Hitex, Hyderadad 2018: Particulars Area in SQ - Mtrspower (KW) Rate (Inr) Days

The document outlines rental rates for event space at Hitex in Hyderabad in 2018. It provides details on the area, power capacity, rental rate per day, and total rental value for indoor and outdoor exhibition halls, construction/dismantling areas, and additional services like lighting, housekeeping, and stall fabrication. The total rental cost before taxes is over 30 million Indian rupees, and adding 18% GST results in a final total rental value of over 36 million Indian rupees.

Uploaded by

kavenindia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views4 pages

Hitex, Hyderadad 2018: Particulars Area in SQ - Mtrspower (KW) Rate (Inr) Days

The document outlines rental rates for event space at Hitex in Hyderabad in 2018. It provides details on the area, power capacity, rental rate per day, and total rental value for indoor and outdoor exhibition halls, construction/dismantling areas, and additional services like lighting, housekeeping, and stall fabrication. The total rental cost before taxes is over 30 million Indian rupees, and adding 18% GST results in a final total rental value of over 36 million Indian rupees.

Uploaded by

kavenindia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Hitex, Hyderadad 2018

Particulars Area in sq.mtrsPower (KW)


RATE (INR) DAYS
Hall -1&2&3 Indoor (Construction) 10500 110 3
Hall -1&2&3 Indoor (Exhibition) 10500 185 3
Hall -1&2&3 Indoor (Dismantling) 10500 110 1
Outdoor Hall 4 (Open Event Area)
Non A/c (Construction) 18500 70 3
Outdoor Hall 4 (Open Event Area)
Non A/c (Event) 18500 110 2
Outdoor Hall 4 (Dismantling) 18500 70 1
Outdoor Hall 5 (Open Event Area)
Non A/c (Construction) 7500 110 3
Outdoor Hall 5 (Open Event Area)
Non A/c (Event) 7500 70 2
Outdoor Hall 5 (Open Event Area)
Non A/c (Dismantling) 7500 70 1
Lighting charges & Electricity & Security 150000 0 6
House Keeping (Indoor) (Hall 1&2&3) 10500 15 6
House Keeping (Outdoor) (Hall 4&5) 26000 15 6
Stall Fabricaiton cost 3500
Sub Total
Add: 18%
TOTAL
VALUE (INR)
3465000
5827500
1155000

3885000

4070000
1295000

2475000

1050000

525000
900000
945000
2340000
3000000
30,932,500
5,567,850
36,500,350
Hitex, Hyderadad
Particulars Area in sq.mtrsRATE (INR) DAYS

Hall -1&2&3 Indoor (Construction & Dismantling) 10500 110 3

Hall -1&2&3 Indoor (Exhibition) 10500 185 3

Hall - 4 Indoor - Under Construction


8000
(Construction & Dismantling)

Hall - 4 Indoor - Under Construction (Exhibition) 8000

Outdoor Hall 4 (Open Event Area)


18500 70 3
Non A/c (Construction & Dismantling)
Outdoor Hall 4 (Open Event Area)
18500 110 3
Non A/c (Event)
Outdoor Hall 5 (Open Event Area)
7500 70 3
Non A/c (Construction & Dismantling)
Outdoor Hall 5 (Open Event Area)
7500 110 3
Non A/c (Event)

Sub Total

Add GST: 18%

TOTAL
VALUE (INR)

3465000

5827500

3885000

6105000

1575000

2475000

23,332,500

4,199,850

27,532,350