SERVICE
NO SPARE PARTS
10000 Hrs 20000 Hrs 30000 Hrs
1 Bearing Pad
2 Turning Gear
3 Bearing No.1
4 Steam Inlet Nozzle Set
5 HP Casing Bolts
6 HP Casing Bolts
7 HP Casing Bolts
OVERHOULE
INSPECTION
INSPECTION
8 Governor Lever
9 Speed Sensor
10 Speed Sensor
11 Platinum Thermistor
12 Platinum Thermistor
13 Bolts & Nuts For steam chamber
14 Shaft Front Glanding
15 Shaft Rear Glanding
16 Diaphragm Glanding
17 Spring Sheet
18 Main Thrust Pad
19 Auxiliary Thrust Pad
20 Ventilation Fan For Oil Tank
Greasing, Oil change, Filters change, belt tightening
Maintenance
10000 Hrs 20000 Hrs 30000 Hrs
INSPECTION OVERHOULE
1. Visually inspect turbine for external damage. 1. Remove and clean steam strainer.
2. Check oil level in reservoir and governor. Replace every three years.
3. Check vibration levels. 2. Remove top half of turbine casing and check
4. Any change in performance, vibration,or for scale and foreign material on wheels,
temperature indications should be buckets and nozzles.
investigated; watch for trends. 3. Check thrust bearing end float.
1. Check operation of auxiliary oil pump. 4. Check carbon rings for wear.
2. Check operation of shut down device(s). 5. Inspect journal bearings.
3. Take oil sample. 6. Drain and clean oil reservoir.
4. Exercise the trip and throttle valve 7. Drain and flush governor.
5. Check for steam, water, and oil leakage. 8. Clean and lubricate all linkages.
9. Verify the stroke of all governor control
valves
10. Verify the operation of the governor system
and control valves.
11. Calibrate all pressure and temperature
switches and transmitters.
12. Check sentinel valve for proper operation.
bearing pad clearance inspection & condition inspection
Thrust pad clearance inspection & condition inspection
Pulling out the rotor of generator
Realignment
Check the steam passage clearance
Check to the plan difference of the clapboard
Check the Centering support system, which includes:
A. Check the vertical pin, claw and the horizontal pin
B. Check the bolts clearance of the splitting casing
C. Check the vertical pin and the claw washer of the front cylinder and front bearing.
Check of the Steam gland and depression center
Cleaning to the rotor and clapboard
Check to the main steam valve / Manipulation Seat Valve and the valve stroke
Check and adjustment to the steam gland and steam passage clearance
Check the clearance between the splitting casings after being closed
Check the pad in the steam gland and steam exhaust section
Check the rear cylinder
Dismantle auto main steam valve and maintenance
Maintenance of turning gear device
Check & Test All Protection Turbine System
Check all the instruments in the turbine and replace them if
necessary.