PENGANTAR DFKI PIPA
EDIMAN HOTMAN
Ir. MMBAT., Dpl.SM
• ITB, JURUSAN MESIN.
• METAL ENGINEERING INSTITUTE, METALURGIGAL CORROSION
ENGINEER, OHIO, USA.
• INDUSTRIAL DEVELOPEMENT INSTITUTE, METALIC &
ATMOPHERIC CORROSION.
• BRUNELL UNIVERSITY, INTERNATIONAL DIPLOMA IN SAFETY
MANAGEMENT, LONDON, UK.
• ITB, MAGISTER MANAJEMEN BISNIS ADMINISTRASI DAN
TEKNOLOGI.
• AHLI K3. DEPNAKER
• AHLI RADIOGRAFI.
PIPA (PIPE) ?
DEFINISI
PERPIPAAN (PIPING) ?
FUNCTION : Transmitting Materials (solid, liquid, gas)
HORIZONTAL
POSITION : VERTICAL
ELEVATED/TILT
METALIC PV.
MATERIAL :
NON METALIC PV : Plastic, Rubber, Cement.
PIPING COMPONENT
PIPE
Valve, Flange, Branch (Reducer,
FITTING :
Tee), Elbow, Expantion Joint.
SUPPORT : Rack, Slipper, Hanger, Stopper,
Support.
COATING : Paint.
LINING
INSULATION
PIPING DESIGN, CONSTRUCTION & INSPECTION
DESIGN
CONSTRUCTION / INSTALLATION
PROCUREMENT
INSPECTION
TESTING
DESIGN
Qualification of Designer Requirements depend on complexity
and critically of piping system
Ability to use code/ standard.
4 years study on Piping Sistem Design.
BASIC REQUIREMENTS :
Point to point Transfering of material.
PURPOSES :
Start point – intermediate line – end point condition.
ISOMETRIC LINE SKETCH
D. 101 D. 102
DESIGN CONDITION
Service Condition : Liquid : Water, Oil, Acid, Base, Chemicals.
Gas : Air, Steam, Natural Gas, etc.
Solid : Chemival Dust, Cement, etc.
Design Pressure : Internal & External.
Design Temperature :
Ambient Condition : Cooling effect on pressure, Fluid expantion effects.
Dynamic Effects : Impact, Wind, Earth Quake, Vibration.
Weight Effects : Live Load, Dead Load, Test Fluid Load.
DESIGN CALCULATION
Code Applied : Selected Materials
ASME/ANSI B.3.1.. Max Operating Pressure.
Calculation
API 1104, P, T, D Max Operating Temp.
DNV-OS-F101 Minimum thickness.
ANSI B. 16… Needs of Fittings : Dimension
Stress . & Rating.
Isometric Sketch Analysis
Needs of support.
Design Condition Needs of coating/insulation.
ISOMETRIC DRAWING
& JOINT DESIGN
Typical Calculation Formula.
PROCUREMENT.
Purchasing material as per Bill of Material on Detail Drawing.
PURCHASER SELLER
Inquiry Quotation
Quantity & Spec shall
be clearly specified.
Purchase Oder Delivering material + Mill Certifivate as per
Puchase Oder.
Receiving Material
Incoming material Inspection
CONSTRUCTION / INSTALLATION
Code : API 1104, ASME Sect V, ASME Sect IX.
Material send to site
Installing piping
and its
Welder & Pipe Fitter
components.
Qualification
INSPECTION & TESTING
Inspector Qualification.
INSP & PERFORMED
NO PARTS/JOINT NUMBER TEST ITP NO RESPONSIBILITY
METHOD
F I O
1 ….. RT 01/ITP
2 ……. RT 02/ITP
.. ….. … … .. .. ..
20 All Piping HT 20/ITP H H H
Inspection & test Report.
E N D O F COURSE
THANK YOU
MAY YOU ALWAYS BE SUCCESSFUL