STP 1129
Slurry W alls: Design,
Construction, and Quality
Contro/
David B. Pau!, R ichard R . Davidson, and Nicholas J. Cavalli, editors
           ASTM Publication Code Number (PCN)
           04-011290-38
           ASTM
           1916 Race Street
           Philadelphia, PA l 9103
Contents
Qverview-0. B. PAUL, R. R. OAVJOSON, AND N. 1. CAVALLI                              IX
                               STATE-OF-THE-ART PAPERS
History ofSlurry Wall Construction-A. L. RESSI DI CERVIA                             3
Making Diaphragm W ali Joints Watertight with the CWS System-P. VAN EL              16
S lurry Walls -Construction Quality Controi-G. J. TAMARO ANO R.     J.   POLETTO    26
USA Practice Slurry Wall S pecifìcations 10 Years Later-R. A. MJLLETT,
     J. Y. PEREZ, ANO R. R. OAVIOSON                                                42
                                    HAZARDOUS      W ASTE
Slurry Trench Cut-Off Walls for Environmental Pollution Control-
       w. E. GRUBE, JR.                                                             69
Composite Barrier Slurry W ali-N.   J.   CAVALLI                                    78
New Trenching Method Using Synthetic Bio-Polymers-G. R. TALLARO                     86
Soil-Pollution Effects on Geotextile Composite Walls-H. Y. FANG, s, PAMUKCU,
       ANO R. C. CHANEY                                                            103
Using Slurry Walls to Protect an Historic Building: A Case Study- R. G. GARVIN
      ANO J. F. BOWARO                                                             117
Effects of Construction of a Diaphragm W ali Very Close to a Masonry Building-
       s. F. CHAN ANO T. F. YAP                                                    128
Design a nd Construction of Cement-Bentonite Cutoff W ali for S. A. Murray, Jr.,
      H ydroelectric Station-K. RAMACHANORA ANO C. H. SWAN                         140
Concrete Slurry W ali for Temporary and Permanent Foundation W ali at Gallery at
      H arborp)ace-Baltimore, Maryland-o. G. GIFFORO ANO J . R. WHEELER            15 1
-------------------------------------------------
  S lurry Wall Performance Adjacent to Historic Church- E. w. WINTER,
          T. S. NOROMARK, ANO G. TALLARD                                               164
  Materials for S lurry Walls in Waste Chemicals-R.     P.   KHERA
        ANO R. K. TIRUMALA                                                             172
  Innovative Aspects of Leachate Containme nt with Composite S lurry Walls: A Case
        His tory-M. MANASSERO ANO C. VIOLA                                             181
  Underreamed Drilled S hafts lnstalled Using S lurry Methods- o. A. SCHOENWOLF
        ANO D. J. DOBBELS                                                              194
  Deep Foundation Elements lnstalled by Slurry W ali Techniques- E. G. JOHNSON,
        K. E. JOHNSON, ANO C. M. ERIKSON                                               207
  Quality Control of S lurry C utoff W ali Installations- R. A. BELLANO J. L. SISLEY   225
  Construction of Diaphragm Wall a t Wells Dam East Embankment-
        o . L. ROBERTS ANO D. M. HO                                                    235
  Plastic Concrete S lurry WaJI for Wister Dam-E. o . ERWIN ANO J. M. GLENN            251
                                       SEEPAGE CUTOFFS
  Design and Construction of a Plastic Concrete C utoff W ali for the Island Copper
        Mine-R. R. DAVIDSON, G. DENISE, B. FINDLAY, ANO R. B. ROBERTSON                27 1
  Design, Construction and Performance of a Soil-Bentonite Cutoff W ali Constructed
        in T wo Stages-M. A. KHOURY, P. H. FAYAD, ANO R. S. LADD                       289
  Seepage CutoffWall for Mud Mountain Dam-R. R. DAVISON, J. LEVALLOIS, ANO
        K.GRAYBEAL                                                                     309
  The Construction of "Thin" S lurry Walls and the Supporting Liquid Slurries
        Used-H. C. M. BREEK                                                            324
  State ofthe Art in Bio-Polymer Drain Construction-s. R. DAY ANO c. R. RYAN           333
                                          STRUCTURAL
  Performance of an Internally Braced Slurry-Diaphragm W ali for Excavation
        S upport-N. A. BONO, T. K. LIU, ANO C. SOYDEMIR                                347
  Post Office Square Garage Project- A Case History of Instrumented Slurry W ali
        Performance-o. A. SCHOENWOLF, R. V. WHITMAN, E. L. ABBOTT,
        ANO J. M. BECKER                                                               361
QuaJity Contro l in Construction of Structural a nd Diaphragm W a li Joints -
       K. H. L.EE, C. D. OU. ANO K. W. TSAI                                       377
Design, Constru ction and P erformance of a Deep Circular Diaphragm W all-
      o. A. BRUCE, P. H. C. CHAN, ANO G. J . T AMARO                              391
P ermanent Slurry Walls a t Ba!timore Metro's Shot Tower Station- A. PA TEL ANO
      R.CASTELLI                                                                  403