SAP-UAT Training Material

The document provides training notes on creating a material and work center in SAP. It outlines the necessary steps and fields to create a material in SAP, including filling out basic data, MRP planning, procurement types, and work scheduling. Key mandatory fields are also noted such as valuation category and base unit of measure. The document also briefly mentions the steps to create a work center in SAP by filling in the plant code and basic data. Readings on pre-dispatch inspections are recommended for make-to-stock planning.

Uploaded by

Akki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views2 pages

SAP-UAT Training Material

The document provides training notes on creating a material and work center in SAP. It outlines the necessary steps and fields to create a material in SAP, including filling out basic data, MRP planning, procurement types, and work scheduling. Key mandatory fields are also noted such as valuation category and base unit of measure. The document also briefly mentions the steps to create a work center in SAP by filling in the plant code and basic data. Readings on pre-dispatch inspections are recommended for make-to-stock planning.

Uploaded by

Akki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SAP-UAT Training Notes:

1) Create Material (MM01):

Industry Sector-Aerospace
Material Type- Raw Material
Copy from existing material

Necessary tabs
Basic Data1
Basic Data2
Purchasing Group
Sales Group

MRP1:
Fill in UOM
MRP Type – ND (PPC later on assigns VB (Manual Re-order point planning) based on
requirement for MRP run for Currently-used materials)
Planning Time fence – (PPC / MRP controller changes this field later based on MRP type
selected)
Planning cycle – (Only used in case of Time-based MRP Planning)
Minimum Lot size – (Fill, if reqd)

MRP2:
Procurement Type – F(External), E (Internal), X (Both ext and int)
GR Processing Time – (generally 5 days – per Stores SLA)
Planned Delivery Time – (Date can be selected if needed)
Safety Stock and Service Level % (Mandatory fields for Automatic Re-order point based MRP,
not Manual)

MRP3:
Period Indicator-“M”
Strategy Group – “10” (for Make-to-Stock planning)

MRP4:
Selection Method – “3” (for Selection by Production version only)
Individual / Collective – “XX” (based on whether individual planned orders are needed or
collective)
Store Location – “XX” (can be assigned if defined internally)

Work Scheduling:
Production Scheduler – (Needed for doing MRP run – MRP controller/PPC does it)

**Mandatory Fields: Valuation Category, Batch Management, Base Unit of Measure


The mandatory fields can’t be changed at a later stage. If requirement comes up, new
material code needs to be created.

Read about: Pre-dispatch Inspection (Needed for MTS)

2) Create Work Centre (CR01):

Fill in plant code


Basic Data: