Relocation Project

This document summarizes a project to evaluate relocating the distribution center for Farmasa-Schwabe México. The current location in Tultitlan has several operational challenges, including two separate warehouse buildings 120 meters apart, insufficient space, and flooding issues. A market analysis found that competitors are moving their distribution centers north. To define relocation needs, over 900 pallet locations would be needed to support current and projected inventory levels over 10 years. The document recommends relocating to a new, improved single-site distribution center with specifications that address the current location's deficiencies.

Uploaded by

Oskarlll
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
237 views23 pages

Relocation Project

This document summarizes a project to evaluate relocating the distribution center for Farmasa-Schwabe México. The current location in Tultitlan has several operational challenges, including two separate warehouse buildings 120 meters apart, insufficient space, and flooding issues. A market analysis found that competitors are moving their distribution centers north. To define relocation needs, over 900 pallet locations would be needed to support current and projected inventory levels over 10 years. The document recommends relocating to a new, improved single-site distribution center with specifications that address the current location's deficiencies.

Uploaded by

Oskarlll
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 23

Distribution Center Farmasa-Schwabe Mxico

Relocation Project

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Objective
Determine the effectiveness and productivity of the Farmasa DCs Location and evaluate whether should relocate, and if so what would be the urgency of this relocation

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Content
Current Location Operational Challenges Density of Distribution Distribution Zone 2011 New Distribution Zone 2013

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Current Location
Tultitlan, State of Mxico
Condominium Don Francisco

Distance
35 km North of Bfalo Office 155 km North from Manufacturing Plant Xochitepec

Transit Time
1.5 hrs from Bfalo Office 3.0 hrs from Manufacturing Plant

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Current Warehouse

Current Warehouse

Current Location Warehouse A


Renting since Dec-03 Total Area, 913 m Warehousing Finished Goods COFEPRIS License GMP Compliance

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Current Location Warehouse H


Renting since Jul-09 Needed because K&N our 3PL closed down Total Area, 873 m Warehousing packing and promotional items Non GMP area

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Current Buildings Specifications


Business Condominium: Building Name: Total Leasable Area: Land Size: Roof System: Clear Height: Bay Size: Drive in doors: Locations: Construction Type: Dock Height: Slab Thickness: Number of Docks: Truck Court: Parking Spaces: Skylights Office Area 5.4 m - 7.00 m 8 m x 16 m 0 733 Concrete Block 1.25 m 10 cm 1 per warehouse 15 m 4+4= 8 "A"-0% , "H"-10% 65+95= 160 m2 Don Francisco "A", "H" 1,786 m2 1,986 m2

Operational Challenges
Logistic Operation
120 m between warehouse Carrying materials from one to the other Additional time and labor intense Double positioning for loading and unloading
H

Access A

120 m

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Operational Challenges
Warehouse

Structure

Irregular Shape Lower Ceilings Unusable space Double office space

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Operational Challenges
Dock Area Layout
Small receiving/shipping area High risk of mixing In (quarantine) and Out (approved) product

Actual Dock Layout


In

Out

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

Operational Challenges
Dock Area Layout
Small receiving/shipping area High risk of mixing In (quarantine) and Out (approved) product

Flooding Issues

Distribution Density
by Zones (Nov 2011)

Zone One 42% Zone Two 28% Zone Three 17% Zone Four 13%

17%

42% 28%

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

13%

14

Metropolitan Area
new zones (April 2013)
Zone 3

Zone 1 39% Zone 2 30%

Zone 1

Zone 3 17%
Zone 4 14%

Zone 2

Zone 4

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

15

Metropolitan Area
new zones (April 2013)

Marzam opens a DC in Ecatepec and closes down two centers Farmacos Especializados moves to north (Naucalpan) Nadro opens DC in Cuautitln Saba stills in Vallejo and Taxquea

Zone 1

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

16

Why Is Everybody Moving North


Building The Northern Industrial Corridor The conditions and structure are serving for industries seeking this northern area. There are many new developments in communication channels including good roads and highways that are facilitating and forming industrial parks and therefore transportation and logistic accommodations are giving in this area.

Francisco Genoves Distribution Center Manager and Oskar MunguiaSupply Chain Director

17

DCs Operational Challenges Summary


Leasing agreement expires on December 2013 Enough meters but in two separate buildings 120 meter between buildings Just one of the two building is GMP compliant None of these is fully in compliance with GWPs Lower ceilings cannot control temperature Roof leaks in building H a no isolation Dock layout inefficient (hectic) Small shipping/receiving area Flooding issues in this area Sanitary concerns Product losses

Relocate is better option


Because of all the operational challenges decided to relocate Associated with real state agent (tenant representative) Conducted a market research Evaluating new leasing agreement as an option Looking for a World Class (A+) warehouse Finding investor willing to build

Defining Needs and Specifications


Locations (space) requirements
Number of pallets according to desire inventory levels Including potential growth for the next ten years Results: about 900 locations 1,200 mts of location space, 200 shunting and 150 office space
Product Line Farmasa-Schwabe LeoPharma (3PL) Returns Quarantine Packaging Materials SNA Promotional Items Medical Samples Totals Full Pallets 183 19 36 108 95 20 100 80 641 Partial Total # of Pallets Pallets 47 8 0 0 0 0 0 0 55 230 27 36 108 95 20 100 80 696 Potential Growth (5 years) 265 30 40 119 114 23 101 88 779 Potential Growth (10 years) 304 33 44 131 137 26 102 97 873

Business Condominium: Building Name: Total Leasable Area: Land Size: Roof System: Clear Height: Bay Size: Drive in doors: Locations: Construction Type: Dock Height: Slab Thickness: Number of Docks: Truck Court: Parking Spaces: Skylights Office Area

Don Francisco "A", "H" 1,500 m2 1,800 m2 10 m-12 m 8 m x 16 m 1 900 Concrete Block 1.25 m 15 cm 2 15 m 8 "A"-0% , "H"-10% 150 m2

Racks