A
PROJECT TITLE ON
“ICE-CREAM PARLOR SHOP
     MANAGEMENT”
      SUBMITTED BY:
        SIDDARTH. M
       B.C.A. final year
       Reg.No: B1211034
                                      SYNOPSIS
 PROJECT TITLE : ICE-CREAM PARLOR SHOP
                    MANAGEMENT
INTRODUCTION:-
The main key feature or the key idea for the project is to automate the Ice-Cream parlor shop
management. We have developed an Application that will enable all the customers to buy the
products from the shop. The System is fully automated with all the features in Sales and
Purchase. The motivation behind the development of this project is an attempt it create a
practical application that will help in improving the emerging use of I.T. technologies in a
developing country like India today. This desktop based application concept has now started
taking grip in our country as it has many advantages over the traditional methodology.
INTRODUCTION TO PROJECT:-
“TIME IS MONEY” is the perfect statement that justifies our goal for developing application
system. The system is fully automated. Bill, Stock Statement, etc all the reports are
generated through Project.
                      SYSTEM STUDY AND ANALYSIS:
SYSTEM ANALYSIS:
System analysis is a process of gathering and interpreting facts, diagnosing problems and the
information to recommend improvements on the system. It is a problem solving activity that
requires intensive communication between the system users and system developers. System
analysis or study is an important phase of any system development process.
The system is studied to the minutest detail and analyzed. The system analyst plays the role of
the interrogator and dwells deep into the working of the present system. The system is viewed
as a whole and the input to the system are identified. The outputs from the organizations are
traced to the various processes. System analysis is concerned with becoming aware of the
problem, identifying the relevant and decisional variables, analyzing and synthesizing the
various factors and determining an optimal or at least a satisfactory solution or program of
action. A detailed study of the process must be made by various techniques like interviews,
questionnaires etc. The data collected by these sources must be scrutinized to arrive to a
conclusion. The conclusion is an understanding of how the system functions. This system is
called the existing system. Now the existing system is subjected to close study and problem
areas are identified. The designer now functions as a problem solver and tries to sort out the
difficulties that the enterprise faces. The solutions are given as N proposals. The proposal is
then weighed with the existing system analytically and the best one is selected. The proposal is
presented to the user for an endorsement by the user. The proposal is reviewed on user and
suitable changes are made. This is loop that ends as soon as the user is satisfied with proposal.
PROBLEM DEFINITION:-
      This activity requires a precise definition of the problem in user terms.
      A clear statement of the problem is crucial to the success of the software.
      It helps not only the developers but also the user to understand the problem better.
      Keeping recording for every transaction in the registers takes More time & is a tedious
       job.
      To search for details of any particulars has to refer many Registers.
      Lacks reliability & no guarantee of sure end results.
      Calculations are done manually which may lead to errors.
      For all these reasons computerized system is the best solution.
PROPOSED SYSTEM:
        The aim of proposed system is to develop a system of improved facilities. The proposed
system can overcome all the limitations of the existing system.
ADVANTAGES of the Proposed System :
        The system is very simple in design and to implement. The system requires very low
system resources and the system will work in almost all configurations. It has got following
features.
      Security of data.
      Greater efficiency.
      Better service.
      User friendliness and interactive.
      Minimum time required.
 SYSTEM REQUIREMENTS:-
    HARDWARE REQUIREMENT:
   Number Description Alternatives (if available)
   PC with 2GB hard-disk and 256 MB RAM
 SOFTWARE REQUIREMENT
   Jdk 1.5
   Tomcat
   Ms Access
   Dreamviewer.