NCR-PS 001

This non-conformance report documents an issue with a contract between two parties. It provides details of the non-conforming activity and was submitted to the contractor's project manager. The contractor was required to return the form within 7 days with a proposed corrective action plan and copies to the project manager. The corrective action was either accepted or rejected by the project manager, and the contractor then took the appropriate action to resolve the non-conformity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views1 page

NCR-PS 001

This non-conformance report documents an issue with a contract between two parties. It provides details of the non-conforming activity and was submitted to the contractor's project manager. The contractor was required to return the form within 7 days with a proposed corrective action plan and copies to the project manager. The corrective action was either accepted or rejected by the project manager, and the contractor then took the appropriate action to resolve the non-conformity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Non Conformance Report.

Contract NO: Contract Name:

Report No: Detail of Activity:

For Project Manager: Post: Signature: Date:

Detail of non-conformity:

Received for Contractor:


Post: Signed: Date:

NCR original 1 to be returned with CAP within 7 days with 2 copies to Project Manager
Attachment: Check list or inspection report.
Corrective action proposed (CAP)/taken: Date:

Details:

Signed for contractor:

Proposal : accepted/rejected

Concession granted: Yes/No Signed for Project Manager: …………………….. Date:


Corrective action carried out satisfactorily. Item now complies with Contract Documents / conceded
Action Review:

NCR Closed out: Yes/ No Signed for Project Manager: …………………… Date:

Remarks:(include details, if closeout not achieved and matter becomes subject of correspondence, including letter reference)

Signed: