     Product Features 							
     MIP-Method (Main beam-Infill beam-Plywood)	 		
                                                        2
     Typical Application							                         4
     PMD-Method (Panel – Main beam – Drop head)			      5
     PMD Method								                                 6
     PMD Method assembly						                          7
     PMD Method Filler Solutions With 18 mm Plywood		   9
     Panel Method						                                 10
     Design tables						                                11
     Components							                                  13
    Product Features
    The requirements for an economic
    and safe solution for a slab formwork
    vary alot in the different construction
    project.
    It depends on:
    • Floor plan
    • Size of the different rooms
    • Floor height
    • Slab thickness
    • Number of reuses
    • Concrete surface expected
    The conception of the ALUDEC system       Drophead
    covers the most important slab form
    methods just in one system!
    •This means using the same parts in
    the different applications, also mixing
    the different Aludec methods-MIP and
    PMDdepending on the requirements
    of the floor plan.
    •The availability of choosing between
    separate plywood (MIP method) or
    panels with implemented plastic–long
    life-plywood (PMD method).
    •The reduction of the labor cost due
    to the few intensive adjustments on
    the jobsite.
    •The simplicity of the system reduces
    the mistakes in handling and makes
    the workers safer.
                                                         PMD method
                                                         MIP method
2
MIP-Method (Main beam-Infill beam-Plywood)
•This method depends on using a
mainbeam fit in a drop-head, together
with an infill-beam connected in the
same level.
•The plywood then can be placed over
all parts.
•Infill-beams could be used separately
with the twin-head and being fit cross
to another infill-beam.
•Drop-Head principle allows striking                          Infill beam fit on the main beam
after 1 day depending on slap
thickness and concrete strength.
The main beams have 9 different
lengths:
•Main-beam 60 cm, 90 cm, 120 cm,
150cm, 180 cm, 210 cm, 225 cm, 240
cm and 360 cm.
Infill beams have 4 different lengths:
•Infill-beam 90 cm, 120 cm, 150 cm
and 180 cm.                                      Infill beam fit on on another infill beam for infill solution
                                                                                  Infill-beam can fit anywhere on the
                                                                                  Mainbeamaccording        to  permissible
                                                                                  plywood spacing and according to the
                                                                                  load on the infill beam.
                                                                                  Plywood 18 mm is placed on the Infillbeam
Infill-beams   are   mounted     on   the
twinhead.
Secure the Infill-beams with the safety     The smart design of the Infill beams allows the main and secondary infill
bolt.                                       beams to be on the same level.
                                                                                                                              3
    Typical Application
    •Typical application for MIP method
    where using infill beams with main
    beams and drop heads.
    •Different sizes of mean beams could
    fit through the drop-head.
    •The smart design of the drop-head
    allows 4 cm drop in the system for
    early striking, which allows reusing
    the decking beams for the next
    concreting cycle.
    Typical application for MIP method     Main beams with Infill beams showing the flexibility of the system and
    where using Infill beams with infill   solving the infill areas with the same components
    beams as main and secondary
    beams.
                                           Only infill beams and twin heads are used, minimizing the components used.
                 Infill beam
4
PMD-Method (Panel – Main beam – Drop head)
•This method depends on using
mainbeams fit in drop-heads-for
early strikingthen the panels are
placed over the mainbeam.
•The panels are implemented with
plywood.
•The panels are placed totally
independent from the position of the
drop-head and the length of the
mainbeam.
•This makes an easy adjustment in
the middle of the room without any
additional support.
•The number of props is settled by
the system, which means no error in
handling.
•Early Striking and fast cycling of    The Aludeck could be used with any of Acrow shoring systems
slab form comes to a reduction of
material investment up to 40%,
simplify the logistics and man power
and reducing the cost accordingly.
•This system can be one of the
fastest and cost effective solutions
for many projects.
                                                                                                     5
    PMD Method
    Panels overview:
    The panels have 9 different sizes
    Panels used for slab thickness up to
    35 cm :
    ADP 150 x 75
    ADP 150 x 60
    ADP 150 x 30
    ADP 75 x 75
    ADP 75 x 60
    Panels used for slab thickness up to
    25 cm :
    ADP 180 x 60
    ADP 180 x 30
    ADP 90 x 60
    ADP 90 x 30
                                            Massive corner for fixing and protection
                                                    Aluminum profile, powder-coated
    Cross struts, for convenient handling
                                                                       12 mm plywood
6
PMD Method assembly
                              Twin head or beam head
  Prop head
Start in the corner using beam head        Panels are then fixed easily on the     Continue erecting the main beams
or twin head with the main beam as         1st 2 main beams.                       with the drop heads for early striking.
in Figure 1.
          Twin head secured                              Beam head                               Prop head
                                                                                   Alu filler beam
                                               Fix the panels in both directions   Alu filler beam is inserted between
                                                                                   the drop heads.
                                                                                   Continous setting of panels without
                                                                                   any fixing points between.
                                                                                                                             7
    PMD Method Assembly
    With the connection MB 90, it is
    possible to connect 2 main beams
    perpendicular on each other. Mainly
    used for open corner edges.
                                               for fixing the prop to the main beam
    For Safety, The Alu-deck end support
    for fixing handrails at the edges of the
    building.
                                               for fixing the handrail to the end
                                               support.
8
PMD Method Filler Solutions With 18 mm Plywood
                                                 Filler with compensation beams
                                                 Filler with infill beams
                                                 Filler with timber 2 x 4
                                                                                  9
     Panel Method
     Only panels and panel-heads.
                                                                                            for corner support
     The self-feeding panels are directly
     supported by a panel-head.
     The crown head is used:
     •In the cross point of 4 panels panels.
     •To support 2 panels on a wall.
     •Even in the corner to start the
     system.                                                                                for supporting 2 panels
                                                                                            cross point of 4 panels
                                      Typical assembly for panel method without any beams
10
Design tables
These tables allow for a live load of
20% of the self-weight of the fresh
concrete, but not less than 1.5 kN/m².
  Distance between main beams 75 cm                      Load on prop [kN]
   Slab thickness        Total load      Main-beam   Main-beam      Main-beam   Main-beam
        [cm]              [kN/m2]           120         150            180         240
         12                 4,9            4,4         5,5             6,6        8,8
         14                 5,4            5,0         6,1             7,3        9,7
         16                 5,9            5,4         6,6             8,0        10,6
         18                 6,4            5,9         7,2             8,6        11,5
         20                 7,0            6,5         7,9             9,5        12,6
         22                 7,5            6,9         8,4             10,1       13,5
         24                 8,0            9,4         9,0             10,8       14,4
         26                 8,5            7,9         9,6             11,5       15,3
         28                 9,0            8,3         10,1            12,2       16,2
         30                 9,6            8,9         10,8            13,0       17,3
         32                10,0            9,2         11,2            13,5       18,0
         34                10,6            9,8         11,9            14,3       19,1
         36                11,2            10,3        12,6            15,2       20,2
         38                11,9            11,0        13,3            16,0       21,3
         40                12,7            11,7        14,3            17,1       22,9
         50                15,9            14,7        17,9            21,5       28,6
  Distance between main beams 150 cm                     Load on prop [kN]
   Slab thickness        Total load      Main-beam   Main-beam      Main-beam   Main-beam
        [cm]              [kN/m2]           120         150            180         240
         12                 4,9            8,8         11,0            13,2       17,6
         14                 5,4            9,7         12,2            14,6       19,4
         16                 5,9            10,6        13,3            15,9       21,2
         18                 6,4            11,5        14,4            17,3       23,0
         20                 7,0            12,6        15,8            18,9       25,2
         22                 7,5            13,5        16,9            20,3       27,0
         24                 8,0            14,4        18,0            21,6       28,8
         26                 8,5            14,3        19,1            23,0       30,6
         28                 9,0            16,2        20,3            24,3       32,4
         30                 9,6            17,3        21,6            25,9       34,6
         32                 10,0           18,0        22,5            27,0       35,9
         34                 10,6           19,1        23,9            28,6       38,2
         36                 11,2           20,2        25,3            30,3
                                                                                            11
     Design tables
      Distance between main beams 180 cm                              Load on prop [kN]
        Slab thickness        Total load       Main-beam        Main-beam        Main-beam   Main-beam
             [cm]              [kN/m2]            120              150              180         240
             12                  4,9               10,6             13,2            15,9       21,2
             14                  5,4               11,7             14,6            17,5       23,3
             16                  5,9               12,7             15,9            19,1       25,5
             18                  6,4               13,9             17,3            20,7       27,6
             20                  7,0               15,1             18,9            22,7       30,2
             22                  7,5               16,2             20,3            24,3       32,4
             24                  8,0               17,3             21,6            25,9       34,6
             26                  8,5               18,4             23,0            27,5       36,7
             28                  9,0               19,5             24,3            29,2       38,9
             30                  9,6               20,8             25,9            31,1
             32                  10,0              21,6             27,0            32,3
             34                  10,6              22,9             28,6            34,3
             36                  11,2              24,2             30,3            36,4
                  Panel method                       Load on prop [kN]
      Slab thickness [cm] Total load [kN/m2]   Panel 150 x 75   Panel 180 x 60
             12                  4,9               5,5              5,3
             14                  5,4               6,1              5,8
             16                  5,9               6,6              6,4
             18                  6,4               7,2              6,9
             20                  7,0               7,9              7,6
             22                  7,5               8,4              8,1
             24                  8,0               9,0              8,6
             26                  8,5               9,6              9,2
             28                  9,0               10,1             9,7
             30                  9,6               10,8             10,4
             32                  10,0              11,2
             34                  10,6              11,9
             36                  11,2              12,6
12
Components
       Item   Description      Code no.       Weight (kg)
                Panel ADB
               ADP 75 x 60    6221177062118       8.52
               ADP 75 x 75    6221177062101      10.38
               ADP 90 x 30    6221177062095       6.98
               ADP 90 x 60    6221177062088       9.58
               ADP 150 x 30   6221177062071      10.80
               ADP 150 x 60   6221177062064      15.64
               ADP 150 x 75   6221177062514      18.32
               ADP 180 x 30   6221177062057      12.90
               ADP 180 x 60   6221177062040      19.15
               Main Beam
                ADMB 60       6221177062200       3.37
                ADMB 90       6221177062194       4.88
               ADMB 120       6221177062187       6.58
               ADMB 150       6221177062170        8.3
               ADMB 180       6221177062163        9.8
               Main Beam
               ADMB 210       6221177062156       15.2
               ADMB 225       6221177062149      16.23
               ADMB 240       6221177062132      17.47
               ADMB 360       6221177062125      26.18
               Infill Beams
                 ADIB 90      6221177062248       4.86
                 ADIB 120     6221177062231       6.66
                 ADIB 150     6221177062224       8.45
                 ADIB 180     6221177062217      10.25
                                                            13
     Components
             Item       Description            Code no.       Weight (kg)
                    ALU -Filler Beam 151/Lm
                        AFB 151/0.50 m        6221177062385       1.35
                        AFB 151/0.80 m        6221177062378       2.16
                        AFB 151/1.10 m        6221177062361       2.97
                        AFB 151/1.40 m        6221177062354       3.79
                        AFB 151/1.70 m        6221177062347       4.60
                    ALU -Filler Beam 176/Lm
                        AFB 176/2.00m         6221177062323       5.97
                        AFB 176/2.15 m        6221177062316       6.42
                        AFB 176/2.30 m        6221177062309       2.87
                        AFB 176/3.50 m        6221177062293      10.45
                      Alu-Deck Drop head      6221177062255       8.92
                      Alu-Deck Prop head      6221177080235       2.76
14
Components
       Item     Description               Code no.       Weight (kg)
              Alu-Deck Beam head         6221177058685       2.57
              Alu-Deck Twin head         6221177080266       2.76
              Alu-Deck Panel head        6221177080259       1.45
              Alu-Deck End support       6221177058432       2.5
              Alu-Deck MB90 connection   6221177058425       2.6
                                                                       15
                                                                            acrow
               acrow
                                                                    5
                                       7
                                                                                            acrow
    acrow
                                                                           acrow
1   Egypt                              2   KSA                               3   Kuwait
    Acrow Misr                             Acrow Al saudia Ltd co.               Khalid Ali, Al Kaharafi
    Head Office, Factory:                  P.O.Box : 305746-Riyadh-11361         & Bros. Co. W.LL
    Wady Houf, Helwan                      Saudi Arabia Riyadh branch:           Tel: +965 4813 127 / 4817 289
    Tel: +202 23690 616 / 23690 739        Tel : +966 1 2160504
                                           Fax : +966 1 2160503
                                                                  acrow          Fax: +965 4835 501
          +202 23695 700 / 23699 976                                             E.mail: acrowkuwait@acrow.co
    Fax: +202 23695 260                    Email : acrowriyadh@acrow.co
    E.mail: info@acrow.co
                                           Jeddah branch:
    Alex Branch                            Tel : +966 2 639 16 24
    27 Dr. mahmoud Daoud st.,              Fax :+966 2 691 85 45
                                           Email : acrowjeddah@acrow.co
                                                                             4   Libya
    Tel: +203 4200 289
                                                                                 Acrow Tripoli
    E.mail: acrowalex@acrow.co
                                                                                 Tel: +218 91 411 6873 / 91 331 9367
                                           Damam branch:                                 acrow
                                                                                 Fax: +218 21 351 3838
    Port Said Branch                       Tel: +966 3 8054151
                                                                                 E.mail: acrowlibya@acrow.co
    El freepor Bulding
    Tel: +2066 3232542
    acrowportsaid@acrow.co
    acrow
                                                                            3                                 acrow
      1                                                                            9                 8
                                                                   2
                                                                                                         6
                                                                                             acrow
                                                   acrow
5   Algeria                                    6    Oman                               7   Morocco
    ACROW-DZ COMPANY                                Acrow Muscat                           38 Rue Abou El Waqt, Res
    Tel: +213 (0) 21 75 54 74/63/64                 Tel: +968 9828 76 82                   Haydar El Jarrah, Rez
    Tel: +213 (0) 21 50 55 58                       E.mail: acrowmuscat@acrow.co           Chausser No. 10
    Fax: +213 (0) 21 50 55 58                                                              Casblanca
    Address : Siege Social cité des travailleurs                                           e-mail: acrowmorocco@acrow.co
    lot. 09 groupe 02 Dar El beida, Alger
    Email : acrow-dz@acrow.co
8   UAE                                        9    Qatar
    Acrow Gulf                                      Acrow Qatar
    Tel: +971 4343 94 98                            Tel: +974 4582 357                        acrow
     acrow
    Fax: +971 4343 95 98
                                                      acrow
                                                    Fax: +974 4582 376
    E.mail: acrowgulf@acrow.co                      E.mail: acrowqatar@acrow.co
                                                      Acrow H20 & solider          Acrow One shutter solider
Acrow V.M.C                   Acrow Tech-Form         Acrow Cuplock                Acrow Bridge table form
Acrow Circular column         Acrow climbing system   Acrow shorbrace Table form   Acrow Big steel panel
Acrow European prop           Acrow Vari form         Acrow Prop table form        Acrow frame
                                                                                                               02/2013, Code No.: 2007050060992
                                                                  w w w. a c ro w. c o
Acrow early striking system   Acrow Ring lock