Tunnel Support Design
Eric Wang, PE
University of Denver
Tunneling Short Course
September 11, 2018
Agenda
1.0 Introduction
2.0 Tunnel Support Design Principles
3.0 Input for Design
4.0 Tunnel Support Systems
5.0 Hard Rock Tunnel Support Design Example
6.0 Soft Ground Tunnel Support Design
7.0 Summary
2
1.0 Introduction
Design Flowchart sample:
(THE Tunnel project)
3
2.0 Tunnel Support Design Principles
Rock Support Interaction:
• Optimize support installation - acceptable displacement.
Ground vs Support Reaction Curves Ground Reaction Curves based on Overburden Depth
4
3.0 Geologic Input for Rock Tunnel Design
• Rock Mass Classifications:
– Rock Mass Rating (RMR) System (Bieniawski, 1989)
– Modified RMR (Laubscher and Page, 1990)
– NGI’s (Q) System (Barton et al., 1974, 2015)
• Rock Mass Discontinuity Orientation and Properties
• Rock Hardness, Strength and Abrasiveness for Excavation
5
Initial Ground Support
• Rock Bolts / Dowels • Shotcrete
– Type – Thickness
– Length – Type, Dry vs Wet
– Pattern • Lattice Girders
– Anchorage
6
Rock Mass Classification – Q system
After NGI 2015
7
RMR Classification
8
Tunnel Support Design
Support Estimate:
• Empirical Approach
• Analytical Approach
– Kinematic (Block stability)
– Rock Reinforcement (Bischoff and Smart)
• Numerical Modeling
9
Empirical Methods
• Terzaghi’s Rock Load (conceptual)
– More conservative
– Modified by Deere et al., 1970
10
Empirical Methods
Graphical – Ubiquitous Joint Method (No. 7 Subway Line Extension) 11
Kinematic Approach
Jointed Rock Mass
• DIPS and UNWEDGE software (Rocscience)
Stereonet of structural Cavern cross-section – wedge
discontinuity planes formation and initial support pattern
(No. 7 Subway Line Extension) (No. 7 Subway Line Extension)
12
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
Station Cross section (THE Partnership)
Station Longitudinal section (THE Partnership)
13
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
Excavation Sequence:
Stage 1: Excavation of four TBM tunnels
(TBM1, 2, 3, and 4) through the station
cavern
Installing initial ground supports behind TBM1 TBM2
TBM shield as required.
TBM3 TBM4
Station Cavern Excavation (THE Partnership)
14
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
Excavation Sequence:
Stage 2: Excavation of Top-heading ( Side-drift 1,
Side-drift 2, and Center-drift 3)
Stage 3: Excavation of Benches and Inverts (4, 5,
6, 7, 8 and 9)
Installing initial ground support after excavation of TBM1 TBM2
each blast round including rock bolting and
shotcreting.
TBM3 TBM4
Full excavation sequence
15
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
• Partially release of stress at the face of excavation at each
excavation round before installing initial support.
• Evaluate stress release considering forces on ground and lining:
– Size of Excavation Face
– Ground Stiffness (Elastic Modulus, Poisson’s ratio)
– Initial Support Stiffness
– Length of Unsupported Excavation Round
(after Hoek)
16
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
Stress release for each excavation step before installing initial
support in the model:
TBM1 = 10%, TBM2 = 10%, TBM3 = 10%, TBM4 = 10%
Side-Drift1 = 30%, Side-Drift2 = 30%
Center-Drift3 = 40%
Bench4 = 50%, Bench5 = 50%
Bench6 = 50%, Bench7 = 50%
Invert8 = 50%, Invert9 = 50%
Final Lining = 100% relaxation
At the final stage: Eliminating the initial supports
17
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
• Simulate excavation sequence
– Consider ground strain due to excavation at each
Stage (Estimate stress release at each stage)
Eground = Stress / Strain
Installing initial support for each stage after simulating
the strains in the numerical model
(THE Partnership - ILF)
18
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
Top heading / bench / invert excavation at Final Stage
(prior to removing the initial support)
General Station Cavern Excavation combining TBM and SEM Enlargement
Top heading / Bench / Invert
(THE Partnership - ILF)
19
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
Total displacement contours with deformation Contours of yielded elements
vectors and deformed boundaries
(THE Partnership - ILF)
20
Numerical Modeling Example – THE Tunnel 34th Street Station Cavern
After Elimination of Initial Support
Contours of yielded elements
Axial Forces Bending Moments
(THE Partnership - ILF)
21
Ground Support
• Ground support classes
• Pre-support
• Ground Treatment / Ground improvement
22
Ground Support Classes
Contract - Typically 2 to 3 initial support classes
• Hard rock TBM example:
Support Class I: Pattern rock dowels Support Class II: Additional mine-straps Support Class III: Steel rib support
and/or shotcrete support
TUNNEL CENTER TUNNEL CENTER TUNNEL CENTER
ROCKBOLT ROCKBOLT
W6X25 STEEL RIB
6'- 4'-0
00
" 0"
160° TUNNEL AXIS
120°
6' TOE BOLT
23
Tunnel Support Systems
• Hard Rock – Available Tunnel Support Systems
• Rock bolts
• Rock Anchors
• Rock Dowels
• Mine straps
• Shotcrete – plain and reinforced (either steel fibers or WWF)
• Soft Ground – Available Tunnel Support Systems
• Soil Nails
• Rebar / Pipe Spiling
• Lattice Girders
• Shotcrete
• Cast-In-Place
24
Tunnel Support Systems
• Open (Gripper) TBM – Available Tunnel Support Systems
• Rock bolts / Rock dowels
• Steel Ribs with channel lagging or minestraps
• Shotcrete (limited to extremely poor ground)
• CIP Lining
• Double shield EPB / Slurry Face – Available Tunnel Support Systems
• Segmental lining
• Annular and Secondary Grouting
25
Ground Support through Shear Zone
Steel mat lagging
WWF and minestraps
Spiling and shotcrete
26
Pre-support Systems
Spiling (Fore-poling) Pre-grouting ahead of face Double-roof pipe canopy arch
27
Canopy spiling at Portal
28
Ground Treatment
Ground freezing
Pre-Grouting
29
Groundwater Control
Tunneling – infiltration control and waterproofing systems
Pre-excavation grouting of open fracture (South River Tunnel, Atlanta, GA., 2011)
30
Tunnel Grouting
CEMENTITIOUS vs. POLYURETHANE GROUTS
CEMENTITIOUS:
• Dry, open joints
• Long-term strength
POLYURETHANE:
• Wet conditions or relatively narrow fissures
• Time dependent properties
• Flow behavior (unreacted & reacting)
31
Tunnel Grouting
Pre-excavation Combined Cement + Water-reactive
Polyurethane Grout:
Steps
1. Polyurethane (TACSS – single component pre-
polymerized polyurethane) reaches permeable rock
mass – forms barrier upon reacting with water
2. Subsequent Cement grout able to begin filling crack
and curing with dilution from leaky crack.
32
5.0 Example - Pillar Stability Evaluation
• Phase 2D -Pre-support considered
• Staged Excavation
Results
• No significant yielding & deformations at 60% gripper pressure
• Localized spalling of Starter Tunnel shotcrete lining at 30%
gripper
• No impact on Global Stability
33
Pillar Stability Evaluation
Proposed
T302
34
Pillar Stabilization Measures
35
Starter Tunnel Rock Reinforcement
Brow and gripper wall support
Cradle for TBM launch
36
Starter Tunnel Rock Reinforcement
37
Starter Tunnel Rock Reinforcement
38
Shotcrete Support Design
In Blocky ground
• Prevent rock mass raveling and
loosening between bolts
• Typical failure modes:
– Adhesive
– Direct Shear
– Flexural
– Punching Shear
Applied Load Model -Shotcrete Support
(after Barrett and McCreath, 1993)
39
Shotcrete Support Design
Failure modes (blocky ground):
• Adhesive failure
Failure mode (after Barrett and McCreath, 1993)
Adhesive failure model
(after Barrett and McCreath, 1993)
40
Shotcrete Support Design
Failure modes (blocky ground):
• Direct Shear Failure
Failure mode (after Barrett and McCreath, 1993)
Direct Shear failure model
(after Barrett and McCreath, 1993)
41
Shotcrete Support Design
Failure modes (blocky ground):
• Flexural failure
Failure mode (after Barrett and McCreath, 1993)
Flexural failure model
(after Barrett and McCreath, 1993)
42
Shotcrete Support Design
Failure modes (blocky ground):
• Punching Shear failure
Failure mode (after Barrett and McCreath, 1993)
Punching Shear failure model
(after Barrett and McCreath, 1993)
43
Shotcrete Support Design
Good bond between rock and
shotcrete
• Direct Shear Failure unlikely
• Adhesion Failure > 4m spacing
Type equation here.
Adhesive failure model
(after Barrett and McCreath, 1993) 44
Shotcrete Support Design
Poor bond between rock and shotcrete
• Direct Shear Failure unlikely
• Adhesion Failure > 2.25 m spacing
(after Barrett and McCreath, 1993) 45
Soft-ground Tunneling
• Continuous support of face and periphery (invert)
• Timely groundwater control
Vacuum Drain
Horizontal vacuum system (after Taiwan HS Rail, 2001-2003)
Flowing Ground 46
Soft-ground Tunneling
• 3D tunnel convergence monitoring – vertical and transverse
• Reference THSR:
– 40-ft diam SEM tunnel
Vertical
Backfilled Invert
Lateral
47
Soft-ground Tunneling
• Continuous tunnel convergence monitoring - longitudinal
Longitudinal
Reference THSR: 40-ft diam SEM tunnel
48
Face bolting and Ring Cut in Sandy Ground
49
Face bolting and Ring Cut in Sandy Ground
1. Face Bolting 2. Partial Excavation
50
Face bolting and Ring Cut in Sandy Ground
Running Ground
• Periodic sealing (accelerator)
• Contact Grouting of Arch
3. Temp. Sealing
51
Protection of Adjacent Structures
• Identify reinforcement/ underpinning needs
• Instrumentation & Monitoring Program
• Control Ground movement /Subsidence
• Rigid Water-tight Excavation Support under
construction as well as permanent conditions
52
Building Impact Assessment - Procedure
1. Initial screening
2. Develop settlement profile
3. Evaluate settlement profile per project criteria (max surface
settlement, impact to structures, etc.)
4. Identify sensitive structures within influence zone - more
comprehensive analysis
5. Mitigation measures – construction restrictions
53
Settlement Contour Map at East Portal
Protection of Existing Structures – Potential TransPak
Impacts
1. TransPak (Shipping depot - single-story
warehouse bldg.) – settlement shallow (35-ft)
cover
2. Bayshore Freeway (Route 101) – adjacent
highway slight embankment shallow (30-ft)
cover
3. Lower Silver Creek – shallow cover
settlement cracking of liner leaking shallow
(30-ft) cover
0.8 0.8
0.8 0.8
1.1 1.1
54
Settlement Contour Map at West Portal
DEKA BATTERIES ALL WORLD FURNITURE
Protection of Existing Structure
1. I-880 Nimitz Freeway Overpass, Shallow cover (+/-
40 FT) embankment footing and adjacent pile
foundation.
2. Shallow cover (+/- 40 FT) overlying single-story
building i.e., All-World Furniture and Deka
Batteries settlement potential.
0.9 1.4
0.9 1.4
55
Building Impact Evaluation
56
Potential Mitigation Options
Further evaluation of specific existing structures based upon ground conditions and as-built
foundation data, potential mitigation options could feature:
• Structural Underpinning,
• Grouted Canopy spiling and lattice girder
• Rigid Support of Excavation Systems (Secant pile walls, etc.)
• Ground treatment
“A critical issue in design of mitigation measures is avoiding the creation of hard points in
the building that can focus and amplify building response or damage.” (Boscardin and
Walker, 1998)
57
Tunnel Support Design Summary
Summary
• Project-specific ground characterization
• Compatible excavation methodology
– Hard rock tunnel: rock mass discontinuities, strength and abrasion
– Soft-ground tunnel: continuous face and periphery support/ GW control /
monitoring
• Contingency – Risk Mitigation measures: pre-support / ground
treatment/ temporary invert support
• Optimize support design evaluate results from several analytical
approaches
58
Questions?
Mile-high thank you for your attention!
59