Variation Order Request Form

This document is a request for a variation order regarding an existing line item. It notes that the variation order is regarding a bearing for an existing line item. The contractor engineer signed and dated the request. The chief engineer or construction supervision manager can approve or not approve the request and provide comments. Final approval is needed from the senior engineer in procurement and potential additional approval from the SMT if the variation order exceeds 25%.

Uploaded by

Syed Ayaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views2 pages

Variation Order Request Form

This document is a request for a variation order regarding an existing line item. It notes that the variation order is regarding a bearing for an existing line item. The contractor engineer signed and dated the request. The chief engineer or construction supervision manager can approve or not approve the request and provide comments. Final approval is needed from the senior engineer in procurement and potential additional approval from the SMT if the variation order exceeds 25%.

Uploaded by

Syed Ayaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Request for

Variation Order

Request number: ____1_____ New Item inclusion Existing Line Item Variation x

Issue:
1. Bearing

____________________________________
Contractor Engineer’s Name (printed) Signature
___________________________
Date

Accepted by the CCSI/Principal (shall sign only in case the scope is changed):

Recommendation: Approve  Do Not Approve 

R Comment:

_________________________________ ___________________________
Chief Engineer / Signature
Construction Supervision Manager Name (printed)
___________________________
Date

Procurement Department Approval:

_________________________________ ___________________________
Senior Engineer - Procurement Name (printed) Signature
___________________________
Date

SMT Approval (for VO Exceeds by more than 25%)


_________________________________ ___________________________
Team Leader Signature
___________________________