Field Inspection Report: Pile Fabrication

The inspection report summarizes an inspection of pile fabrication for a beverage can plant project. It lists the project and job details, inspectors involved, pile details from approved drawings, items inspected including diameter, length, reinforcement, formwork and cleaning, and notes the piles were accepted. The piles were fabricated according to approved drawings and specifications and passed inspection for the beverage plant project.

Uploaded by

ZEC LIMITED
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views2 pages

Field Inspection Report: Pile Fabrication

The inspection report summarizes an inspection of pile fabrication for a beverage can plant project. It lists the project and job details, inspectors involved, pile details from approved drawings, items inspected including diameter, length, reinforcement, formwork and cleaning, and notes the piles were accepted. The piles were fabricated according to approved drawings and specifications and passed inspection for the beverage plant project.

Uploaded by

ZEC LIMITED
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

FIELD INSPECTION REPORT

PROJECT FORM No: CRM-C-P-001


INSPECTION ITEM: PROJECT : CROWN BEVERAGE CANS MYANMAR
JOB No : PF-001
PILE FABRICATION PLANT :Depawaddy Production Yard
SIGNATURE
INSPECTION NOTICE No : PF-001 CONTRACTOR ACT CLIENT
CLIENT 'S INSPECTOR : / / / / / /
ACT INSPECTOR :
CONTRACTOR'S INSPECTOR :
LOCATION: Depawaddy Production Yard
Dwg No: SPC-01 Precast Concrete Pile Detail (Approved)
BASES FOR INSPECTION:
Doc No:
Pile/pile section

Date Checked

Date Approved

Evaluation
Formwork
Diameter

Top plate
Quantity

Cleanes
Spacer
Length

Stirrup
Rebar

Nose

Other comments:

Conclusion: Accepted Accepted with condition Not accepted