DAILY REPORT OF ENGINEERING SUPERVISION
Today Weather: Morning:                                                                   Date: 14Mei-2018
Construction                                                                        31st
                                                                                             Actual
period           1.794 days                                                         Jul,2022
                                                                                             completion
                                                                                             Date
                                                                                             Original:
Change Order No.
                                                                                    Contract
Planned Construction                                                                Price    After change:
Progress (%)
2. Supervision on Construction Work (including checking point, construction inspection , etc.):
3. Specification and Quality of Material (including checking point, material and equipment control point, inspection
   and sampling, etc.):
4.
Supervised:                           Checked:                       Approved:
DAILY REPORT OF ENGINEERING SUPERVISION