CONSTRUCTION OF VIP/MEDIA LOUNGE
& COMMAND CENTER
BILL OF QUANTITIES
BILL OF QUANTITIES
Project Name: CONSTRUCTION OF VIP/MEDIA LOUNGE AND COMMAND CENTER
Location: Clark Civil Aviation Complex
SUMMARY
ITEM NO. DESCRIPTION BID AMOUNT in Php
B.5 Project Signboard
100(1) Clearing & Grubbing
404 Reinforcing Steel, Grade 40
103 Structural Excavation
1000(a) Soil Poisoning
804(b) Gravel Bedding
405-a Structural Concrete 4000psi @ 7 days
405-b Structural Concrete 4000psi @ 28 days
405-c Structural Concrete 3000psi @ 7 days
104 Embankment
1046-a Masonry Works (CHB #4)
1046-b Masonry Works (CHB #6)
1002 Plumbing & Sanitary
1027 Cement Plaster Finish
1018(1-2) a Tileworks (Granite 600x600)
1018(1-2) b Tileworks (Granite Slab 19mm thk.)
1018(1-2) c Tileworks (Carpet Tile)
1018(1-2) d Tileworks (Vinyl Plank)
1032 Painting Works (3 coats)
1008(1) Windows
1010(a) Doors, Frames & Accessories
401(1) Metal Railing/Metalworks
1003 Carpentry/Ceiling
1013 Banawe Roofing
101 Demolition of Existing Structure
1100/1/2 Mechanical Works
SPL-1 Electrical Works
TOTAL BID AMOUNT
TOTAL BID AMOUNT:
in Figures:
in Words:
Name and Signature of Bidder :
Name of Company and Official Stamp of Bidder :
Date :
Official Stamp
BILL OF QUANTITIES
Project Name : Construction of VIP/Media Lounge and Command Center
Location : Clark Civil Aviation Complex
UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)
B.5 Project Signboard lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
100(1) Clearing & Grubbing ha. 0.08
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per hectare)
404 Reinforcing Steel, Grade 40 kg. 38,300.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per kilogram)
103 Structural Excavation cu.m. 700.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)
1000(a) Soil Poisoning sq.m. 800.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
804(b) Gravel Bedding cu.m. 200.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)
405-a Structural Concrete 4000psi @ 7 days cu.m. 103.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)
405-b Structural Concrete 4000psi @ 28 days cu.m. 165.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)
Sub-Total for this Page Php
BILL OF QUANTITIES
Project Name : Construction of VIP/Media Lounge and Command Center
Location : Clark Civil Aviation Complex
UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)
405-c Structural Concrete 3000psi @ 28 days cu.m. 82.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)
104 Embankment cu.m. 1,000.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per cubic meter)
1046-a Masonry Works (CHB #4) sq.m. 1,700.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
1046-b Masonry Works (CHB #6) sq.m. 2,000.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
1002 Plumbing & Sanitary lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
1027 Cement Plaster Finish sq.m. 3,200.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
1018(1-2) a Tileworks (Granite 600x600) sq.m. 1,080.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
1018(1-2) b Tileworks (Granite Slab 19mm thk.) sq.m. 540.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
Sub-Total for this Page Php
BILL OF QUANTITIES
Project Name : Construction of VIP/Media Lounge and Command Center
Location : Clark Civil Aviation Complex
UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)
1018(1-2) c Tileworks (Carpet Tile) sq.m. 50.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
1018(1-2) d Tileworks (Vinyl Plank) sq.m. 15.60
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
1032 Painting Works (3 coats) sq.m. 4,655.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per square meter)
1008(1) Windows lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
1010(a) Doors, Frame & Accessories lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
401(1) Metal Railing/Metalworks lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
1003 Carpentry/Ceiling lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
1013 Banawe Roofing lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
Sub-Total for this Page Php
BILL OF QUANTITIES
Project Name : Construction of VIP/Media Lounge and Command Center
Location : Clark Civil Aviation Complex
UNIT COST
ITEM NO. DESCRIPTION UNIT QTY. (Pesos) AMOUNT (Pesos)
101 Demolition of Exsiting Structure l.m. 20.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per linear meter)
1100/1/2 Electrical Works lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
SPL-1 Mechanical Works lot 1.00
(Pesos ____________________________________________
_______________________________________________ and
____________________________ per lot)
Sub-Total for this Page Php
CONSTRUCTION OF VIP/MEDIA LOUNGE &
COMMAND CENTER
DAYWORK RATES FOR MATERIALS,
LABOR AND EQUIPMENT
DAYWORKS SCHEDULE
LABOR
Construction of VIP/Media Lounge & Command Center
NO. TYPE OF LABOR UNIT RATE
1 Foreman Hour
2 Skilled Laborer Hour
3 Unskilled Laborer Hour
4 Driver Hour
DAYWORKS SCHEDULE
MATERIALS
Construction of VIP/Media Lounge & Command Center
NO. TYPE OF MATERIALS UNIT RATE
1 Cement Bag
2 Fine Aggregate Cu.m.
3 Coarse Aggregate Cu.m.
4 Reinforcing Steel Bars Kg.
5 Coco Lumber Bd.ft.
6 Assorted CWN Kg.
7 G.I. Tie Wire, Ga. 16 Kg.
DAYWORKS SCHEDULE
EQUIPMENT
Construction of VIP/Media Lounge & Command Center
NO. TYPE OF EQUIPMENT UNIT RATE
1 Concrete Mixer, 1 Bagger Hour
2 Excavator, 0.5 cu.m. Hour
3 Concrete Vibrator Hour
4 Wheel Loader Hour