CLIENT : MINISTRY OF PUBLIC WORKS & HOUSING
CONSULTANT : CONTRACTOR :
DAR AL-HANASAH OOMS INTERNAIONAL HOLDING bv
PROJECT : REHABILITATION TND UPGRADING THE EXISTING NORTH RUNWAY AT Q.ALIA INT. AIRPORT
FIELD DENSITY ( SAND CONE METHOD ) TEST
( ASTM D 1556 , AASHTO T - 191 )
Station : 0+000 - 0+300(R.H.S)SHOULDER Request No : 1222
Location : NORTH RUNWAY Date : 9 / 7 / 7/20/2008
2006
Material for : SUBGRADE
Sub BaseLEVEL
A FIELD SAMPLE NO. 1
Location R
Station 0+220
Thickness of Layer cm 14
B MOISTURE CNOTENT
1 WT. OF WET SOIL gm 493.0
2 WT. OF DRY SOIL gm 452.0
3 WT. OF WATER gm 41.0
4 WATER CONTENT % 9.1
C FIELD DENSITY
5 TOTAL SOIL , FROM HOLE gm 4810
6 WT.OF SAND+CONTAINER BEFOR TEST gm 10000
7 WT.OF SAND+CONTAINER AFTER TEST gm 4918
8 SAND TO FILL HOLE + CONE gm 5082
9 SAND TO FILL CONE gm 1643
10 SAND TO FILL HOLE gm 3439
11 UNIT WEIGHT OF SAND g/cm3 1.514
12 VOLUME OF HOLE cm3 2271.5
13 WET UNIT WEGHT g/cm3 2.118
14 DRY UNIT WEGHT g/cm3 1.941
15 DEGREE OF COMPACTION % 98.1
D
16 REQUIRED COMPACTION % 90
17 REMAINING FILL TO P.G.L cm 22.5
18 MAXIMUM DRY DENSITY / MODIFIED g/cm3 1.98
19 OPTIMUM MOISTURE CONTENT % 10.4
Contractor Consultant
Tasted By Checked by
CLIENT : MINISTRY OF PUBLIC WORKS AND HOSING
CONSULTANT : CONTRACTOR : ABU SHREIK CO .
AMMAN - SOBEH CONSULTING ENG . OFFICE CONSTRACTION
PROJECT : MADABA - HISBAN ROAD - TENDER NO . 178 / 2003
MOISTURE / DENSITY REALATION ( AASHTO T . 180 )
( PROCTOR TEST )
Station : 5 +500 - 6 + 200 Rt Request No : Lab 163
Location : 6 +000 Date : 15 / 10 / 2005
Material for : SUB BASE
SAMPLE NO . 1 2 3 4
MOULD NO . 1 1 1 1
1 WT.OF WET SOIL + MOULD gm 9958 10118 10267 10292
2 WT.OF MOULD gm 5225 5225 5225 5225
3 WT.OF COMPACTED SOIL gm 4733 4893 5042 5067
4 VOLUME OF MOULD cm3 2113 2113 2113 2113
5 WT. DENSITY gm/cm 3 2.240 2.316 2.386 2.398
FLASK NO .
6 WT.OF DRY SOIL + FLASK gm 500 500 500 500
7 WT.OF WET SOIL + FLASK gm 484.0 475.2 466.8 460.8
8 WT. OF WATER gm 16.0 24.8 33.2 39.2
9 WT. OF FLASK gm
10 WT.OF DRY SOIL gm
11 MOISTRE CONTENT % 3.3 5.2 7.1 8.5
12 DRY DENSITY gm/cm3 2.168 2.201 2.228 2.210
DRY DE NS ITY gm /cm 3
Proctor
2.240
2.220
2.200
Proctor
2.180
2.160
2.140
2.120
2.0 4.0 6.0 8.0 10.0
MOISTURE CONTENT %
OPTIMUM MOSITURE CONTENT 7.5 %
MAXIMUM DRY DENSITY 2.23 gm/cm3
REQ.Specification 2.05 gm/cm3
CONTRACTOR CONSULTANT
Tested By : Cheked By :
Proctor