PROPOSED POSITION                       :      TEAM LEADER
NAME OF CONSULTANCY                     :      ENVIRO-TECH CONSULT (P) LTD
NAME OF STAFF                           :       Dwarika Phuyal
PROFESSION                              :       Environmental Studies
DATE OF BIRTH                           :      May 19, 1971
YEAR WITH THE CONSULTANCY :                    10 yrs
NATIONALITY                             :      Nepali
MEMBERSHIP IN PROFESSIONAL SOCIETIES:
               Member, Nepal Engineering Council; Membership No.: 2672 "Civil, A"
                        Member, Nepal Engineers' Association
Detail Task Assigned:
   -       Carrying out feasibility study of waste water management projects,
   -       Overall Project working team management
   -       Carrying feasibility survey and conceptual Design
KEY QUALIFICATION:
Mr. Phuyal has been working as a Sewerage Design and Environmental Expert since last 15
years has accumulated significant experience in carrying out feasibility study, Preparation of DPR
of wastewater and water supply projects, detail design and estimate of various rural water supply
and sanitation schemes. Similarly he has also involved in carrying out feasibility and IEE studies
of various urban water supply and sanitation projects. He has also experience in Preparation of
Road and Sewer network plan and Physical Development Plan. He has also involved in carrying
out Environmental study IEE of different roads and water supply projects. He has also involved
in Feasibility (Alignment) Study, Detailed Engineering Survey, Design, Cost Estimate, Economic
Analysis Environmental Study, and Data entry and data analysis of various road, drainage and
water supply projects.
TRAININGS:
                    A Ten day training to engineers and overseers on small rural infrastructures
                     management for GTZ/PASRA districts implemented by GTZ (as a Trainer) March,
                     2009
                    A Ten day training to DDC engineers, overseers and staffs on IEE organized by
                     DDC Palpa, January 2006 (as a trainer)
                  A Fifteen day Supervisory Training to Technical Human Resources
                 (Overseer/Sub-overseer) of Community Based rural Infrastructure Projects of
                 Plan International Bara, Rautahat, Banke, Bajhang, Morang, Sunsari districts ,
                 2001 organized by PLAN Nepal
              Training Taken/Workshop Seminar Attended
               One Month Training on Construction site management, Resettlement,
                Environmental management, IEE, Social mobilization etc. by DRILP/DoLIDAR,
                (ADB funded green road projects), September 2007.
              3 days Orientation training on Pre-Feasibility Site Appraisal, Environmental
                Screening, Monitoring and Evaluation of rural water supply projects 25 th -27th
                Feb., 2005, organized by RWSSFDB.
              National Seminar on “ Environment Engineering Challenge and Opportunities”,
                June 5th 2002 on the occasion of World Environment Day 2002 jointly organized
                by environmental Engineering Program Department of Civil Engineering IOE
                Pulchowk and Society of Health Engineering Nepal.
              Workshop on Health and Research Methodology 21 st–25th July 2003 organized
                by National Health Research Council Kathmandu.
EDUCATION
   Master’s of Science in Environmental Engineering; TU/2002
    Bachelor in Civil Engineering; TU/1999
EMPLOYMENT RECORDS
FROM Jan, 2013                      :   TO Date (Intermittent)
EMPLOYER                            :   Enviro-Tech Consult (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES               :   Environmental Expert
Involved as a environmental expert in Preparation of Land Use Map, Land Capability Map, Soil
Map, VDC Profile of 4 VDCs of Kailali District.
Involved as a environmental expert in preparation of land use map, land capability map, soil map
and VDC profiles of 5 VDCs of Saptari District.
As a environmental expert in Preparation of Physical Development Plan of Bindraseni town
development Committee, Dailekh
As a environmental expert in Preparation of GIS based Urban Mapping of Baglung Municipality
Involved in carrying Initial Environmental Examination(IEE) of Kathmandu Fun Park at Palanse,
Bhaktapur and Jugal Multiple College building, Sindhupalchowk.
EMPLOYMENT RECORDS
FROM Nov, 2017                      :   TO Date (Intermittent)
EMPLOYER                            :   BDA (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES               :   Water Supply cum Environmental Safeguard Expert
Involved in Preparation of DPR and IEE study reports of Ratnanagar, Parsa and Khalanga Co-
financing Water Supply and Sanitation Projects Chitwan and Jajarkot.
FROM April, 2016                    :   To January, 2018 (Intermittent)
EMPLOYER                            :    BDA Nepal(P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES               :   Environmental Safeguard Expert
Involved in Construction Supervision and environmental monitoring of Gautam Buddha
International Airport Upgrading Project Bhairahawa.
Assist the PIU in monitoring compliance with the EIA/ IEE and Resettlement Plans and any
environmental and social development issues identified during supervision phase in co-ordination
with PIU, PCO, NGOs and other stakeholders; Assist the PIU in updating and implementing the
Environment Management Plan (EMP) and establishing a system and training staff to monitor the
project's environmental indicators.
FROM Sept., 2017             : To Mar., 2018
EMPLOYER                        : GOEC Nepal Pvt. Ltd
POSITION HELD                  : Sewerage Design Engineer cum Environmental Expert
DESCRIPTION OF DUTIES: Responsible for carrying detailed survey, design, and preparation
of Bid Documents for Preparation of Integrated Water Supply and Waste Water management
Project including Prteparation of DPR of surface drainage, sewerage systems and treatment
plant:
1. Karyabinayak Lalitpur,2. Narayan Municipality Dailekh, 3 Bardiwas Municipality Mahottari,
Byas Municipality Tanahu.
Feasibility Study of Intergrated Water Supply and Waste Water management projects:
1.Kamalamai, Sindhuli, 2. Ramgram, Nawalparasi, 3. Beni, Myagdi,4. Chainpur,
Sankhuwasabha, 5. Golbazaar Siraha, 6. Letang, Bhokteni, Morang,7. Chandrapur, Rauthat.
FROM Dec, 2015                         : TOJuly, 2017 (Intermittent 5 Months)
EMPLOYER                               : RAAS Engineering Consultancy (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES                  : Environmental Expert
Involved in Land Pooling project of Basantapur New Town Project project (about 600 ropanies of
land) and Khurkot New Town Project (about 500 ropanies of Land).
Involved in field visit and collection of environmental baseline information and prepare
Environmental Profile of the projects.
FROM Oct., 2015              : To July., 2016
EMPLOYER                     : GOEC Nepal Pvt. Ltd
POSITION HELD               : Sewerage Design Engineer cum Environmental Expert
DESCRIPTION OF DUTIES: Responsible for carrying detailed survey, design, environmental
study and preparation of Bid Documents for Preparation of a detailed master Plan and DPR of
surface drainage, sewerage systems and treatment plant of Itahari Sub-Metropolitan City.
Design of surface sewerage system and sanitary sewerage system (Screening, Grit Chamber,
Oxidation Pond)
FROM Oct., 2015              : To July., 2016
EMPLOYER                      : Bright Future International Pvt. Ltd
POSITION HELD                : Team Leader/Sanitary cum Environmental Expert
Carrying out Initial Environmental Examination (IEE) Study of 3 Sewerage Systems and Waste
                                         Water; Treatment Plants
(Hastinapur, Kathmandu, Betini, Nuwakot, Manthali, Ramechhap); Carrying out Initial
                                         Environmental Examination (IEE) Study of 2
Water Supply and Sanitation Projects; (Sundar Water Supply and Sanitation Project, Khairahani,
                                         Chitwan and Manthali Water
Supply and Sanitation Project, Manthali, Ramechhap) implemented by Department of Water
                                         Supply and Sewerage, Panipokhari;
Collect Physical, Baseline information; Conducted public consultation meeting; Identify, Evaluate
                                         and assessment of impacts;
 Prepare EMP; Prepare detail IEE Reports and present in Ministry.
Review of Design and Feasibility reports of those projects.
FROM Jul, 2007                        :   TO May, 2013 (Intermittent)
EMPLOYER                              :   RAAS Engineering Consultancy (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES                 :   Environmental Expert/Senior Civil Engineer
             As a environmental Expert in Survey and Preparation of Present Land Use Maps,
              Land Capability Maps,Soil Maps, Land Use Zoning Maps and Preparation of Village
              Profiles of 5 VDCs of Chitwan district.
             As Environmental Expert in Survey and Preparation of Present Land Use Maps,
              Land Capability Maps,Soil Maps, Land Use Zoning Maps and Preparation of Village
              profiles of Panchkhal VDC of Kavre Palanchok district. July 2010
             Preparation of Physical Development Plan of Bindraseni Town Development
              Project, Dailekh.
            Hazard Map preparation of Rapti River Basin 2063
             Civil Engineer Re-adjustment Plan Preparation of Manohara Land Pooling Project
              Kathmandu Metropolitan City and Madhayapur Thimi Municipality 2011-2012
             Civil Engineer Re-adjustment Plan Preparation of Waterpark Land Pooling Project
              Nepalgunj, Bake 2012
             Civil Engineer Kathmandu Metropolitan City Chamati Land Pooling Project
              Kathmandu District including physical development plan, existing infrastructure plan
              etc
            Civil Engineer in Preparation of Road, Sewer and Storm water Drainage Network Plan
              of Dasrathchand Municipality 2065
            Preparation of Road, Sewer and Storm water Drainage Network Plan of Gorkha
              Municipality 2065
            Feasibility study of integrated compact settlement at Pyuthan District,2065.
            Preparation of Physical Development Plan of Rolpa District Thwang village 2064
            Preparation of Physical Development Plan of Khalanga Darchula District 2066
            Preparation of Physical Development Plan of Biratchowck Morang District 2065
            Preparation of Road, Sewer and Storm water Drainage Network Plan of
              Dasrathchand Municipality 2065
            Chamati Land Pooling Project Kathmandu Metropolitan City 2007
FROM May 2008                  : TO May.2010
EMPLOYER                         : DA Nepal (P) Ltd
POSITION HELD            : Sewerage and Drainage Design Engineer
DESCRIPTION OF DUTIES: Responsible for Feasibility study and designed with separate
system using RCC Hume pipe and discharged on natural water course after treated on horizontal
flow reed bed treatment of sewerage project in Hile/Dhankuta, Katunje/Bhaktapur and sewerage
project in Okhaldhunga.
FROM Oct 2006               : TO Dec.2007
EMPLOYER                      : IDRS (P) Ltd
POSITION HELD                       : Team Leader/ Civil cum Environmental engineer
DESCRIPTION OF DUTIES: Responsible for
Socio- Economic study, feasibility Initial Environmental Examination and Detail Engineering
Design and Estimate and construction supervision of Khalanga-Rimna Road, Jajarkot
DRILP/DoLIDAR ADB Funded Project, conducted training to social and technical group of the
project.
Overall social and Technical Team Management
Overall project management
FROM Jan 2005               : TO Novemeber.2005
EMPLOYER                   : BDA/GOEC (JV)
POSITION HELD                      : Water Supply and Sanitary Engineer (DY Team Leader)
DESCRIPTION OF DUTIES: Responsible for
Socio- Economic study and Detail Engineering Design and Estimate of Tansen Water Supply and
Sanitation Project Palpa
FROM Oct 2004               : TO Sept 2007 (Intermittent)
EMPLOYER                    : Enviro- Tech Consult (P) Ltd Kathmandu
POSITION HELD               : Team Leader /Environmental Engineer
DESCRIPTION OF DUTIES: Responsible for
   Initial Environmental Examination of Khangsang- Khurkot Road (40 Km) Sindhuli
   Initial Environmental Examination of Musikot- Chaurjahari District Agricultural Road (45
     Km) Rukum
   Initial Environmental Examination of Musikot- Chunban District Agricultural Road (35 Km)
     Rukum
   Design and Estimates of various Rural Water Supply Schemes of Rukum & Sindhuli
     District.
   Bhalakhcha Water Supply Project ( 2 Schemes) Rukum.
   Jare Water Supply Project (5 schemes) Rukum.
   Saakh Water Supply Project ( 6 Schemes) Rukum
   Preparation of Road, Drain and Sewer Network Plan and Land use Plan of Mangalsen
     VDC, Achham
   Preparation of Road, Drain and Sewer Network Plan and Land use Plan of Martadi VDC,
     Bajura
   Detail Survey, Design and Estimate of Internal Roads and Sewers Network of Attaria
     Chowk of Kailali District.
   Detail Survey, Design and Estimate of Internal Roads and Sewers Network of Attaria
     Chowk of Kailali District.
   Preparation of Physical Development Plan of Dullu VDC of Dailekh District.
FROM April 1999             : TO Sept. 2005 (Intermittent)
EMPLOYER                    : ETA Consult/ RWSSFDB/WB, Kathmandu
POSITION HELD               : Water supply and Sanitation Engineer
DESCRIPTION OF DUTIES: Responsible for;
       Process and Compliance Monitoring and Evaluation of Development Phase Batch V
        Schemes (19 Nos. Rural water Supply and Sanitation Schemes )
       Monitoring and Evaluation of Supporting Organisation (5 nos of SOs)
       Monitoring of Social and Technical team of small WSS projects
       Pre-Feasibility Site Appraisal with Environmental Screening of Batch VI Schemes (small
        rural water supply and sanitation schemes).
         FIRDO-Pyuthan (3schemes)
         MAYUS-Pyuthan (3schemes)
         MSS- Surkhet (3 schemes)
         4-S – Jumla (3 schemes)
       Design and Estimate Finalization of Batch V Schemes
         MRMG Arghakhachi (3 schemes)
         Diyalo Sindhuli (4schemes)
       Carried out Impact study, design, monitoring and evaluation, training, pre- feasibility site
        appraisal, NGO assessment of Drinking Water Supply and Sanitation Projects of CECI
        with CBED and CHI Projects at Baitadi, Jumla and Dadeldhura
       WSS Engineer for impact study Project of implemented water supply and sanitation
        Projects in Bara, Rautahat Districts for PLAN Nepal, Bara / Rautahat Program in 2001.
       WSS Engineer for Tube well Installation, Development and Conduct Hygiene and
        Sanitation Education (HSE) and Water Quality Assessment, Conduct CBO Training on
        Water and Sanitation and Masonry Training to Community Members with Manual
        Preparation of Bara/Rautahat supported by Plan Nepal, Bara/Rautahat Program in 1999.
LANGUAGE & DEGREE
OF PROFICIENCY :
              Reading                        Spoken                         Written
       English   -   Excellent               Excellent                      Excellent
       Nepali    -   Excellent               Excellent                      Excellent
       Newari    -   Excellent               Excellent                      Excellent
       Hindi     -   Good                    Good                           Good
COUNTRIES OF WORK EXPERIENCE                         :   Nepal
CERTIFICATION:
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly
describe me, my qualification, and my experience.
Signature of                          Signature of authorized                      Day/Month/Year
Staff member                          representative of the Consultant
Full Name of the staff member            :   Dwarika Phuyal
Full name of authorized representative   :