Jib Crane Fabrication & Erection Costs

This document provides a cost estimate for fabricating and erecting 8m and 4m jib cranes at an SML factory in BSRM. It lists material and labor costs over the projected number of days. Material costs include cranes for erection and assembly, electrodes, scaffolding. Labor requirements include fabricators, laborers, welders, riggers, supervisors and engineers. Additional costs include machinery rental, electricity, and PPE equipment. The total estimated cost for fabrication is BDT 1,515,083 and for erection is BDT 3,737,903, including a 16.5% profit margin.

Uploaded by

Md Rahul Hossain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views8 pages

Jib Crane Fabrication & Erection Costs

This document provides a cost estimate for fabricating and erecting 8m and 4m jib cranes at an SML factory in BSRM. It lists material and labor costs over the projected number of days. Material costs include cranes for erection and assembly, electrodes, scaffolding. Labor requirements include fabricators, laborers, welders, riggers, supervisors and engineers. Additional costs include machinery rental, electricity, and PPE equipment. The total estimated cost for fabrication is BDT 1,515,083 and for erection is BDT 3,737,903, including a 16.5% profit margin.

Uploaded by

Md Rahul Hossain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Job : Fabrication of 8 m and 4 m Jip crane as per Drawing @ SML factory , BSRM

Total weight of STEEL structure in TONAGE


Consumable Material Cost Unit Quantity No of Days Rate (BDT)
MOBILE CRANE 35Tons 30 m Boom for Erection EA 30 35000
MOBILE CRANE 10 Tons for Assembly EA 1.00 15 20000
1
Electrode E 7018 KG 250.00 290
Scaffolding SFT
EA

Quantity/ Per day rate


Manpower (8 Hours) Unit No of Days
person (BDT)
Fabricator 4 1200 32.00
Un_skill Labour 8 800 32.00
Welder 4 1400 32.00
Un_skill Labour 4 800 32.00
Rigger 1 900 32.00
2 Supervisor 1 1500 32.00
Engineer 1 1600 32.00

0
Per day rate
Others Cost (Approx.) No of Days
(BDT)
3 Various Machinary ( welding ,Grainding)Cost Lumpsum 3000 32.00
Electricity/ Generator Cost Lumpsum 1000.00 32
3

PPE for safety Lumpsum 1000.00 32

Total Cost for 8m & 4m JIP Crane 65


Profit + Over head 16.50%
Grandtotal Cost for 8m & 4m JIP Crane 65
65
Total Amount (BDT)
0.00
300,000.00
72,500.00

0.00
372,500.00
Per day rate (BDT)
153,600.00
204,800.00
179,200.00
102,400.00
28,800.00
48,000.00
51,200.00
-
-
-
-
-
-
768,000.00
Per day rate (BDT)
96,000.00
32,000.00
32,000.00
160,000.00

1,300,500
214,583
1,515,083
Job : Erection of 8 m and 4 m Jip crane as per Drawing @ SML factory , BSRM
Total weight of STEEL structure Erection in TONAGE
Consumable Material Cost Unit Quantity No of Days Rate (BDT)
MOBILE CRANE 30/35 Tons 30 m Boom for Erection EA 1.00 45 30000
1 Electrode E 7018 KG 100.00 290
Scaffolding SFT 280.00 45 30
EA

Quantity/ Per day rate


Manpower (8 Hours) Unit No of Days
person (BDT)
Fabricator 2 1200 45.00
Un_skill Labour 12 800 45.00
Welder 2 1400 45.00
Un_skill Labour 4 800 45.00
Rigger 1 900 45.00
Supervisor 1 1500 45.00
2 Engineer 1 1800 45.00
Electric works, Panel board installation 10 2500 10.00
,commissioning ,Hook setting & load testing etc

0
Per day rate
Others Cost (Approx.) No of Days
(BDT)
3 Various Machinary ( welding ,Grainding)Cost Lumpsum 2000 45.00
Electricity/ Generator Cost Lumpsum 1000.00 45
3

PPE for safety Lumpsum 1500.00 45

Total Cost for 8m & 4m JIP Crane 72


Profit + Over head 16.50%
Grand Total Cost for ton crane 72
72
Total Amount (BDT)
1,350,000.00
29,000.00
378,000.00
0.00
1,757,000.00
Per day rate (BDT)
108,000.00
432,000.00
126,000.00
144,000.00
40,500.00
67,500.00
81,000.00

250,000.00

-
-
-
-
-
1,249,000.00
Per day rate (BDT)
90,000.00
45,000.00
67,500.00
202,500.00

3,208,500
529,403
3,737,903