Software Testing: Software Development Life-Cycle

The document discusses the software development life cycle and testing process. It describes traditional waterfall and agile scrum methodologies. For waterfall, ideas are formalized into requirements, specifications are designed and approved, coding occurs, then testing and bug fixes. For agile scrum, user stories are added to the product backlog, the team plans and commits to sprints, work is demonstrated at sprint reviews, and retrospectives improve the process. Testing begins once code is stable to avoid wasted effort on changing code.

Uploaded by

Martin Obretenov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views32 pages

Software Testing: Software Development Life-Cycle

The document discusses the software development life cycle and testing process. It describes traditional waterfall and agile scrum methodologies. For waterfall, ideas are formalized into requirements, specifications are designed and approved, coding occurs, then testing and bug fixes. For agile scrum, user stories are added to the product backlog, the team plans and commits to sprints, work is demonstrated at sprint reviews, and retrospectives improve the process. Testing begins once code is stable to avoid wasted effort on changing code.

Uploaded by

Martin Obretenov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

Software Testing

Software Development Life-Cycle


Idea and Requirements

• Description of the purpose


“It would be good to have these functionalities on our Web Site”
• Ideas come from
- Marketing or product management
- Users or customers - Anyone in the company, there is no such thing as a dumb idea
- Competitors

• Ideas (if accepted) are formalised as Requirements


“These are the functionalities that we are going to implement on our Web Site”
Specifications

Specification Describes:
• Functionality
• Product design
• Performance requirements
• System architecture
Design
• Description of the way to reach the purpose – how to made the software
• Specifications
PRD(Product Requirements Design)
BRD (Business Requirements Design)

• Good Specification has following characteristics


– Clarity of details and definitions
– No room for misinterpretation
– Absence of internal/external conflicts
– Completeness
Design
• Once Specification is approved it should not be changed
• Changes in specification do happen
– Can lead to bugs
– Changes should be negotiated/communicated to Dev and QA

• The sooner QA is involved in Design the better


• QA review Specification
– Specification might have bugs
Coding/Development
• Realisation of the ideas in the Specification
• Architecture design documents
• Schedule and planning
• Coding standards
• Code version control (Git, Mercurial, SVN)
• Development environments
• Code review
• Unit tests
Testing and Bug Fixes
• To test a code that changes is a waste of time
• Testing starts once code is in stable state
• Before starting tests, QA ensures
– There is test environment with correct code/build version
– Build is not broken by doing a smoke test

• Bugs are fixed then re-tested


• New functionality testing
• Regression test is done once bugs are fixed
• Acceptance test might be done by customers (UAT)
Release & Maintenance
Release:
• Whole/part of the product is given to the users
• Package of known files having concrete version
• Release can have new features and bug fixes
• Huge release can have downtime
• In case of production bugs
• Rollback
• Patch/Hotfix
Release & Maintenance

Maintenance

• Crucial to be able to work on several versions


• Separate different versions in source control
• Bug fixing can occur in several locations
• v1.0 is released, v2.0 is under development, v3.0 is being designed
• Create Test Case for each bug found in production
SDLC Methods

Waterfall
V-model
Agile
V vs V

• Verification – did we build the system right


• Validation – did we build the right system
Waterfall

• A stage starts after previous one is completed


• Requires big initial analysis and planning
• Simple to understand
• Time overrun
• Cost overrun
• Not adaptable to real needs
AGILE
• THE AGILE MANIFESTO
– Individuals and interactions over processes and tools

– Customer collaboration over contract negotiation

– Responding to change over following a plan


AGILE

• SCRUM
Specification

User Story
• Sentence format
• End user language - As user I want to be able to achieve X.
• End user needs
• Maintains end user contact
• Cheap to maintain
Specification

Examples of User stories:


• As a user closing the application, I want to be prompted to save if I have
made any change in my data since the last save.
• As a user, I want to search for my customers by their first and last names.
• As a user, I want to be able to review all send mails.
Scrum

• Roles • Sprint retrospective


• Daily scrum meeting
• Product owner
• Scrum master • Artefacts
• Team • Product backlog
• Ceremonies • Sprint backlog
• Sprint planning • Burndown charts
• Sprint review/demo
Product Owner

• Defines the features of the product


• Decides on release date and content
• Responsible for the profitability of the product (ROI)
• Prioritizes features according to market value
• Adjusts features and priority every iteration
• Accepts or rejects work results
Scrum Master

• Represents management to the project


• Responsible for enacting Scrum values and practices
• Removes impediments
• Ensures the team is fully functional and productive
• Enables close cooperation across all roles and functions
Team

• Self organised
• 5-9 full time members
• Cross functional (Devs, QAs , UI Experts, DB)
Who does what?

• Product owner • Removes impediment


• Facilitates scrum
• What
• When • Team
• Sign off • How
• Vision • How long

• Scrum master • Code


• Test
• Removes noise
Product Backlog
• The list of functionality and issues
• Managed by Product owner
• Prioritised
• One list for multiple teams on product
• Anyone can add items
• Keep visible
User Story
• Major building block of Product backlog
• Unit of scope – Who, What, Why
• Describes customer view of value
• High level acceptance criteria
• Story differs from Use case
Story tells only What but not How . The Use case is more detailed.
Sprint Planning
• Team picks items from product backlog that they can commit to complete
• Sprint backlog is created
– List of tasks necessary to achieve the work
– Task are identified and each item is estimated
– Scrum master does NOT decide for the team

• Team self-organises to meet the goal


– Tasks are NOT assigned by manager

• High-level design is considered


Sprint Backlog

• List of tasks the team needs to address during the sprint


• Tasks are estimated by the team
• Team members sign up for tasks, they are not assigned
• Estimated work remaining is updated daily
• Only team can change it
Sprint Review
• Team presents what is done during the sprint
• Typically takes the form of a demo of new features or underlying architecture
• Informal
– 2-hour prep time rule maximum

• Whole team participates


• Product owner(s) signs off stories
Sprint Retrospective
• Review at what is and is not working for the team
• Issues must be acted upon
• Typically an hour or so
• Done after every sprint
• Whole team participates
– Scrum Master
– Product owner
– Team
Daily Standup
• Happens everyday at a fixed time
• 15 minutes long stand up meeting
• 3 questions are answered by every team member
– What did I do yesterday?
– What do I plan to do today?
– Do I have some blocker?

• Only one team member can speak at a time


• Specific issues are resolved offline
Traditional vs. Agile
Summary
• Ideas can come from anywhere • Bugs are fixed then retested
• Design is describing how to achieve an idea • Regression testing is done before Release
• Once completed design should not change • Release is giving piece of software to users
• In reality it changes
– QA should adapt Test Cases to this change

• Testing should start once code is in stable


state
Summary

• Agile
• Roles - Product owner, Scrum master, Team, Ancillary roles
• Artefacts – Product backlog, Sprint backlog, Burndown charts
• Ceremonies – Sprint planning, Sprint review, Sprint retrospective, Daily scrum meeting

• Well implemented agile has many benefits