Business Plan Perpetual Power Solution Co., LTD: 15 July 2016

Perpetual Power Solution Co., Ltd (PPS) is a Myanmar company formed in 2016 as part of the MCM Group of companies to provide electric power solutions. PPS has 15 employees and offices in Yangon and Nay Pyi Taw. PPS plans to become a dealer for MTU diesel engines and power systems. PPS's vision is to be a world-class power solutions provider through people development and quality products. Its mission is to be a preferred infrastructure partner in Myanmar by growing its product and service capabilities.

Uploaded by

Ko Aung Ko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
300 views49 pages

Business Plan Perpetual Power Solution Co., LTD: 15 July 2016

Perpetual Power Solution Co., Ltd (PPS) is a Myanmar company formed in 2016 as part of the MCM Group of companies to provide electric power solutions. PPS has 15 employees and offices in Yangon and Nay Pyi Taw. PPS plans to become a dealer for MTU diesel engines and power systems. PPS's vision is to be a world-class power solutions provider through people development and quality products. Its mission is to be a preferred infrastructure partner in Myanmar by growing its product and service capabilities.

Uploaded by

Ko Aung Ko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 49

Perpetual Power Solution Co.

, Ltd
Business Plan

15 July 2016
Yangon, Myanmar

Version. 0 1
Presentation Agenda

A. Business Plan
1. Company Profile
2. Business activities in relation to MTU Products
3. New Business Plan
4. Company Certificates & Shareholder List

2
Business Plan Company Profile
Company Profile

MCM Co., Limited


•U Aung Hlaing Oo (50%)
•Daw Khin Nwe Mar Tun (50%)

PPS Co., Limited


•Daw Khin Nwe Mar Tun (97%)
•Daw Khin Khin Linn (3%)

Industrial & Oil & Gas Transportation Electric Power


Construction •Parts Sales & •Railway Generation
•Engineering & Service, repowering •Marine (Diesel & Gas)
Procurement & engines/gensets
(Commercial)
related to the power sales in onshore & •Gensets & Gendrive
systems offshore blocks •Marine
engine Sales
(commercial
•Contracts
Authorities) •Parts Sales & Service
•Parts Sales & as System Integrator
Service
•Power Plants (O&M)
•Telecom sector

MSP Group
Company Profile 3
Business Plan
Organization Chart of Myanmar Chemical & Machinery Co., Ltd

Shareholders
- U Aung Hlaing Oo (50%)
Managing
- Daw Khin Nwe Mar Tun (50%)
Director

Secretary

Human Finance & Construction Rubber MCM Trading Project


Resource & Accounts Division Plantation Pacific Pte Department Development
Admin Ltd,
Singapore

HSE Banking Mechanical Automobile Applications


& Electrical &
Engineering Engineering

Transportation Logistics Civil Ministry of


Engineering Electricity
& Energy

Workshop

MSP Group
4
Business Plan Company Profile
Organization Chart of Perpetual Power Solution Co., Ltd

Shareholders
Director
- Daw Khin Nwe Mar Tun (97%)
Daw Yee Yee Htwe
- Daw Khin Khin Linn (3%)

CEO
Mr. Heinz Ludi

Human Finance & Information General Manager


Resource & Accounts ** Technology U Aung Tun Myint
Admin ***
Special Project
Manager
HSE *** Logistics U Kyaw Ko Ko
Daw Khine Mon Oo
Sr. Sales &
Marketing
Manager ***

Engineering
Manager
U Tin Maung Latt

MSP Group
Business Plan Company Profile
Organization Chart of MCM Pacific Pte Ltd

Shareholders
Managing Director - Mr. Aung Hlaing Oo (98%)
Mr. Aung Hlaing Oo -Mr. Tan See Seng (1%)
- Mr. Tan See Lim (1%)

Secretary
Mrs. Khin Nwe Mar Tun

Director Director
Mr. Tan See Seng Mr. Tan See Lim

MSP Group
6
Business Plan Company Profile
Perpetual Power Solution Co., Ltd History

• Founded by Mr Aung Hlaing Oo & Daw Khin Nwe Mar Tun (Wife).
2001 Myanmar Chemical &
• Dealt in Steel and commodity trading.
Machinery Company • Started with a small turnover (less then One million USD).
Limited • MCM is one of the Largest and established business house in
Myanmar today.

• One of the technical services & complete solution provider related to


2016 Perpetual Power Electric Power Generation, Rail Industrial, Marine and Oil and Gas
Solution operation.
Co., Ltd • PPS is one of MCM Group of companies to work with foreign
investors and local companies in Myanmar.
• Recruited senior management and engineers from overseas,
Myanmar community, Myanmar Engineering Society, Universities and
Technical Institutes
• PPS employs 15 employees to start-up the MTU operation, which will
operate from 20/21, Thukhawaddy Road, Yankin Township, Yangon,
Myanmar. Administrative office and support facilities in Yangon (2),
Nay Pyi Taw (3).

MSP Group
7
Business Plan Company Profile
Vision & Mission Statements

PERPETUAL POWER SOLUTION CO., LTD

Vission Statement Mission Statement

• To Be A World Class Power Systems Solution • PPS to develop its organization in a manner which
Provider Through People And Facility would enable it to become a preferred partner in the
Development Focused On Providing Quality economic development in general, and infrastructure
Products With Support For Our Customers’ development in Myanmar.
Benefit.
• In the process, PPS must grow and emerge as the
leading supplier of quality power system products
and technical services, with the most responsive
product support capability in Myanmar.

• This will be achieved by the dedicated and committed


PPS employees who will be trained, equipped and
empowered to perform in a true entrepreneurial
spirit.

Dealership Development Plan


8
Business Plan Company Profile
MCM Head Office

MSP Group
9
Business Plan Company Profile
PPS Head Office

MSP Group
10
Business Plan Company Profile
Nay Pyi Taw Office 1 Nay Pyi Taw Office 2

Nay Pyi Taw Workshop &


Office 3
As business develops, additional branch
offices and workshop will be opened in
facilities of MCM group offices and
workshop.

On a 8 acres plot

MSP Group
11
Business Plan Company Profile
One acre for PPS

On a 8 acres plot at Hmawbi Township, Yangon


One acre to be occupied by PPS for genset
inventory, parts warehouse, workshop and
Pyay Road

small office.

200’ x 40’

PPS Head office New Building layout


(See below)
MSP Group
12
Business Plan Company Profile
New Workshop, Genset Inventory, Parts Warehouse & Training Center

13
Business Plan Company Profile
Perpetual Power Solution Co., Ltd
20/21 Thukhawaddy Road,
6-Quarter, Yankin Township, Yangon

(Myanmar)
Tel: +95 9262809754 Fax: + 95 1 558058

14
Business Plan Company Profile
Presentation Agenda

A. Business Plan
1. Company Profile
2. Business activities in relation to MTU Products
3. New Business Plan on
4. Company Certificates & Shareholder List

15
Business Plan Business Activities
Revenue

Myanmar Chemical & Machinery Myanmar Pacific Pte Ltd


Co., Ltd

16
Business Plan Business Activities
Achievements

Notable landmarks in the Company’s history include:


Overhaul and Supply of Spare part for General Electric’s Steam Turbine
Generator (STG) of Hlawga Power Plant in Myanmar thru ALSTOM Thailand.
Supply of Truck Assembly Plant for MOI. Capacity of plant is 7000 trucks
per annum.

Management and resources:


Managed by a group of highly qualified and dedicated managers with years of
extensive local and overseas experience.
About 200 employees in MCM & PPS (Avg. age: Management – 45, Others –
30)
Total asset value of over US$ 50 million.
Outstanding contracts with value of US$ 10 million
Additional contracts worth US$ 1.983 million under negotiation

17
Business Plan Business Activities
MCM Co., Ltd Projects

Project Description
Supplied of GE Spare part for Steam Turbine Generator (STG) of Hlawga
PAST PROJECTS

Parts & Service for Hlawga Power Plant Power Plant in Myanmar thru ALSTOM Thailand.

Capacity of plant is 7000 per annum. This project is commissioned and


Truck Assembly Plant
start production.

18
Business Plan Business Activities
MCM - Customer / Partner Base

GENERAL ELECTRIC is our business partner for Overhaul and Supply of Spare
part for Steam Turbine Generator (STG) of Hlawga Power Plant in Myanmar thru
ALSTOM Thailand.

JEREH GROUP China is our business partner for oil and gas engineering and
construction, oilfield technology services and equipment supplying to MOGE/MOE
and open market in Myanmar.

DAEWOO INTERNATIONAL is our business partner for trading, exporting rice


and a 22 year 70MW IPP power plant (GE Gas Turbine) in Myanmar.

SINOTRUK IMPORT & EXPORT CO. LTD. China is our business partner for
supply of 02 no's truck assembly lines in Myanmar.

19
Business Plan Business Activities
PPS - Customer / Partner Base

Myanmar National Railways is our customer for supplies of special tools & spare parts
and repowering of existing diesel locomotives.

Myanmar Navy is our customer for supply of Hull Design, propulsion System, consist of 3
main diesel engines, gear boxes & water jets complete with support systems.

Myanmar Oil & Gas Enterprise is our customer for the supply of power system, and
parts sales & services.

RESOURCES GROUP CONSTRUCTION is our customer for supply of 2 x 750KVA


MTU 12V 2000DS825 Diesel Gensets complete with turnkey installation to Paragon 27 th
story residence project in Yangon.

EMERSON MYANMAR LIMITED is our business partner for supply of a


2000kVA transformer with the three 1600kW generators and fuel storage system to
supply power to the Early Deployment Centre / Data Center of telecom provider
MPT/KSGM in Yangon, Nay Pyi Taw and Mandalay.

20
Business Plan Business Activities
Engine Database
Marine C&I OSE
Engine
Comm. Govt. Gendrive Total
Type Comm-
Authoriti / O&G Mining Railways Others & Diesel
Gas
ercial System
es Naval System

MTU 6V 396
20 20
TC 12
MTU 12V
60 60
396 TC 12
MTU 16V
19 19
396 TC 12
1000 KW
MTU Marine 15 15
Engine
Gas Genset
MTU
160 160
GB1560N5,
1.56 MW

Sub-Total

Total 15 99 160

21
Business Plan Business Activities
Sales and Technical Capability

Daw Yee Yee Htwe

• Born on 29th August 1962 in Taung Dwin Gyi, Myanmar.

Background Experience and achievements


• Worked at Mandalay Diary Development Project as a Project Engineer from 1985 until
• Parents: U Tin Shein, and Daw Than 1995.
Shwe
• Worked at Caterpillar Dealership in Myanmar (MSPTL) as a General Manager from
• In 1984, graduated from Rangoon 1996 until 2016.
Institute of Technology (RIT) with a
Bachelor of Engineering (Electrical • She has over 30 years’ experience in power system industry in customer service, sales,
Power). marketing and business development.

• During her time with MSPTL formally known as MTL (Myanmar Tractor Limited),
established long-lasting and rewarding professional and personal relationships with
employees, customers, the Government and even competitors.

• Currently, work at Perpetual Power Solution Co., Ltd as a Director.

22
Business Plan Business Activities
Mr. Heinz Ludi

• Born on 2nd February 1946 in Switzerland

Background Experience and achievements


• After finishing school, apprenticeship •1997‐2015 (18 years) in Myanmar, 14 years with Myanmar Tractors as General Manager
and compulsory army services as a tank and 4 years with Myan Shwe Pyi Tractors as CEO.
commander in Switzerland.
•Has worked with Caterpillar Dealers in various countries and positions from 1970 until
• left to work overseas to gain more end 2015.
experience.
•Currently, work for Perpetual Power Solution Co., Ltd as CEO.
• Worked 2 years in Australia (1968‐1970)
as a Heavy Equipment Engineer, where •Highly regarded in Myanmar by Government, colleagues in MTL, both local and foreign
he obtained his certificate as a customers and even competitors.
Mechanical Plant Engineer and became a
full member of the Society of Operations •Have started an apprenticeship program in 2007 at Myanmar Tractors for
Engineers UK. young Myanmar school leavers to become certified Caterpillar Engineers after
successfully completing 4 years of apprenticeship.

•Fully committed to Myanmar and plan to retire working career in the country.

23
Business Plan Business Activities
U Aung Tun Myint

• Born on 31th March 1963 in Yangon, Myanmar


• Married; Number of Children: Two
• Language: English, France & Myanmar

Background Experience and achievements


• In 1983, achieved diploma in Mining •In Jun 1988, appointed as an Assistant Mining Engineer in No.(3) Mining Enterprise.
from AGTI, Myanmar.
•Awarded the scholarship from France for studying of Mining operations during the
• In 1987, graduated from RIT with a period Nov 1990 – Oct 1992.
bachelor of engineering in Mining.
•Worked at Asia World Co., Ltd as a Deputy Manager at the Quarry Project situated in
• Started his career with Kaw lin Gold Ngaputaw Township and responsible for the production of decorative limestone for 3
project under No.(2) Mining Enterprise years.
as an Apprentice Mining Engineer.
•During the period from June 2000 to July 2002, appointed as a Manager in Genesis
• In 1992, achieved a diploma certificate Enterprise and responsible for exporting jades to Korea.
from the School of Mines in Paris,
France. •Aug 2002-Jun 2011 (Almost 9 years) in Myanmar Tractors Ltd as a Trainee Allied Sales
Engineer and Promoted to Branch Manager at Pharkant Branch. During his tenure he has
consistently grown the business and moved to more senior management level with greater
responsibility.

•July 2011 to May 2016 (Almost 5 years) in power system division of Myan Shwe Pyi
Tractors Ltd as a Senior Project Manager and mainly carried out the power plant projects
and data center projects for Ooreedo telecom provider.

•He is now working at Perpetual Power Solution Co., Ltd as a General Manager.

Business Plan Business Activities 24


U Tin Maung Latt

• Born on 19th April 1973 in Myanmar

Background Experience and achievements


•In 1993, graduated from YTU with a •During the period from Nov 2006 to Aug 2012, appointed as an application engineer at
bachelor of engineering in Mechanical. Watana Trading Ltd. In July 2010, promoted to lead engineer under both of process
engineering division and general trading division to handles the overall project
•Achieved other professional certificates complement and product supports as a company was dealer of JohnDeere Tractors,
related to HRD, Allied solution and IT. Yanmar Generators and Vinappro Rice Milling Machine during a 6 year period.

•In May 1999, started his career with •In Sep 2012, appointed as senior engineer at Barons Machinery and Engineering Co. Ltd
Myanmar Tokiwa Corporation Ltd. as a who had responsible as a project engineer for 104.7MW Power Plant project during a 10
senior engineer (Engineer-In-Charge) of months period.
Raw Pencil Section as well as Head of
Maintenance Department during a 7 year •During the period from Aug 2013 to Feb 2014, worked for Global Quality Management
period. Co., Ltd as a Project Development Engineer for Kyaukse and Myingyan Power Plant
project and also for MOGE projects.

•In Mar 2014, appointed as an application engineer under power system division of Myan
Shwe Pyi Tractors Ltd.

•He is now working at Perpetual Power Solution Co., Ltd as a Engineering Manager.

Business Plan Business Activities 25


U Kyaw Ko Ko

• Born on 19th Dec 1981 in Myitkyina, Myanmar.


• 4 siblings across Myanmar and UK.
• 1 children; Hein Zay Yan@Harry (4).

Background Experience and achievements


•Parents: (U Khin Maung Myint) and Daw •In July 2005, started his career with Pan United Marine. as an electrician under electrical
Htwe Htwe. dept., during a 2 1/2 year period in shipyard, he had experience in motor alternator
overhauling, installation, testing and calibration of vessel control system, power system
•Married to Myat Su Mon Win in 2011. and remote valve control system including instrument devices.

•In 2002, achieved diploma in Electronic •In April 2008, appointed as Electrical Technician at Pan Greatways Pte Ltd. Had
Engineering from Yangon University, experience especially in building maintenance related to security system such as Fire
Myanmar. Alarm , Door control, etc.. And dynamic positioning control system in the vessels.

•In 2003, graduated from Dagon University •During the period from Sep 2008 to April 2012, worked for Noor Systems Pte Ltd as a
of Yangon with a Bachelor of Business Project & Design Engineer. During a 4 year period, had an experience in project, design,
Management. FAT and SAT related to Valve remote control system, Tank Gauging system, enti heeling
system and other vessel control system as a company is integrator and manufacturer in
•In 2009, achieved diploma in Electrical marine and offshore industry.
Technology from Ngee Ann Polytechnic,
Singapore during working period. •In May 2012, appointed as engineer under stand alone automation division of Wartsila
Singapore Pte Ltd. Assigned to handle all kind of electrical control system and hydraulic
•Qualified as competent person for control system in marine and offshore industry during a 3 year period.
preparation, installation, maintenance and
inspection of explosion protected equipment •He is now working at Perpetual Power Solution Co., Ltd as a Special Project Manager.
in hazardous area.

Business Plan Business Activities 26


Presentation Agenda

A. Business Plan
1. Company Profile
2. Business activities in relation to MTU Products
3. New Business Plan
4. Company Certificates & Shareholder List

27
Business Plan New Business Plan
Rail Transportation

 Track length: 5,844 km


 Track gauge: 1,000 mm (meter gauge)
 Total of 858 stations
 431 locomotives (Steam, DEL, DHL)
 1,277 passenger coaches
 3,236 freight wagons

28
Business Plan New Business Plan
29
Business Plan New Business Plan
30
Business Plan New Business Plan
All MTU Engine Locomotives used in Myanmar Rail Transportation
2500 60
Opportunities,
- Repowering of existing locomotives 50
2000 (DEL / DHL)
- New locomotives (DEL / DHL)
- Parts Sales & Service (Overhaul) 40
1500
- Private sector in freight services
30

1000
20

500
10

0 0
Krupp Krupp Krupp Krupp
K.S.K Hitachi K.H.I K.H.I K.H.I K.S.K Sifang K.S.K Sifang Dalian
(Germ (Germ (Germ (Germ
(Japan) (Japan) (Japan) (Japan) (Japan) (Japan) (China) (Japan) (China) (China)
any) any) any) any)
Locomotives (HP) 500 500 500 500 500 900 900 1200 1200 1200 1500 1500 2000 2000
Qty 1 5 4 5 5 15 11 4 6 4 16 4 9 10
Age (years) 52 52 38 30 28 37 28 45 30 22 53 45 20 17

A critical threshold population of MTU engines currently exists in Myanmar Rail industry which will
sustain a parts and service business. The current climate calls for a board range of support
capabilities, including rebuilding engines and replacing those not viable for rebuild, i.e., repowering,
in existing locomotives. Special Tools for MTU engines will be ordered from MR is in progress.
31
Business Plan New Business Plan
ELECTRIC POWER GENERATION

 Number of household: 11.56 mil


 Electric household supplied: 450,000
 Unelectrified households: 810,000
 Electrified Ratio: 30%
 NEP planned 100% electrified period: 14 years (2030)
 The government’s target of nationwide power by 2030
will involve a total capacity of 24,000 megawatts of electricity.

 Myanmar has 108,000MW of hydroelectric,


 Estimated reserves of 711 million metric tonnes of coal,
 365.1 terawatt hours (TWh) per year of wind power and
51,973TWh per year of solar power.
 459 million barrels per day of proven oil reserves and
11.8 trillion cubic feet of proven natural gas reserves.
Number of
Sr Type of Total Installed
Planned Completing Implementing
No. Power Plant Capacity (MW)
Projects
1 Hydro power 52 46330 9 (2322MW) 5 (1495MW)

2 Gas-Fired power 4 788 3 (388MW)

3 Coal power 11 8305 1 (120MW)

4 Solar power 5 550


5 Wind power 34 2380
Total 106 58353

32
Business Plan New Business Plan
• Hydropower is one of the significant opportunities
in the country

• The outgoing government spent more than $2.7 billion


on the power sector in the past five years across
generation, transmission and distribution, according to
the MOEP
• Gov. has borrowed $1.69 billion from international
institutions under various loan programs.
Of this, only $103.9 million has been spent in the past
five years by outgoing government,
The other $1.5 billion is to be spent by the present
government.

Opportunities, • which will require investment of between US$30 billion and $40 billion
over 15 to 20 years.
- Hydro generation power plant PPS is working with Emerson to supply of 9 no. of MTU
- Gas & Steam fired power plant 12V 2000 series diesel gensets (each 1600 KVA) with
- Coal fired power plant 2000KVA Transformer & control system to EDC / Data
- Solar & Wind power center of telecom provider MPT/KSGM.
- Data Center in Telecom sector PPS is working in supply of two numbers of
- Parts Sales & Service (Overhaul) 1500KVA & 600KVA MTU Gensets for repowering
- Operation & Maintenance at Sedona Hotel, Yangon.
PPS is working in supply of a 1500KVA MTU Diesel
PPS is working in supply of standby power plant
Genset for Yangon Circular Railways.
with two numbers of 600KVA MTU Gensets  for
Yangon City Development Committee, Yangon. PPS is working in supply of 1 x 1250KVA & 1 x 278KVA
MTU Diesel Genset for Wilmar food & beverage factory.

33
Business Plan New Business Plan
Marine (Commercial & Government)

Existing Powered Vessels Opportunities,


- Repowering of existing commercial
Passenger/cargo 118 vessels
Cargo vessel/tug 24 - New shipbuilding
Tug 17 (Fishing, Offshore, Passenger & Cargo)
Pilot Tug 17
Fresh water carrier 1 - Deep sea port projects
Miscellaneous 6 - Parts Sales & Service (Overhaul)
- Cold storage factories in the
Tanintharyi coastal area especially in
Myeik district

Kyauk Phyu

Ngayoke Bay

Kalagauk

Vessels built 2005-2015

The commercially navigable length is 6915 kilometers:


- The Ayeyarwady 1534 km
Cold Storage factories
- The Chindwin 730 km
- The Ayeyarwady delta 2404 km
- The Thanlwin and Mon state rivers 380 km Ports & Terminal
- The Rakhine state rivers 1602 km Deep Sea Port Projects
Vessels built 2004-2014 - The Mekong (within Myanmar territory) 265 km

34
Business Plan New Business Plan
Recoverable reserves of oil:
Oil & Gas Demarcated Blocks for Production Sharing Basis
459 MMBL •53 Blocks (Onshore)
•25 Blocks (Offshore-Shallow Water)
On shore: Off shore: •26 Blocks (Offshore-Deep Water)
369 MMBL 90 MMBL •16 onshore and 19 offshore
blocks are in operation
Recoverable reserves of gas:
11.8 TCF

On shore: Off shore:


1 10.8

Foreign capital pledged to Myanmar’s oil and gas sector is nearly $17
billion, and $2.6 billion had already been invested during fiscal year
2015 by the end of January, according to statistics from the Myanmar
Investment Commission (MIC).

Opportunities,
- Repowering of existing onshore &
offshore rigs & platforms
- Power supply in new onshore & offshore projects
- Power supply in new gas line construction projects
- Parts Sales & Service (Overhaul)

PPS have a parts enquiry from Myanmar Oil & Gas Enterprise
(MOGE) for their old GM/Detroit Diesel engines.

35
Business Plan New Business Plan
SWOT Analysis

Strengths Weaknesses
• Excellent sales engineers with strong • Difficult to meet customer demand as a new
knowledge and experience in Engine start-up company
Applications, Genset Sales & Services • High start-up costs against low income in
• Good relationship with customers beginning
• Good internal communications • Time to establish excellent reputation
• Excellent footfall
• Successful marketing strategies
• Reputation for innovation & providing total
solutions

Opportunities Threats
• Lack of after sales service providers in market • Increased number of competitors
• Low number of total solution providers • Long established world class brands in market
• Customer loyalty • A widening competitor footprint
• Customer demand higher standards of overall
services

36
Business Plan New Business Plan
Three years revenue projection - Railways

Engine Type No. of Engine

Series 1600 -
Series 2000 -
Series 4000 13

37
Business Plan New Business Plan
Three years revenue projection - EPG

Engine Type No. of Engine

Series 1600 30
Series 2000 35
Series 4000 40

38
Business Plan New Business Plan
Key Project & Activities

Project Description
ONGOING
PROJECTS

Supply of two numbers of 750KVA MTU 12V 2000DS825 Diesel Gensets


Paragon 27th Residence Project
complete with turnkey installation

PPS is working with Emerson to supply of 9 no. of MTU 12V 2000 series
ECD/Data Center project diesel gensets (each 1600 KVA) with 2000KVA Transformer & control
system to EDC / Data center of telecom provider MPT/KSGM.
FUTURE PROJECTS

PPS is working in supply of two numbers of 1500KVA & 600KVA MTU


Repower project, Sedona Hotel
Gensets for Sedona Hotel, Yangon.

PPS is working in supply of a 1500KVA, 6.6KV MTU Diesel Genset for


Myanma Railways project
Yangon Circular Railways.

PPS is working in supply of 1 x 1250KVA & 1 x 278KVA MTU Diesel


Wilmar Project
Genset for Wilmar food & beverage factory.

Supply of new Loco for Resources Group PPS is working in supply of 4 x 2000HP new loco for freight services
Logistic Co., Ltd, Myanmar. between Yangon, Mandalay & Myitkyina.

39
Business Plan New Business Plan
Presentation Agenda

A. Business Plan
1. Company Profile
2. Business activities in relation to MTU Products
3. New Business Plan
4. Company Certificates & Shareholder List

40
Business Plan Preparation of Partner application
41
Business Plan Company Certificates
To be updated

Business Plan MCM Shareholder List 42


43
Business Plan PPS-Shareholder List
44
Business Plan MCM Financial Statement
45
Business Plan MCM Financial Statement
Bank Account Info
Beneficiary Name: Perpetual Power Solution Co., Ltd
20/21, Thukhawaddy Street, Yangon 11081,
Myanmar
Bank Name: Kanbawza Bank Limited, Kyauktadar Branch,
No. 33/49, Corner of Bank Street & Mahabandoola Garden
Street, Kyauktada Township, Yangon, Myanmar
Account No.: 06010906005156601 (EURO)
Swift Code: KBZBMMMY
 
Beneficiary Name: Perpetual Power Solution Co., Ltd
  20/21, Thukhawaddy Street, Yangon 11081,
  Myanmar
Bank
  Name: Kanbawza Bank Limited, Kyauktadar Branch,
No. 33/49, Corner of Bank Street & Mahabandoola Garden
Street, Kyauktada Township, Yangon, Myanmar
Account No.: 06010906005156401 (USD)
Swift Code: KBZBMMMY

Beneficiary Name: Perpetual Power Solution Co., Ltd


20/21, Thukhawaddy Street, Yangon 11081,
Myanmar
Bank Name: Kanbawza Bank Limited, Myanmar Center Branch,
No. (192), Ground Floor (G-26, G-27), Hoang Anhgia Lai
Myanmar Co, Ltd, Myanmar Center, Vietnam Building,
Kabaraye Pagoda Road, Bahan TownshipYangon City,
Yangon,
Myanmar
Account No.: 26210326200063301 (MMK)
46
Business Plan Bank Account info
47
Business Plan Bank Account info
Training Certificate / Training Plan
Number of Cost of
Proposed Business
Trainer Time Line Employees to Training
Training need solved
be trained (In USD)
Introducing to All new service 2 x junior
technician /
work environment engineer
engineer shall In-house Sep 2016 $100
& Safety cross attend for zero 2 x service
training injury engineer
Upgrade company
to outlook/MS
PC training in MS office suite
Outlook/office Benefit-Stay In-house August 2016 All new staffs $100
suite current/software
easier to use &
maintain
Support better
solution / Strategy First
Logistic & Supply Knowledge in every March – August Logistic
logistics
Institute, $450
Chain Management 2016 coordinator
transactions of Yangon
company

2 x junior
MTU Product To become a service MTU Training engineer
Training technician
proficient with MTU
Center, TBA 2 x service $xxxx
after becoming a
engines & System Singapore engineer
service partner

48
Business Plan Training Plan
THANK YOU

49

You might also like