The document provides an overview of risks associated with rooftop solar PV installations in Indonesia. It discusses various performance risks like effects of shading and dust that can reduce solar panel output. It also addresses risks that can be avoided through proper risk management strategies like performance guarantee clauses in operations and maintenance contracts. The document outlines Indonesia's net metering process for solar systems and requirements for registering solar exports with the state utility PLN.

Uploaded by

rabbit_39
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views45 pages

Rooftoop

The document provides an overview of risks associated with rooftop solar PV installations in Indonesia. It discusses various performance risks like effects of shading and dust that can reduce solar panel output. It also addresses risks that can be avoided through proper risk management strategies like performance guarantee clauses in operations and maintenance contracts. The document outlines Indonesia's net metering process for solar systems and requirements for registering solar exports with the state utility PLN.

Uploaded by

rabbit_39
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 45

Risks and landscape

ROOFTOP overview of the


SOLAR PV Indonesian conditions
WHAT YOU NEED TO KNOW
WHAT YOU NEED TO
KNOW
LET’S TALK
ROOFTOP PV
HOW MUCH
SHOULD YOU PAY
PERFORMANCE
RISKS
Avoidance Mitigation

Risk
Management

Acceptance Transfer
Risk costs money
Protect yourself
O&M contract with performance guarantees
Or you can take on the
risk yourself
If you’re confident
you’re capable
What are
the risks?
Effects of shadow
on solar PV
Is this a
good
installation?
How about now?
Small shade = big impact
Dust
Who’s going to
clean your
panels?
Net Metering PLN Process
1. Visit the area PLN office to fill out
application form
2. PLN area office will verify administrative
issues to PLN standards
3. Testing and verification on site
4. Once everything is set up PLN area will
issue an approval letter and a registration
number for the export import meter

NOTE:
- Minimum monthly bill applies as usual
- There is a charge for the new export
import meter
- Other charges apply as required by law
What you need
• Single line diagram with system specifications
• Equipment specifications
• Test certificate for equipment (IEC, etc)
• Certificate of Operational Readiness (SLO)

As of June 2017:
Self
consumption?
Sell to PLN?
Increasing block
tariff
Other
solutions
Andre Susanto
andre@pt-inovasi.com
www.pt-inovasi.com
+62 811 911 0427
https://id.linkedin.com/in/andresusanto

EMPOWERING rural communities through INNOVATION

You might also like