CAPACITY                                    DEMAND FACTOR (%) CONSUM
Equipment                                                 At Normal Sea         At Leaving Port
                                Out Put   Input   Total   Work          Going
                                 (kW)     (kW)    (set)   (set)   %     C.L     I.L   %       C.L
HULL PART :
Boat Winches                      3.70     4.26      2     2       -     -       -     -        -
E/H Pump for Cargo Gear          75.00    82.40      3     3       -     -       -    40     98.88
Cargo Hold Vent. Fan              1.50     1.80      2     2      90   3.24      -    90      3.24
Cargo Hold Vent. Fan              2.20     2.60      4     2      90   4.68      -    90      4.68
Pump Unit Room Vent. Fan          0.40     0.50      2     2      90   0.90      -    90      0.90
Galley Equipment                 32.00    32.00      1     1      50     -    16.00   50        -
Laundry Equipment                 3.00     3.00      1     1      50     -     1.50   50        -
Provision Ref. Comp.              2.20     2.48      2     1      75     -     1.86   75        -
Unit Cooler                       1.50     1.70      3     3      90   4.59      -    90      4.59
Accom. Ladder Winch               1.50     1.80      2     1       -     -       -     -        -
Sewage Treat System               2.25     2.55      1     1      80     -     2.04   80      2.04
Steering Gear                     3.70     4.60      2     1      50   2.30      -    50      2.30
Ref. Container ( ………. )           6.50     6.50      4     4       -     -       -    60     15.60
Accomodation Fan                  0.75     0.90      3     3      80   2.16      -    80      2.16
Accomodation Fan                  0.40     0.50      3     3      80   1.20      -    80      1.20
Accomodation Fan                  1.50     1.80      2     2      80   2.88      -    80      2.88
Accomodation Fan                  3.70     4.63      1     1      80   3.70      -    80      3.70
CO2 Bottle Room Fan               0.20     0.25      1     1      80   0.20      -    80      0.20
Miscellaneous                    10.00    10.00      1     1      50     -     5.00   50        -
         SUBTOTAL                                                       25.85 26.40          142.37
Keterangan : CL : Continous Load
             IL : Intermittent Load
Tabel 7
EMAND FACTOR (%) CONSUMPTION (kW)
 At Leaving Port      At Cargo Handling         At in Port
              I.L     %     C.L     I.L    %     C.L         I.L
                -      -       -      -     -      -      -
                -     75   185.40     -     -      -      -
                -     90     3.24     -     -      -      -
                -     90     4.68     -     -      -      -
                -     90     0.90     -     -      -      -
             16.00    50       -   16.00   50      -   16.00
              1.50    50       -    1.50   50      -    1.50
              1.86    75       -    1.86   75      -    1.86
                -     90     4.59     -    90    4.59     -
                -      -       -      -    70      -    1.26
                -     80       -    2.04   80      -    2.04
                -      -       -      -     -      -      -
                -     60    15.60     -     -      -      -
                -     80     2.16     -    80    2.16     -
                -     80     1.20     -    80    1.20     -
                -     80     2.88     -    80    2.88     -
                -     80     3.70     -    80    3.70     -
                -     80     0.20     -    80    0.20     -
              5.00    50       -    5.00   50      -    5.00
              24.36         224.55 26.40         14.73 27.66
                                           CAPACITY                                    DEMAND FACTOR (%) & CONSUMPTION (kW)
                                                                   At Normal Sea            At Leaving Port     At Cargo Handling          At in Port
             Equipment
                                 Out Put   Input   Total Work          Going
                                  (KW)     (KW)    (set) (set)
                                                                 %     C.L      I.L     %       C.L       I.L   %     C.L      I.L    %     C.L         I.L
MACHINERY PART :
M/E Aux. Blower                  15.07     17.05      2    1      -      -       -     60      10.23      -      -      -       -      -      -           -
M/E Turn Gear                    0.40      0.48       1    1      -      -       -      -         -       -     75      -     0.36    75      -         0.36
Main Air Compressor              11.04     13.00      2    1     70      -     9.10    70       9.10      -     70      -     9.10    70      -         9.10
Main Cool. F.W. Pump             3.70      4.30       2    1     75    3.23      -     75       3.23      -      -      -       -      -      -           -
Main Cool. S.W. Pump             11.00     13.00      2    1     80    10.40     -     80      10.40      -      -      -       -      -      -           -
Aux. Cool. S.W. Pump             5.50      6.50       1    1     70    4.55      -     70       4.55      -     70    4.55      -     70    4.55          -
Main L.O. Pump                   18.50     20.60      2    1     70    14.42     -     70      14.42      -      -      -       -      -                  -
L.O. Transfer Pump               1.50      1.80       1    1      -      -       -      -         -       -      -      -       -      -      -           -
Filter L.O. Pump                 0.20      0.30       1    1     70    0.21      -     70       0.21      -      -      -       -      -      -           -
F.O. Supply Pump                 2.20      2.80       2    1     65    1.82      -     65       1.82      -      -      -       -      -      -           -
F.O. Transfer Pump               1.50      1.80       1    1     70            1.26    70         -     1.26     -      -       -      -      -           -
F.O. Transfer Pump               1.50      1.80       1    1      -      -       -      -         -       -      -      -       -      -      -           -
F.W. Pump                        5.50      6.50       2    1     75      -     4.88    75         -     4.88    75      -     4.88    75      -         4.88
Sanitary Pump                    2.20      2.50       2    1     85      -     2.13    85         -     2.13    85      -     2.13    85      -         2.13
Fire & G.S. Pump                 18.50     22.00      1    1      -      -       -     80      17.60      -      -      -       -      -      -           -
Bilge Pump                       1.50      1.80       1    1      -      -       -      -         -       -      -      -       -      -      -           -
Fire & Ballast Pump              18.50     22.00      1    1      -      -       -     80      17.60      -     80    17.60     -      -
F.O. Purifier                    1.50      1.80       1    1     70    1.26      -     70       1.26      -      -      -       -      -     -        -
Sludge Pump                      2.20      2.80       1    1      -      -       -      -         -       -      -      -       -      -     -        -
L.O. Purifier                    1.50      1.80       1    1     70    1.26      -     70       1.26      -     70    1.26      -      -     -        -
E/R Vent. Fan                    3.70      4.30       2    2     95    8.17      -     95       8.17      -     50     4.3      -     50    4.3       -
Lathe                            2.20      2.50       1    1      -      -       -      -         -       -     50      -     1.25    50     -      1.25
Drill. Mach.                     0.40      0.50       1    1      -      -       -      -         -       -     50      -     0.25    50     -      0.25
Grinder                          0.40      0.50       1    1      -      -       -      -         -       -     50      -     0.25    50     -      0.25
Electric Welder …….              25.00     25.00      1    1      -      -       -      -         -       -     40      -     10.00   40     -      10.00
L.O. Purifier Tester             8.00      8.00       1    1     100     -     8.00    100        -     8.00    100     -     8.00     -     -        -
L.O. Setling Tank Heater         1.00      1.00       1    1      -      -       -      -         -       -      -      -       -      -     -        -
Waste O. Tank Heater for Incin   3.00      3.00       1    1      -      -       -      -         -       -      -      -       -      -     -        -
Waste O. Incin                   0.40      0.50       1    1      -      -       -      -         -       -      -      -       -      -     -        -
Eng, C.R. Unit Cooler            2.60      3.31       1    1     75    2.48      -     75       2.48      -     75    2.48      -     75   2.48       -
              SUBTOTAL                                                 47.80   25.36           102.33   16.26         30.19   36.21        11.33    28.21
Ket.: C.L. : Continous Load
      I.L. : Intermittent Load
                                                  CAPACITY                                                    DEMAND FACTOR (%) & CONSUMPTION (kW)
                                  Out Put       Input       Total      Work               At Normal                 At Leaving                At Cargo                At Inport
           Equipment
                                   (kW)         (kW)        (Set)      (Set)              Sea Going                     Port                  Handling
                                                                                     %       C.L       I.L     %       C.L        I.L    %      C.L       I.L    %      C.L        I.L
ELECTRICAL PART
Acc. Space Light                   18.00        18.00        1           1           40     7.20        -      40      7.20        -     40    7.20        -     40    7.20         -
Machinery Space Light              4.00         4.00         1           1           85     3.40        -      85      3.40        -     85    3.40        -     85    3.40         -
Weather Deck Light                 6.60         6.60         1           1            -       -         -      20      1.32        -     90    5.94        -     90    5.94         -
Portable Cargo Light               3.60         3.60         1           1            -       -         -       -        -         -     80    2.88        -      -      -          -
Nav. and Signal Light              0.30         0.30         1           1           60     0.18        -      60      0.18        -     20    0.06        -     20    0.06         -
Interior Communication             1.50         1.50         1           1           50     0.75        -      50      0.75        -     50    0.75        -     50    0.75         -
Radio Station                      2.70         2.70         1           1           60     1.62        -      60      1.62        -     30    0.81        -     30    0.81         -
Nautical Instrument                4.00         4.00         1           1           70     2.80        -      70      2.80        -     70    2.80        -     70    2.80         -
Miscellaneous                      4.00         4.00         1           1           50     2.00        -      50      2.00        -     50    2.00        -     50    2.00         -
           SUBTOTAL                                                                         17.95     0.00            19.27      0.00         25.84      0.00          22.96      0.00
             TOTAL                                                                          91.60     51.76           263.97     40.62        280.58     62.61         49.02      55.87
Ket.: C.L. : Contiboti Load
      I.L. : Intermiltel Load
     CL = IL = DEMAND FACTOR (%) x SUM OF WORK EQUIPMENT (SET) x Pin (kW)
    DEMAND FACTOR (%) =         { P (yang terpakai) : P (yang terpasang) } x 100 %
    CL = IL = P (yang terpakai)
    SUM OF WORK EQUIPMENT (SET) x Pin (kW) = P (yang terpasang)
                                ELECTRIC POWER CONSUMPTION TABLE
> Nama Kapal                      : CARAKA JAYA 2nd PHASE 3650 DWT SEMI CONTAINER
SUMMARY OF GENERATOR LOAD
             EQUIPMENT              AT NORMAL      AT LEAVING       AT CARGO
                                    SEA GOING         PORT          HANDLING
a). INTERMITTENT LOAD
   1. Total Load (kW)                  51.76          40.62           62.61
  2. Diversity Factor                   0.50           0.50           0.50
  3. Necessary Power (kW)              25.88          20.31           31.31
     (a.1 *a.2)
b). CONTINOUS LOAD (Kw)                91.60          263.97         280.58
c). TOTAL LOAD (Kw)                    117.48         284.28         311.89
    (a.3 + b)
d). GENERATOR IN SERVICE (Kw)            200            400            400
                                      (1 X 200)      (2 X 200)      (2 X 200)
e). LOAD FACTOR GENERATOR (%)          58.74          71.07           77.97
    (c/d *100 %)
CONTAINER
            AT IN PORT
              55.87
               0.50
              27.94
              49.02
              76.96
                200
             (1 X 200)
              38.48
                                           NORMAL SEA GOING                LEAVING PORT
                 GENERATOR
ALTERNATIF       IN SERVICE    WORK        MPL       LFG           WORK    MPL
                 (KW)          (SET)       (KW)      (%)           (SET)   (KW)
             1           400           1    117.48         29.37
             2           200
             3           100
             4           250
LEAVING PORT           CARGO HANDLING           IN PORT
        LFG    WORK    MPL    LFG       WORK    MPL       LFG
        (%)    (SET)   (KW)   (%)       (SET)   (KW)      (%)