Foundation Slide

This document provides details on the design of a retaining wall along a rail route in Kuala Lumpur. It specifies the project parameters, including a 10 degree inclination, 20 kN/m^2 surcharge pressure, and a rising water table. A gravity retaining wall is selected over 5m high. Calculations are shown checking factor of safety against overturning and sliding, with pressures determined at the toe and heel. A cost calculation estimates expenses for construction.

Uploaded by

jeams_lead7020
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views18 pages

Foundation Slide

This document provides details on the design of a retaining wall along a rail route in Kuala Lumpur. It specifies the project parameters, including a 10 degree inclination, 20 kN/m^2 surcharge pressure, and a rising water table. A gravity retaining wall is selected over 5m high. Calculations are shown checking factor of safety against overturning and sliding, with pressures determined at the toe and heel. A cost calculation estimates expenses for construction.

Uploaded by

jeams_lead7020
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 18

RETAINING WALL DESIGN

CEGB423 FOUNDATION ENGINEERING


Project on RC Retaining Wall along Kuala LumpurKajang MRT route

Abdul Azim bin Abdul Raji


CE090390
Muhammad Al Hazim bin Yunus CE091967
Maheswaran a/l Salamba Durai CE087554

Introduction
Need to design retaining wall for 100m long
Criteria given:
Inclination due to horizontal = 10
Surcharge pressure = 20kN/m2
Rainy season, water table may rise 2.0m below
original ground level

Material Properties:
Unit weight of backfill (sand), sand = 18 kN/m2
Backfill cohesion, c = 0
Backfill friction angle, = 30
Wall- backfill friction angle, = 0.7
Unit weight of concrete, c = 24 kN/m3

Soil Profile ( from Borehole 1 and 2 )

Soil Profile
Borehole 1 has less total number of blows than

borehole 2, thus taking soil properties from


borehole 1 as consideration.
From SI report and soil profiling, it can be
concluded that Sandy Clay is the soil that
retaining wall need to be constructed on.
No of blows in Sandy Clay soil = 11 blows
clay = 19.64kN/m3
clay = 46.46
C2
= 154 kN/m2

Design Appraisal
Retaining wall height = 5m
Based on textbook page 418, cantilever

retaining wall is only suitable for wall height


more than 8m. Thus, we selected gravity
retaining wall type as design.
Gravity retaining wall depends on their own
weight and any soil resting on the RC for
stability.

Gravity Retaining Wall Dimension

Gravity Retaining Wall Dimension

Gravity Retaining Wall Design


Calculation (checking for FS
overturning)
Properties:
1 = 30
= 10
= 0.71 = 21
= 14

Ka

=
=
= 0.44 < 1 .. O.K !

Continue
Pa

= 1H2Ka

= (18)(5.159)2(0.44)
= 105.4 kN/m
Ph = Pa Cos (10+21)
= 90.35 kN/m
Pv
= Pa Sin (10+21)
= 54.29 kN/m

Continue
Overturning Moment Table:
Area No.

Area (m2)

Weight

Moment

Moment

(kN/m)

Arms (m)

(kN-m/m)

1.245

29.88

1.1

32.78

1.868

44.83

1.85

82.94

0.2075

4.98

0.917

4.567

2.975

71.4

1.75

124.95

Pv=54.29
V=205.38

B=3.5

PvB=190.0
15
=435.252

Continue
Mo

=Ph ()

=90.35(1.7197)
=155.37 kN-m/m
FS overturning

= =
= 2.8 > 2 O.K !

Gravity Retaining Wall Design


Calculation (checking for FS against
sliding)
Properties:
clay

= 19.64kN/m3
clay = 46.46
C2 = 154 kN/m2

Kp

=
= 1.638 > 1 OK!

Continue
Pp

= Kp2D2 + 2C2 D
= (163.83)(19.64)(1.3)2 + 2(154) (1.3)
= 539.63kN/m

FSsliding

=
=
= 11.31 > 1.5 O.K !

Gravity Retaining Wall Design


Calculation (pressure at toe and
heel)

= =
= 0.387 < 0.583 (B/6)
qtoe

=
= 97.61 kN/m2

Continue
qheel

=
=
= 19.75 kN/m2

Cost Calculation
Type

Cost Per Unit


(RM)

Unit Used

Total Cost (RM)

Surveying
General Worker
General Contractor
Consultant Fee

300.00/ site
70.00/ day
90.00/ day
2000.00/ design

1 site
7 days
7 days
1 design

300.00
490.00
630.00
2000.00

629.5 m3

108279.00

629.5 m3

18885.00

12.39 m3

867.00

9.2 m3

230.00

Manpower

Materials
Ready Mix Concrete Grade 30
Normal Mix
Formwork
Backfill Soil
Vegetation

172.00/ cubic
metre
30.00/ cubic
metre
70.00/ cubic
metre
25.00/ cubic
metre

Machinery
Excavator
Loader
Compactor
Bulldozer
Crane
Dump Truck

506.67/
670.00/
536.67/
800.00/
600.00/
693.33/

day
day
day
day
day
day

7
7
7
7
7
7

days
days
days
days
days
days

3546.69
4690.00
3756.69
5600.00
4200.00
4853.31

MISC
Temporary Toilet

130.00/ unit

3 unit

390.00

Cost Calculation
Manpower is based on current general cost in

major construction company


Materials (concrete cost) is based on current
concrete cost according to grade needed
Machinery is based on current machinery cost
by BEM/ IEM costing sheet

Conclusion
Based on the design calculation, all factor of

safety parameters were concluded pass


FS for overturning did not derived far from the
minimum FS value
FS for sliding derived a bit lot from minimum
FS value, making the design pass from sliding
but the cost to build the retaining wall
expensive
The stress at toe and heel is okay because the
stress at toe calculated is larger than the
stress at heel of the retaining wall