0% found this document useful (0 votes)
235 views1 page

Assignment 1

This document provides instructions for an assignment on process control and instrumentation for an M.Tech course. Students are asked to: 1) Draw process diagrams and convert to block diagrams for various control systems including a geyser, anaerobic digester, hot water tanks, and more. 2) Identify control objectives and variables for penicillin manufacturing and discuss the process in a block diagram. 3) Draw a control diagram for a process furnace that heats a stream to 300°C, identifying control strategy elements such as objectives, inputs, outputs, disturbances, and more.

Uploaded by

om prakash verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
235 views1 page

Assignment 1

This document provides instructions for an assignment on process control and instrumentation for an M.Tech course. Students are asked to: 1) Draw process diagrams and convert to block diagrams for various control systems including a geyser, anaerobic digester, hot water tanks, and more. 2) Identify control objectives and variables for penicillin manufacturing and discuss the process in a block diagram. 3) Draw a control diagram for a process furnace that heats a stream to 300°C, identifying control strategy elements such as objectives, inputs, outputs, disturbances, and more.

Uploaded by

om prakash verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

उपकरणीकरण एवं नियंत्रण अभियांत्रत्रकी वविाग

Department of Instrumentation and Control Engineering

M.Tech (ICE) 1st Semester


Subject: Process Control and Instrumentation
Faculty Coordinator: Dr. Om Prakash Verma
Date of Assignment: 6 August 2018
Last date of Submission: 23 August 2018

Assignment-1
1. Draw sketches of process or operations, control process diagrams and then convert to various different control
system configurations in terms of block diagrams which are possible with transfer functions
(a) Geyser (b) Anaerobic digester for level and pressure
control to produce methane gas
(c) Hot water tank for home heating (d) Hot water heater for home with thermostat
(e) Stirred tank heater for temperature control with (f) A blending process
steam or electricity
(g) Distillation column control in polymer manufacture (h) Taking shower
(i) Heat Exchanger in Process Industry (j) A stirrer tank heater
(k) Furnace combined with a heat exchanger for feed (l) A fermenter process variables
fluid heating
(m) Drug infusion control for critical care patient to (n) pH control of lactic acid fermentation
maintain mean arterial pressure and cardiac output

2. A pharmaceutical company wants to manufacture Penicillin. Identify the control objective and all the
variables. Discuss the process through a block diagram with control schematics.

3. A process furnace heats a process stream from near ambient temperature to a desired temperature of 300°C.
The process steam outlet temperature is regulated by manipulating the flow rate of fuel gas to the furnace.
Draw the control diagram and identify the following
(a) Objective of the control strategy
(b) Measured output
(c) Manipulated Output
(d) Possible disturbances
(e) Is this a continuous or batch process?
(f) Is this a feed forward or feedback controller?
(g) Should the control valve fail open or fail closed? For the strategy you choose. Is the valve gain positive or
negative? Explain it reason.
(h) Discuss safety, environmental and economic issues.
(i) Draw the control block diagram and level all signals and blocks on the diagram.

You might also like