0% found this document useful (0 votes)
102 views1 page

7-Point Container Inspection Check List: 5. Front Wall 6. Ceiling/Roof

A 7-point container inspection is required for all containers used for Jasco Shipments. The inspection checks the integrity of the container structure and doors before stuffing. Any containers with damage or tampering must be reported to the carrier and not used. Inspectors must follow the C-TPAT Container & Seal Inspection Instructions to ensure container integrity is maintained.

Uploaded by

rgrao85
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views1 page

7-Point Container Inspection Check List: 5. Front Wall 6. Ceiling/Roof

A 7-point container inspection is required for all containers used for Jasco Shipments. The inspection checks the integrity of the container structure and doors before stuffing. Any containers with damage or tampering must be reported to the carrier and not used. Inspectors must follow the C-TPAT Container & Seal Inspection Instructions to ensure container integrity is maintained.

Uploaded by

rgrao85
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Form #200-007B

7-Point Container Inspection Check List


Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability
of the locking mechanisms of the doors. A 7-point container inspection is required for all containers. Containers that have
damage or appear to have been tampered with are not to be used for Jasco Shipments and should be reported to the
carrier immediately. The guidelines of the C-TPAT Container & Seal Inspection Instructions (under separate attachment)
should be followed at all times to insure the integrity of the container.

DATE: CONTAINER NO:

INSPECTOR’S NAME:

6. Ceiling/Roof 5. Front Wall

4. Left Side

3. Right Side
2. Inside/Outside Doors

1. Outside/Undercarriage
7. Floor (Inside)

SIDES SATISFACTORY REMARKS

1. Outside/Undercarriage Yes No
(Before Entering Facility)

Yes No
2. Inside/Outside Doors

Yes No
3. Right Side

Yes No
4. Left Side

Yes No
5. Front Wall

Yes No
6. Ceiling/Roof

Yes No
7. Floor (Inside)

Printed Name Signature

Rev 3/14/11 Date

You might also like