Handels 150mm long 1 No, 300mm long Alluminium Aldrops 1No, 125mm long M.S.Powder Coated
     butt hinges 3 Nos, 300 mm long Alluminium Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos including
     cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in
     position , with Hardware fixtures etc., complete for finsihed utem of work. D6
                                                                                                                7205.93
                                    Add Overheads & Contractors Profit @13.615% 13.6150%                          981.09
                                         Rate per / Each                                                        8187.05
10 Supply and Fixing of Door with Single leaf shutter, Door Size 0.76x2.13 mtrs with medium teak wood Frame of
   sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
   both faces of 35mm thick including cost of fixtures such as Alluminium Tower Bolts 250mm long 1 Nos,
   Alluminium Handels 150mm long 1 No, 300mm long Alluminium Aldrops 1No, 125mm long M.S.Powder Coated
   butt hinges 3 Nos, 250 mm long M.S.Powder Coated Flat latch 1No, Door stoppers 1 Nos, MS Hold fasts 6Nos,
   Fixing in position of M.S.Powder Coated Sheet 24 guage of full width of shutter to a height of 0.60 mtrs for interior
   face and 0.15 mtrs to external face , Sales and Other Taxes cost and convenyance of all materials to site all Labour
   charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complte for
   finsihed item of work.
4     6.00    MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA (BMS-W.69)           30.00      1    Each       180.00
5     1.00    Cost of 300mm Long Aluminium Aldrops(BMT-G.42)                          360.00      1    Each       360.00
6     1.00    Cost of 250 long Aluminium Towerbolts (BMT-G.10)                        144.00      1    Each       144.00
7     2.00    Cost of 150mm Long Aluminium Handles (BMT-G.34)                         119.00      1    Each       238.00
8     3.00    Cost of 125mm long M.S. Powder Coated but hinges (BMT-G.29)              29.00      1    Each        87.00
9     1.00    Cost of MS-Powder Coated Flat Latches: 250 mm long ( BMT-G.51)           49.00      1    Each        49.00
10    0.48    Cost of MS-Powder Coated - Door Stoppers ( BMT - G.53)                   42.00      1    Sqm         20.16
11            a) LABOUR
      0.20    Carpenter class I                                                       600.00      1     day       119.95
      0.47    Carpenter class II                                                      504.00      1     day       235.11
      0.33    Light mazdoor                                                           444.00      1     day       147.11
                                                                                                          6465.82
                                   Add Overheads & Contractors Profit @13.615% 13.615%                     880.32
                                        Rate per / Each                                                   7346.15
11 Supply and Fixing of Door with Double leaf shutter, Door Size 1.05x2.13 mtrs with medium teak wood Frame of
   sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on
   both faces of 35mm thick including cost of fixtures such as Alluminium Tower Bolts 250mm long 2 Nos,
   Alluminium Handles 150mm long 2 Nos, 300mm long Alluminium Aldrops 1No, 125mm long M.S.Powder Coated
   butt hinges 6Nos, 300 mm long Alluminium Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos including cost
   and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in
   position , with Hardware fixtures etc., complete for finsihed utem of work.
4     6.00    MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA (BMS-W.69)       30.00      1    Each    180.00
5     1.00    Cost of 300mm Long Aluminium Aldrops(BMT-G.42)                       360.00     1    Each    360.00
6     2.00    Cost of 250 long Aluminium Towerbolts (BMT-G.10)                     144.00     1    Each    288.00
7     2.00    Cost of 150mm Long Aluminium Handles (BMT-G.34)                      119.00     1    Each    238.00
8     6.00    Cost of 125mm long M.S. Powder Coated but hinges (BMT-G.29)          29.00      1    Each    174.00
9     1.00    Cost of Flat latch Aluminium 300long (BMT-G.50)                      159.00     1    Each    159.00
10    2.00    Cost of MS-Powder Coated - Door Stoppers ( BMT - G.53)               42.00      1    Each     84.00
              a) LABOUR
      0.21    Carpenter class I                                                    600.00     1    day     126.88
      0.49    Carpenter class II                                                   504.00     1    day     248.69
      0.35    Light mazdoor                                                        444.00     1    day     155.60
      1.92    Labour charges for fixing Flush door shutters of any                 348.00     1    Sqm     668.32
              thickness to the existing door frame including fixing the
              fixtures to the door shutter excluding cost of shutter (BMM-V.23)
                                                                                                          8043.30
                                   Add Overheads & Contractors Profit @13.615% 13.615%                    1095.10
              Rate per / Each                                                                             9138.40
      1 rmt   cost of rajasri door frame (BMT-N.01) Item Sl No 643                   275.00      1    Rmt        275.00
                                    Add Overheads & Contractors Profit @13.615% 13.615%                           37.44
                                          Rate per Rmt                                                           312.45
13 Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19
   gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall
   have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat
   moulded PVC ‘C’ channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock
   rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail
   & bottom rail. Panelling of 10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails
   with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive
   etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ‘C’ Channel using
   PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer’s specification & drawing for
   finished item of work .
              Pre-painted windows
14 Providing and fixing of Openable Windows made of pre-painted steel (Base steel as per IS 513 of 0.58 mm thick
   galvanized as per IS 277 with Zinc of 120 GSM), primer coated with epoxy primer of 5-7 microns thick, finish
   painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and
   section for outer frame of 48 x 50 mm, centre mullion of 48 x 50 mm, section for shutter of 48 x 25 mm and the
   fixed glass beading section should be 12 x 12 mm and the outer frame and mullions to have rebate for glazed
   shutter with a 20 mm provision for guard bars/grills and the sections cut to length metre joined with corner
   bracket, centre mullion fixed with mullion cap, handle, stay, 2 nos. of stainless steel heavy duty pivot hinges
   provided per shutter and windows fitted with 5 mm thick plain float glass with rubber gaskets including fixing the
   frames in concrete/masonry wall by means of self expanding screws, Including 10mm Square guard bars with 6”
   (152.4mm) pitch etc., complete for finished item of work.
              basic rate as per ssr item code BMT-P.19 / BMT-P.20                    4914.00     1    SQM      4914.00
                                    Add Overheads & Contractors Profit @13.615% 13.615%                          669.04
                                         Rate per sqmt.                                                        5583.05
              basic rate as per ssr item no 746 item code BMT-P.17/BMT-P.18                                    5576.00
                                    Add Overheads & Contractors Profit @13.615% 13.615%                          759.17
              Rate per sqmt.                                                                                   6335.20
               basic rate as per ssr item code BMT-P.24                                6625      1    SQM       6625.00
                                    Add Overheads & Contractors Profit @13.615% 13.615%                            901.99
               Rate per sqmt.                                                                                   7527.00
        b)     Double shutter Window with vertical mullion 3’0” x 4’0” (914.4mm x
               1219.2mm) / ( 4’0”x4’0” 1219.2mm x 1219.2mm) outer frame
               section size of 72x50mm shutter frame section size of 47x20mm.
               Mullion section size of 72x50mm.
               basic rate as per ssr item no 761 & 762 item code BMT-P.22/BMT-P.23                            7288.00
                                      Add Overheads & Contractors Profit @13.615% 13.615%                       992.26
                                         Rate per sqmt.                                                         8280.30
16 Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (base steel as per IS 513
   of 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns
   thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd
   backer with total coated thickness of 0.6mm. Section for louvered ventilator frame should be of 33x57mm. All the
   above closed and seamed sections should be made out of single sheet and with stitch at a single place as per
   enclosed drawings; The ventilators should be paneled with 4 mm pinhead glass with Ethyl propylene Diamine
   monomer Gasket (EPDM). The sections are to be cut to length mitre joined with corner bracket. Gaskets are to be
   made of Ethyl propylene Diamine monomer(EPDM). Corner brackets made of CRCA with Zinc Phosphate. The above
   frames should be fixed to the concrete /masonry wall by means of self expanding brackets & screws including 10
   mm square guard bars with 6" pitch and all taxes complete for finished item of work.
1      Supply and Fixing of 18guage MS Plain sheet Door of size 1.22 x 2.13 mts with
      outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter
      angular frame rolled steel equal angle 32 x 32 x 4 mm with Double leaf shutter,MS
      Flats 25x5mm-6Nos for Horizontal ( 3 Nos for each shutter )to the Door MS Aldrop
      300 mm long-2No , MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-
      6Nos. MS 125mm Handles- 2 No and 6 Nos of MS Hold fasts 230mm long with
      primary coat of Red oxide paint including cost,conveyance of all materials to site
      ,sales and other taxes on all materials and labour charges etc complete.
            DATA
54.93 Kg   Cost of Angular                                     0.00       1 Kg                     0.00
3.23 Kg    Cost of Flats (C)                                   0.00       1 Kg                     0.00
24.05 Kg   Cost of 18 Gauge MS Sheet                           0.00       1 Kg                     0.00
82.22 Kg   Fabrication Charges BMM-V.14                       24.00       1 Kg               1973.21
82.22 Kg   Fixing Charges BMM-V.15                             4.00       1 Kg                328.87
 2 No.     MS Aldrop 300mm long (BMT-G.45)                    181.00     1 No.                362.00
 2 Nos.    MS Tower Blt 150mm long ( BMT-G.15)                38.00      1 No.                    76.00
 6 Nos.    MS Hinges 150mm long (BMT-G.30)                    44.00      1 No.                264.00
 2 Nos.    MS Handle 125mm long (BMT-G.35)                    34.00      1 No.                    68.00
5.20 sqm   Cost of Red Oxide Painting                          0.00      1 sqm                    0.00
                                                                       Total                 3072.08
                        Add Overheads & Contractors Profit @13.615%               13.615%     153.60
                                               Rate of Door                                  3225.68
                                                                                    Say      3225.70
   2        Supply and Fixing of 18guage MS Plain sheet Door of size 1.00 x 2.13 mts with
           outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter
           angular frame rolled steel equal angle 35 x 35 x 5 mm with Double leaf shutter,MS
           Flats 25x5mm-6Nos for Horizontal to the Door MS Aldrop 300 mm long-2No MS
           Tower bolt 150mm long-2Nos,MS Hinges 150mm long-6Nos. MS 125mm Handle- 2
           No and 6 Nos of MS Hold fasts 230mm long with primary coat of Red oxide paint
           including cost,conveyance of all materials to site ,sales and other taxes on all
           materials and labour charges etc complete
            DATA
53.42 Kg   Cost of Angular                                  0.00       1 Kg                           0.00
2.82 Kg    Cost of Flats (C)                                0.00       1 Kg                           0.00
19.80 Kg   Cost of 18 Gauge MS Sheet                        0.00       1 Kg                           0.00
 76.03 Kg Fabrication Charges BMM-V.14                     24.00       1 Kg                    1824.83
 76.03 Kg Fixing Charges BMM-V.15                           4.00       1 Kg                         304.14
 2 No.     MS Aldrop 300mm long (BMT-G.45)                 181.00     1 No.                         362.00
   2 Nos. MS Tower Blt 150mm long ( BMT-G.15)              38.00      1 No.                          76.00
   6 Nos. MS Hinges 150mm long (BMT-G.30)                  44.00      1 No.                         264.00
   2 Nos. MS Handle 125mm long (BMT-G.35)                  34.00      1 No.                          68.00
4.26 sqm Cost of Red Oxide Painting                         0.00      1 sqm                          0.00
                                                                    Total                      2898.96
                      Add Overheads & Contractors Profit @13.615%                 13.615%           144.95
                                            Rate of Door                                       3043.91
                                                                                    Say        3043.95
Total ( A to C )
Total ( A to C )
Total (D)
                       DATA
65.94 Kg   Cost of angle ( A to C)                          0.00       1 Kg
 2.76 Kg   Cost of Flats (D)                               0.00        1 Kg
16.65 Kg   Cost of 18 Gauge MS Sheet (E)                   0.00        1 Kg
85.35 Kg   Fabrication Charges BMM-V.14                    24.00       1 Kg
85.35 Kg   Fixing Charges BMM-V.15                          4.00       1 Kg
3.71 sqm   Cost of Red Oxide Painting                       0.00       1 sqm
 6 Nos.    MS Tower Bolts 100mm long (BMT-G.14)            26.00       1 No.
12 Nos.    MS Butt Hinges 100mm long (BMT-G.28)            23.00       1 No.
 6 Nos.    MS Handle 125mm long (BMT-G.35)                 34.00       1 No.
 6 Nos.    MS Wind appliances                              20.00       1 No.
                                                                   Total
               Add Overheads & Contractors Profit @13.615%                     13.615%
                                                        Rate of Door
                                                                                 Say
   2       Supply and Fixing of M.S. Iron Grill Gate of size 35 mm x 35mm x 6mmwith
           10mm Square rods 100mm including Cost and conveyance of all materials,
           welding, fabrication of charges and sales and other taxes etc., complete for
           finished item of work.
   1.05 Kg 10mm Square Safety Rods                         44.05       1 Kg
   3.05 Kg Fabrication Charges BMM-V.14                    24.00       1 Kg
   3.05 Kg Fixing Charges BMM-V.15                          4.00       1 Kg
                                                                       Total
                                                 Say
Executive Engineer          Dy. Executive Engineer     Assistant Executive Engineer
Irrigation Division   Irrigatin Sub Division         Irrigation Section
esources Department
ct
52 M x 1.22 M (Six Leafs
040 of Size 40mm x
l angle ISA 2525 of size
6mm and 25x5mm flat ,
 s M.S. Powder coated
2 Nos., M.S. Powder
 are rods at 10 Nos
ts of 230mm long
d conveynace of all
1.85
36.26 Kg
17.98 Kg
             11.70 Kg
             65.94 Kg
             0.00 Kg
             65.94 Kg
             2.76 Kg
             0.00 Kg
             2.76 Kg
            16.65 Kg
             0.00 Kg
            16.65 Kg
               0.00
               0.00
               0.00
             2048.44
             341.41
               0.00
             156.00
             276.00
             204.00
             120.00
             3145.85
             428.31
             3574.16
             3574.20
5mm x 6mmwith
of all materials,
., complete for
                    46.25
                    73.20
                    12.20
                131.65
                131.65
                    17.92
                149.58
 Assistant Executive Engineer
rrigation Section
                                    DATAS FOR MS Ventilators
Name of the work : Construction of Toilets to primisess of Water Resources Department Division
                           Office at Madanapalli in Chittoor District
  1     Supply and Fixing of Ventilator of size 1.22 x 0.30 with 25mm x 25mm x 3mm thick equal L
        angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
        work
                                          Add overheads @    5%
                 Rate per / Each
  2     Supply and Fixing of Ventilator of size 1.52 x 0.30 with 25mm x 25mm x 3mm thick equal L
        angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
        work
                 VENTILATOR SIZE 1.50 x 0.30                1.52         X         0.3
                 mtrs : Area
                 Angular     = 0.46
                         frame 25 x sqm
                                    25 x 3mm thick
                 Verticals 1 x 2 x 0.294        =           0.59         m
                 Horizental 1 x2 x 1.50     =               3.00         m
                 For Hold fasts 1 x 2 x 0.15 =              0.30
                                         Total              3.89         m        4.2768
                 =
                 10 mm square rods @ 150 mm c/c
                 Verticals 1 x 9 x 0.294        =           2.65
                 Horizental 1 x 2 x 1.494           =       2.99
             total                                      5.63         m       4.39452
                           ABSTRACT
             a)MATERIAL
      8.67   Cost of Structural Steel                   0.00         1         Cum
             a) LABOUR
      8.67   Fabrication Charges ( BMM-V.14)            24.00        1          Kg
      8.67   Fixing Charges ( BNN-V.15)                 4.00         1          Kg
                                      Add overheads @    5%
             Rate per / Each
5   Supply and Fixing of Ventilator of size 1.00 x 0.3 with 25mm x 25mm x 3mm thick equal L
    angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
    work
                                      Add overheads @    5%
             Rate per / Each
3   Supply and Fixing of Ventilator of size 1.20 x 1.20 with 25mm x 25mm x 5mm thick equal L
    angles and 10mm square rods @ 150mm c/c fixing in position ,complete for finsihed item of
    work
                                    Add overheads @         5%
             Rate per / Each
12           Supply and fixing of MS grill Window of .9X 1.35 mts by using 40 x40 x
             6mm MS Angle section for outer frame and 10 mm square safety bars @
             100 mm C/C both ways including cost & conveyance of all materials and
             labour charges for finished item of work
                                                                              Say
9   Supply and fixing of MS grill Window of 1.5X 1.35 mts by using 40 x40 x
    6mm MS Angle section for outer frame and 10 mm square safety bars @
    100 mm C/C both ways including cost & conveyance of all materials and
    labour charges for finished item of work
Say
9   Supply and fixing of MS grill Window of 1.2X 1.35 mts by using 40 x40 x
    6mm MS Angle section for outer frame and 10 mm square safety bars @
    100 mm C/C both ways including cost & conveyance of all materials and
    labour charges for finished item of work
9   Supply and fixing of MS grill Window of 2.1 x1.35 mts by using 40 x40 x
    6mm
    FrameMS   Angle mm
           40x40x6   section
                          (GW)for outer frame and 10 mm square safety bars @
    100 mm C/C both ways including cost & conveyance of all materials and
    Verticals  2 x 1.35
    labour charges  for finished item of work 2.7
    Harizontal 2 x 2.1                         4.2
                                            6.9        3.5         24.15
    10 mm SQ rod@ 100c/c
    Verticals 20 x 1.32                     15.84
    Harizontal 12x 2.07                     43.47
                                            59.31      0.78        46.2618
    MS Aldrop,Tower Bolt and Holdfast                              0.55
    total weight                                                   70.9618
    Rate analysis
    cost of MS steel                        70.96      33.57
    Fabrication charges BMM -V-14           70.96      24.00
    Fixing Charges BMM -V-15                70.96      Err:520
    Over Head Charges                       Err:520    0.13615
                                                                   Say
epartment Division
Amount
mm thick equal L
r finsihed item of
0.37
Kgs
Kgs
0.00
                170.03
                 28.34
                198.37
                     9.92
               208.30
mm thick equal L
r finsihed item of
0.46
               Kgs
                Kgs
0.00
                208.11
                 34.69
                242.80
                 12.14
               254.95
m thick equal L
r finsihed item of
0.3
Kgs
Kgs
0.00
                146.48
                 24.41
                170.89
                     8.54
               179.45
mm thick equal L
r finsihed item of
               1.44
 Kgs
Kgs
814.74
 549.79
  91.63
1456.16
  72.81
1529.00
1106.49
 791.06
Err:520
Err:520
Err:520
Err:520
1633.33
1167.71
Err:520
Err:520
Err:520
Err:520
1374.95
 982.98
Err:520
Err:520
Err:520
Err:520
2382.19
1703.08
Err:520
Err:520
Err:520
Err:520
                                     Statement showing the Seignoirage Charges
   Name of the work : Construction of Toilets to primisess of Water Resources Department Division Office at Madanapalli in
                                                        Chittoor District
                                                                                                                        Total
            Check     Total                                                                                             Seigniorage
            Dam      Quantity         Sand Quantity for Seigniorage            Metal Quantity for Seigniorage           Charges
C.C - M-5 Cum        6.00 Cum        2.70 Cum            50.00        135.00   5.40 Cum            75.00     405.00            540.00
C.C - M-
15       Cum         1.25 Cum        0.56 Cum            50.00         28.22   1.00 Cum            75.00        75.24          103.46
C.C - M-
20
(Wearing
coat)    Cum         0.15 Cum        0.07 Cum            50.00          3.38   0.12 Cum            75.00         9.00           12.38
C.C - M-
20
(Wearing
coat)    cum         1.50 Cum        0.68 Cum            50.00         33.75   1.20 Cum            75.00        90.00          123.75
                                                                                                                               779.58
                                     Electrical DATAS 2017-18
25   1.4.2 (c)   102   Supply and Fixing of 20 mm outer dia 2.10 mm thick Heavy grade
                       with IS:9537 part 3 FRLS regid PVC pipe (ISI MARK) concealed in
                       Roof Slabs with all required MS deep boxes and all accessories
                       including and labour charges etc., complete.
                       Makes:- VIP / Besto plast / GoldMedal / Million plast / GM /
                       Sudhakar / Polyline
27    2.1.2      210   Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR /
                       ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990
                       specification flexible copper cable (ISI MARK) in existing pipe with
                       6A Modular switch, Ceiling rose/BH/SBH Modular switches with
                       cover plate including all labour charges etc., complete for Light, Fan,
                       Exhaust Fan etc., complete. (for Residential Building)
                       Makes of wires:- Finolex / RR kabel / Havells / APAR E-beam / KEI /
                       Polycab / Bonton / V-Guard / GM / Million / HPL / Goldmedal /
                       Finecab / Vimal / Fortune Art / Gloster / Kundan cab/Sudhakar
26   3.1.4   205   Supply and run of 2 of 2.5 sq.mm (phase neutral and earth) FRLS /
                   HFFR / ZHFR P.V.C. insulated 1100V grade as per IS : 694 / 1990
                   specification flexible copper cable in existing MS conduit pipe for
                   individual ligting circuits including labour charges etc., complete as
                   required for switch boards.
                   Makes of wires:- Finolex / RR kabel / Havells / APAR E-beam / KEI /
                   Polycab / Bonton / V-Guard / GM / Million / HPL / Goldmedal /
                   Finecab / Vimal / Fortune Art / Gloster / Kundan cab/Sudhakar