This document provides guidelines for installing fire hydrants, including requirements for pipe sizing, location considerations, protection methods, testing procedures, and standard hydrant models. Key requirements include supplying hydrants from mains 6 inches or larger, locating them at least 40 feet from buildings with paved access, installing thrust blocks and valves, using break-off risers, pressure testing lines, and marking new hydrants with reflective markers.

Uploaded by

Harikrishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
231 views2 pages

Fire Hydrant Installation Guidelines

This document provides guidelines for installing fire hydrants, including requirements for pipe sizing, location considerations, protection methods, testing procedures, and standard hydrant models. Key requirements include supplying hydrants from mains 6 inches or larger, locating them at least 40 feet from buildings with paved access, installing thrust blocks and valves, using break-off risers, pressure testing lines, and marking new hydrants with reflective markers.

Uploaded by

Harikrishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Capital Projects Home Page

Fire and Life Safety - 05 - Fire Hydrant Types and Installation


Detail

1. Fire hydrants shall be supplied from not less than a 6" diameter main. When dead end
pipe runs exceed 300 feet, they are to be a minimum of 8" in diameter and when pipe
runs exceed 600 feet, they are to be a minimum of 10" in diameter (NFPA 1141).

2. Underground piping systems for buildings other than light-hazard occupancies and dead-
end pipe which supplies both sprinklers and hydrants shall not be less than 8" in size
(NFPA 13).
3. Fire hydrants on private property shall have designated"No Parking" zones identified by a
red painted curb or signage.
4. Fire hydrants installed in locations without curbs shall be protected by installing guard
posts as indicated in the drawing that is indicated in this section.
5. All fire hydrants must be installed and in operable condition prior to starting construction.
6. Consideration shall be given to the following items when locating fire hydrants.
a.Locate approximately 40 feet or greater from any building.

b.Provide access to hydrant by paved road of sufficient size


for parking fire apparatus.

c.Protect any hydrant located at the toe of a bank from slides


by means of a retaining wall.

d.Assumed or known soil bearing load.

e.Maintain a minimum 3 foot clear space around the


circumference of the fire hydrants.

f. Install a gate valve in the hydrant branch with a christy box


and cover. Cover to be painted white.

g.Install a gate valve in the hydrant branch, with cast iron


valve box and cover.

h.Berkeley Campus Fire Hydrant Standard: Clow Mfg.


Company model No. 860 equivalent or equal, with two 2-
1/2-inch and one 4-1/2-inch outlets having National
Standard Threads.
7.
8. Install concrete thrust blocks with steel (reinforced bar in concrete) at all changes in
direction in lines having joints that may slip or creep apart under pressure. Thrust
blocks/rod and clamp with 3/4-inch stainless steel rod, using mechanical joint piping. See
Appendix X, Typical Water Service & Piping Systems.
9. Pour all thrust blocks against undisturbed earth in trench cuts.
10. Provide the following thrust block data on the plans.
a.Design pressure on line.

b.Test pressure for line.

c.Location of thrust blocks.

d.Assumed or known soil bearing load.

Bearing area on soil, in square feet for each type fitting (tee,
e.
elbow, etc.).

f. Typical installation details on drawings.


11.
12. All new fire hydrant installations shall include a break-off riser to protect the hydrant
body and bury from breakage when struck by a vehicle.

Note: Any alterations to existing systems shall use break-off riser as noted above.

13. All underground lines, hydrants, etc., shall be hydrostatically tested at 200 lbs. for 2
hours.

14. All underground lines, hydrants, etc., shall be flushed using approved methods as per
NFPA Standards.
15. Flow testing on hydrants located on campus or on University-owned property shall be
witnessed by the Campus Fire Marshal. Flow testing on off-campus sites will be
witnessed by the appropriate local fire department and coordinated through the Campus
Fire Marshal.
16. Any new fire hydrant shall have a blue dot reflective marker installed on the street surface, so as
to make the hydrant visible to responding Fire Department personnel.

<> Return to Fire and Life Safety Table of Contents

You might also like