0% found this document useful (0 votes)
78 views55 pages

RSC - Presentation - Van Oord

Uploaded by

Zohr CAMS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views55 pages

RSC - Presentation - Van Oord

Uploaded by

Zohr CAMS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 55

RAWABI

SPECIALIZED
CO N TRACTIN
G COMPANY
OVERVIEW
2024
A RAWABI
COMPANY
ENERG INDUSTRI CONTRACTI REAL
Y AL SERVI NG ESTATE
CES SERVICES
RAWABI
IS
ORGANIZED TO Abdulaziz Ali AlTurki

LEAD AND GROW


Non Executive
Chairman Group
Chairman

TODAY AND
TOMORROW
We feature an esteemed board of
directors who help shape our direction, Noaf AlTurki Othman Ibrahim Hanaa Almoaibed
VP Corporate Affairs, Executive Director Non Executive &
provide legal and financial oversight, Non Executive
Director
Vice Chairman and Group Independent
Director
CEO
monitor
And Improve performance, mitigate risk
and determine our strategic intent.

Faisal A. Aldohaim
Non Executive &
Independent
RAWABI
SPECIALIZE
D
CONTRACTING
GOING ABOVE AND BEYOND THE CALL OF DUTY TO DELIVER THE PROJECTS
THAT SHAPE TOMORROW
construction, our professionalism and
From general contracting to marine
unwavering determination to succeed help clients bring mega projects
to life.

• A fully owned subsidiary of Rawabi


COMPANY CLASSIFICATION
Category Grade
Holding.
• Established in 1990 G (1410 H). Marine Works First Grade
• Head-quartered in AlKhobar with
projects are all over the kingdom.
Building works First Grade
• Multi-national workforce of 4800+
employees. Water & Sewage Works First Grade

Electrical, Mechanical & First Grade


Industrial Works
DEDICATED TO EXCELLENT LOCAL CONTENT

Rawabi Group includes 13000+


Employee Rawabi Specialized
Contracting Total of 4800+ Employee

• 56% in IKTVA score

• Medium Green Netaqat


Saudization

• 22% of Engineers are Saudis


GENERAL CONTRACTING INFRASTRUCTURE INDUSTRIA
Civil, architectural, electrical, and • Sewer networks including lift L COATING
mechanical works for various stations Industrial coating
sectors: • Water networks including and flooring
• Industrial tanks and pump stations Using modern
• Governmental • Stormwater networks technologies and
• Commercial and private including lift stations Oil & Gas Construction
improved
• Irrigation networks including protective &
Greenfield coating.
Brownfield projects
pump stations and house Construction and P lant

POWERED
connections maintenance services for civil,
• W astewater treatment plants mechanical, electrical,
• Operation and maintenance of instrumentation and other
MARINE CONSTRUCTION wastewater treatment plants related fields during normal

BY PEOPLE
and networks operations and turnarounds
• Dredging and reclamation
• Transmission pipelines
• Marine infrastructures
• Quay walls
• Jetties (fixed and/or floating) WATER/ FIRE
• Caisson Structure
• Breakwater (fixed and/or
PROOFING
• W aterproofing W orks Specialist HDD and Micro
floating) • Substructure
• W aterfront development tunneling Contractor
• Superstructure
• Rubble mounded structures • Epoxy Coating W orks
• Harbors breakwaters • Carparks.
• Slope protection • M echanical / Electrical
• Submarine structures
/ Food Grade and
• Pipelines
Loading Deck areas
• Cables • Fireproofing W orks
• Intake/Outfall Specialist CIP, PHC, Tubular
• Intumescent Painting
• Berth constructions, Piles Contractor
• Cementitious Painting
rehabilitation
and maintenance
MAJOR CLIENTS
FINANCIAL CAPABILITY
OUR SURVICES
Wide Range of Diversified, High-Quality Services
Key Services Major Clients Key Projects
 Construction of terminals, berths,  Sindalah Island Marina Bay
marinas, Quay walls, Jetties and Construction of Quay Wall and Marina
breakwater Lining.
 Flushing system.  Construction of two Berths and
Marine Construction  Submarine Cables. dredging of 4.7 million m3 at Ras Al
 Submarine Pipeline. Khair.

 An EPC Contractor for all civil,  Aramco School at Safwa & Khobar.
mechanical & electrical works.  230/96KV Dharan Substation.
 Construction of industrials building,  6 Senses, Rosewood, 4 Seasons
General Contracting
schools, hotels & hospitals. resorts at Amaala.

 Sewer networks including lift  13.8 Km Temporary water line for


stations. SINDALAH ISLAND NEOM.
 Stormwater networks including lift  Main Sewerage Network for North
stations. Riyadh.
Infrastructure  Transmission pipelines.

 Waterproofing Works Substructure &  W/P work of King Abdul Aziz road
Superstructure development project at Makkah.
 Epoxy Coating  W/P work for north project cup and
 Fireproofing Works external works project at Sharma –
Water & Fire Proofing
 Industrial Coating Tabuk.
ILLUSTRATIVE PROJECTS

Dredging Works
Scope of works RSC Value Add/ Achievement
Dredging of 4.7 million m3
up to -18.6 m inside Ras Using owned equipment to
Alkhair port and finish the scope ahead the
Dredging at Ras
reclamation of the west schedule
Alkhair port
Lagoon

Using owned equipment to


Dredging and Reclamation
finish the scope ahead the
Dredging at for 8.0 million cubic meters
schedule
DAMMAM PORT

Fast Mobilization and early


Dredging of 1.3 million m3 engagement in fast-track
Dredging at Suez at Suez Canal project using RSC
Canal equipment

Very challenging works in


Dredging of the Sindalah
terms of the environmental
island Marina include all
compliance to pump over
Dredging Works the required
12 million m3 of dredging
Sindalah Island Environmental protection
water
ILLUSTRATIVE PROJECTS

Dredging Works
Scope of works RSC Value Add/ Achievement

Dredging works for the


outer marina and inner
Normal Dredging Works
EMAAR – North marina basin EMAAR
coast – Egypt project North coast Egypt

Execute the dredging


Dredging the intake basin
works while maintaining
for Maaden phosphate at
Dredging the intake basin the running operations for
for MAADEN -RAK RAK port
the factory

Dredging and backfilling


for the intake and outfall
Normal Dredging Works
Dredging the intake and trenches with length 3.2
outfall trenches - Jubail KM

Dredging works for the


Dredging the Approach navigation channel and Normal Dredging Works
channel and turning basin
– Soukhna port – Egypt turning basin – 500K Cu.m
ILLUSTRATIVE PROJECTS

Quay Walls Construction Works


Scope of works RSC Value Add/ Achievement
Innovative Design by RSC
Design and Construction Engineering team to
of bulk and Container minimize the Construction
Berths 8,9 and 10
berths with Draft -20 m cost considering the same
at RAK Port
operational loads

Design and Construction Sindalah Island is 4 Km away


from the shoreline, Design and
of 1.0 KM length of quay
construction completed in 9
wall for Sindalah island months considering the logistic
Sindalah Marina
Marina and environmental challenges

Design and Construction Engineering team to minimize


the Construction cost
of 3.0 KM length of quay considering the same
Jubail Marina wall for Jubail Marina operational loads

Design and Construction Fast Track Project, Design and


of 1.2 KM length of floating construction completed in 9
Caissons Marina at months considering the logistic
SHUSHA Marina and environmental challenges
Shusha island
ILLUSTRATIVE PROJECTS

Jetties Construction Works


Full compliance with the Oil
and Gas Construction
Construction of 4 Jetties at
regulation, Maintain the
Petro Rabigh Port running operations for the port
Petro Rabigh
during the construction

Very Fast Track Project ,


depending on in House
Design and construction of
Engineering for the fast
RAS ALGASSABA 300 m length of pilled jetty
structure system and
jetty
construction methodology

Very Fast Track Project ,


Design and construction of depending on in House
2 Gravity wall jetties at Engineering for the fast
SHUSHA island
Shusha island structure system and
jetty
construction methodology

Very Fast Track Project ,


Construction of 4 Gravity depending on in House
jetties at UAH island Engineering for the fast
UAH Jetty NEOM structure system and
construction methodology
ILLUSTRATIVE PROJECTS

Offshore Pipelines Construction Works


Scope of works RSC Value Add/ Achievement

Design and construction of It is considered as the deepest


pipeline installation in the Red
8 KM of 1200 mm Dia for
Sea, with the full consideration
The Line – Hidden the outfalls line at depths of the environmental
Marina up to 106 m from Sea level requirement

Offshore construction of 7
pipeline using HDD Considering one of the longest
crossing done in KSA and it was
method at 40 m under the fully designed and erected by
Sindalah Utilities sea level for length 3.0 KM RSC team
each line
Sub- Marine Power Cable installation
Supply and installation of
10 km of 3 sub marine Considered the longest pulling
process of the sub marine
cables between the cable and RSC expect to get
Sindalah Island
mainland and Sindalah this record by Guinness
sub Marine Cable
Island

Very Fast Track Project ,


depending on in House
Design and construction of
Engineering for the fast
Sub Marine Cable 300 m length of pilled jetty
structure system and
Shusha island
construction methodology
ILLUSTRATIVE PROJECTS

Breakwaters Construction Works


Scope of works RSC Value Add/ Achievement
Construction of 3.6 KM of normal type of the
rubble mounted breakwaters, RSC used
breakwater at New owned land and Marine
Damietta Port-
Damietta Port – EGYPT up equipment to execute the
Egypt
to depth – 13 m CD project within the budget

Fast-track project design and


Design and Construction execution in 9 months,
of 600 m Breakwater on environmental compliance
Sindalah piles at sindalah island up challenge to minimize the
Breakwater to depth -12.0 m CD construction impact on the
marine environment
GENERAL
CONTRACTING
ILLUSTRATIVE PROJECTS

Refrigerant factory for RIG​


Scope of works RSC Value Add/ Achievement

The scope of work includes the


following structure:
The scope of work includes
1. Warehouse building
Earthwork, Dewatering,
2. Production building and its
Concrete Works, Steel
Refrigerant factory related facilities
Structure, Waterproofing,
for RIG​ 3. Administration Building
Embedded Mechanical &
4. Permanent Fence
Electrical
5. Guardhouse
6. Underground tanks
ILLUSTRATIVE PROJECTS

Warehouse & Storage Building for ROG​


Scope of works RSC Value Add/ Achievement

The scope of work includes the


following structure:
The scope of work includes
1. Warehouse building
Earthwork, Dewatering,
2. Production building and its
ROG Warehouse & Concrete Works, Steel
related facilities
Structure, Waterproofing,
Storage Building 3. Administration Building
Embedded Mechanical &
4. Permanent Fence
Electrical
5. Guardhouse
6. Underground tanks
ILLUSTRATIVE PROJECTS

Construction of new Dhahran Central 230/69 KV Substation

Scope of works RSC Value Add/ Achievement

The Scope of work shall include


The scope of work includes
Construction of 230kV GIS
Earthwork, Dewatering,
, 69kV GIS, control building with
Concrete Works, Steel
basement , transformer
Structure, Waterproofing,
foundations with fire walls,
Embedded Mechanical &
reactor foundation with fire
Electrical
walls,
ILLUSTRATIVE PROJECTS

Alkhorayef Manufacturing Lubricating Oil Company Ltd

Scope of works RSC Value Add/ Achievement

Built up Area of 15,550 m2,


concrete buildings, steel
Structure buildings, foundations
for tanks buildings, other Design, Engineering and
Allied works such as mechanical Construction of Motor Oil
works, electrical works, Manufacturing and Storage
Site development, Landscaping, Faculties.
Hardscaping, and
Sewage networks, water
networks and OWS works.
ILLUSTRATIVE PROJECTS

Building Trade Services at Rabigh Refining And Petrochemical Co.

Scope of works RSC Value Add/ Achievement

Miscellaneous building
construction and rehabilitation
(both internal and external)
including painting, steel roofing
installation, plumbing, carpentry,
Long form agreement with
electrical works, masonry,
High Quality services and
concrete construction,
Client’s Evaluation.
waterproofing, grouting, rubbish
clearance, and other
construction and repair activities
inside and outside high security
areas.
ILLUSTRATIVE PROJECTS

MAINTENANCE & PROJECT CONSTRUCTION AGREEMENT (MPCA)

Scope of works RSC Value Add/ Achievement

Long-terms contracts with SAMREF since 1995


Engineering, Project Management New
constructions and brownfield activities of existing
process facilities such:
Civil Works Long form agreement with
Administration , Industrial and Residential Buildings High Quality services and
Mechanical Equipment installation works Client’s Evaluation.
Piping fabrication and erection
Electrical and instrumentation works
NDT and Hydro test.
Managing and conducting all Shutdowns and
Turnarounds activities.
Fabrication and Erection of Steel Structures.
ILLUSTRATIVE PROJECTS

STORAGE TANKS REPAIR SERVICES AGREEMENT

Scope of works RSC Value Add/ Achievement

Long-terms contracts with SAMREF since 1995


Engineering, Project Management Long form agreement with
New constructions and renovation of existing Tanks, High Quality services and
metal and steel fabrication works, painting works, Client’s Evaluation.
insulation works, scaffolding works, electrical and
instrumentation works.
ILLUSTRATIVE PROJECTS

Upgrade Fire Protection and Industrial Drainage System for South Riyadh
Bulk Plant (X51)
Scope of works RSC Value Add/ Achievement

• Engineering
• Project Management
• New constructions and brownfield activities of
existing process facilities such:
o Civil Works
o Administration , Industrial and Residential Fast Track Project High
Buildings Quality services and Client’s
o Mechanical Equipment installation works Evaluation.
o Piping fabrication and erection
o Electrical and instrumentation works
o NDT and Hydro test.
o Managing and conducting all Shutdowns and
Turnarounds activities.
o Fabrication and Erection of Steel Structures
ILLUSTRATIVE PROJECTS

Upgrade Fire Protection and Industrial Drainage System for Duba- Tabuk
Bulk Plants
Scope of works RSC Value Add/ Achievement

• Engineering
• Project Management
• New constructions and brownfield activities of
existing process facilities such:
o Civil Works
o Administration , Industrial and Residential Fast Track Project High
Buildings Quality services and Client’s
o Mechanical Equipment installation works Evaluation.
o Piping fabrication and erection
o Electrical and instrumentation works
o NDT and Hydro test.
o Managing and conducting all Shutdowns and
Turnarounds activities.
o Fabrication and Erection of Steel Structures
ILLUSTRATIVE PROJECTS

UPGRADE FIRE PROTECTION & INDUSTRIAL DRAINAGE SYSTEM-TURAIF

Scope of works RSC Value Add/ Achievement

• Engineering
• Project Management
• New constructions and brownfield activities of
existing process facilities such:
o Civil Works
o Administration , Industrial and Residential Fast Track Project High
Buildings Quality services and Client’s
o Mechanical Equipment installation works Evaluation.
o Piping fabrication and erection
o Electrical and instrumentation works
o NDT and Hydro test.
o Managing and conducting all Shutdowns and
Turnarounds activities.
o Fabrication and Erection of Steel Structures
CURRENT PROJECTS

4 Season Hotel Construction Works


Scope of works RSC Value Add/ Achievement

The Four Seasons Resort and The scope of work includes


Branded Residences. Earthwork, Dewatering, Concrete
172 key hotel rooms Works, Steel Structure,
The 4 Seasons 30 hotel villas Waterproofing, Embedded
26 Branded Residences Mechanical & Electrical
CURRENT PROJECTS

The Rosewood Resort and Residences Project


Scope of works RSC Value Add/ Achievement

The scope of work under this


consists of 136 key high-end
contract includes Earthwork,
resort operated by the
Dewatering, Concrete Works,
Rosewood Hotel Brand. Spread
The Rosewood over 395,000 m2 & Built-up
Steel Structure , Waterproofing,
Resort Embedded Mechanical &
area approximately 55,500 m2s
Electrical Works.
CURRENT PROJECTS

The Six Senses Project


Scope of works RSC Value Add/ Achievement

The scope of work under this


consists of 70 hotel keys, 30
contract includes Earthwork,
hotel villas and 25 Branded
Dewatering, Concrete Works,
Residences. Spread out over
Steel Structure , Waterproofing,
The Six Senses 404,000 m2 & Built-up area
Embedded Mechanical &
approximately 41,000 m2
Electrical Works.
CURRENT PROJECTS

The Medical Wellness Project


Scope of works RSC Value Add/ Achievement

The scope of work under this


contract includes Concrete
Fast Track Project
Package For Sub-Structure
The Six Senses Works
Infrastructure Projects
Infrastructure ILLUSTRATIVE PROJECTS

Scope of works RSC Value Add/ Achievement

EPC (Engineering, Procurement, and


Construction) all Utilities and Systems
Removing the Debris & Backfilling & The scope of work includes
Grading. Earthwork, Dewatering,
Water Distribution System and Fire Water Concrete Works, Steel
System. Structure, Waterproofing,
Sanitary Sewers Systems. Embedded Mechanical &
Development for HOP Phase-V Irrigation and Landscape Systems. Electrical
Project Yanbu Asphalt Concrete Paving, Concrete Walks,
Concrete Curbs, and Pavement marking
Telecommunication System and Electrical
System
Infrastructure ILLUSTRATIVE PROJECTS

Scope of works RSC Value Add/ Achievement

The scope works to execute of


Sewerage - Network & House The project was a fast-track
Connections project covers projects and completion meet
Sewerage network for Eastern about 200-KM Lines and 10,500 the target.
Naseem - Riyadh House Connections
Infrastructure ILLUSTRATIVE PROJECTS

Scope of works RSC Value Add/ Achievement

Execution of 1,885 LM for


Sewerage Network; for 800mm
Diameter pipeline total length The project was a fast-track
65LM; 900mm Dia total length projects and completion meet
Main Sewerage Network for North 525LM; 1600mm Dia total length the target.
Riyadh 1235M. Horizontal pipes and
vertical pipes position
Infrastructure ILLUSTRATIVE PROJECTS

Scope of works RSC Value Add/ Achievement

• Construction of two
kindergarten schools
The scope of work includes
• Construction of Business
Earthwork, Dewatering,
Center and Safety Training
Concrete Works, Steel
Center
Structure, Waterproofing,
Construction of Royal Commission • Refurbishment to the Royal
Embedded Mechanical &
Support Facilities Commission entrance
Electrical
• Improvement to Al-Huwaylat
(SABCO) compound, etc.
Infrastructure ILLUSTRATIVE PROJECTS

Scope of works RSC Value Add/ Achievement

Provide water to Utilities Area in


Um AL Hussany by 13.8 KM
temporary water pipeline include Fast-Track Project
TEMPORARY WATER LINE FOR 41 valve chambers and 4 points Contract Duration 180 Days
SINDALAH ISLAND NEOM of Horizontal Directional Drilling
(HDD)
Infrastructure On-Going Project

P&C of Shared Services Network – Al Jubil


Scope of works RSC Value Add/ Achievement

Firefighting Water Tanks and Piping


Works.
The scope of work includes
MV Cables 500 & 185 mm2 and RMU
Earthwork, Dewatering,
Rooms
Concrete Works, Steel
LV Cables 4Cx300 mm2
Structure, Waterproofing,
P&C of Shared Services Network Sea Water Cooling Network.
Embedded Mechanical &
Industrial Wastewater Network.
Electrical
Utility Culverts, Pipe Sleepers.
Sanitary and Potable Connections.
Wa t e r / F i r e p r o o f i n g
Projects
ILLUSTRATIVE PROJECTS

Water Proofing Projects


Scope of works RSC Value Add/ Achievement

Design and construction of Using New Water Proofing


WP system for MASAR 7 effective technology for critical
MASAR Project KM Tunnel and under structure adjacent to ZAMZAM
MECCA Ground buildings water

Design and construction of


Developed a Waterproofing
the WP system for the
system that meets the
OLYA TOWERS underground structures for requirement of the project
Riyadh OLYA Towers

Design and construction of Developing a WP system that


the WP system for the meets the project special fast-
AVENUE MALL Avenue Mall – Riyadh tracking requirement.

Design and Construction Developing a WP system that


of Underground meets the project special
SINDALAH Island Waterproofing system for sustainability and Environmental
NEOM Sindalah requirement.
ILLUSTRATIVE PROJECTS

Water Proofing Projects


Scope of works RSC Value Add/ Achievement

Provided a waterproofing
Underground system that has a fast
Waterproofing Works for application and meets the
DGDA Project Tunnels – Riyadh warranty requirement

Design and construction of Developed the Waterproofing


the WP system for the System by applying a Special
Lucid Motor Roof WP for SKD Building Tapered Insulation system to
Factory Phase 1 - KAEC form the slope required

Provided Waterproofing
Underground Solutions for Complicated
Waterproofing Works for Structures such as Submarines,
Red Sea Marine Marine Life institute Grand Reveal that are directly in
Life Inst structure contact with the Sea Water.

Underground WP Works Developed a Waterproofing


for Hotels Six Sense, system that meets the
Six Sense, Rosewood, Rosewood, and Four sustainability and environmental
Four Season Season requirement of the project
ILLUSTRATIVE PROJECTS

Epoxy Coating Projects


Scope of works RSC Value Add/ Achievement

Developed Waterproofing
Roof Waterproofing works solution using epoxy system to
Alula Rehabilitation using epoxy products match the surrounding area.
Centre

Provided Epoxy Coating system


Epoxy Coating Works for for Light, Heavy, and Extra
Bujiri Car Park Project heavy duties area along with
Bujiri Car Park Roam Marking Works

Provided Epoxy Coating system


Epoxy Coating Works for for Light, Heavy, and Extra
Samhan Car Park Project heavy duties area along with
Samhan Car Park Roam Marking Works

Fireproofing Projects

Provided a solution for


Cementitious Fireproofing fireproofing in Bulk Plant using
Works for Aramco Bulk Cementitious Fireproofing
Riyadh Bulk Plant Plant system to meet the requirement
of the project.
ENGINEERING
Engineering Team Engineering Capabilities
1. Structural Engineering
 Prepare design drawings, design reports and calculation sheets for
all types of structures.
 Our expertise covers:
• Residential and commercial buildings
• Warehouse and factory units
• Various Government facilities
• Senior Living / Aged Care
• Low-medium rise buildings
• High-rise towers

2. Geotechnical Design
 Study geotechnical investigations and prepare factual reports.
 Calculate bearing capacities, settlement, and pile capacities.
 Build numerical models for all underground structures.
 Design all kinds of shoring and dewatering systems.
 Foundation system, retaining systems, deep structures, piles and
diaphragm walls slurry shafts and underground structures.
 Advanced complex foundation analysis.

3. Marine Design
 Design and upgrade of quay walls including gravity, sheet piled,
piled and cellular types.
 Design of Breakwaters, emerged, submerged, floating and eco-
friendly types.
 Design of offshore and near-shore marine facilities.
 Design of Sea pipelines.
 Mooring and berthing studies.
 Design of shore protection breakwaters, revetments, and groins.
 Specialized hydrodynamic and sedimentation studies.

More than 52 Design Engineer


Used Software
Software Usage
Plaxis 2d/3d Structural and Geotechnical Analysis
CSI Sap2000 Structural analysis and design
GEO5 software Geotechnical
IDEA StatiCa Connections & section design
CAD Earth (sub program for
Surveying tool
autocad)
Autocad Drawing & Drafting
Revit Modeling & Drafting & BIM
ANSYS (workbench static
structural)
Design & Analysis for any structure Sample software output
Delft Dsheet Sheet pile design
Delft Mwell dewatering design
ETABS + CSiDetail Structural analysis and design
Structural analysis and design for slabs and
CSI SAFE
foundations
DHI FeFlow Marine design
Lumion 3d Visilaization
Mikezero Marine design
Tekla Tedds design & reporting

Autodesk Construction Cloud BIM tool


(for all BIM team members)

Tekla Structures Design & Drafting


Synchro Pro BIM tool
Sofistik (Reinforcement) shop drawings tool
Sofistik ( BiMTOOLS) BIM tool
ARC GIS Pro Surveying tool
BIM CAPABILITY BIM IMPLEMENTATION
The delivery team has the capability to produce various dimensions of Building Information
Models (BIM). These dimensions include:
1. 4D BIM Simulation: This involves linking 3D models with schedule-related information, such
as site surveys and logistics models. It allows for the creation of a virtual construction
sequence, providing insights into how construction activities will be performed, tracked, and
reported.
2. 5D BIM: This dimension incorporates budgetary and cost-related considerations. It enables
stakeholders to understand, analyze, discover, and record the impact of changes on the
project cost.
3. 6D BIM: This dimension focuses on sustainability by adding relevant information to the
geometric model of the building. It helps in assessing environmental performance and
optimizing resource usage.
4. 7D BIM: This unique approach consolidates all facility management processes within the
building information model and producing Cobie sheets and parameters in accordance with
client requirements for effective facility management.

Oure expertise in BIM allows for the generation of models that encompass these dimensions,
providing comprehensive and valuable insights for design, construction, and facility management
processes.

 We have established documented policies, systems, and procedures in alignment with ISO
19650 standards to achieve effective BIM implementation.
• We have a well-defined documentation hierarchy, including the BIM Execution Plan (BEP),
Master Information Delivery Plan (MIDP), These documents outline the distinct BIM
procedures and anticipated deliverables at each stage of the project lifecycle.
• Our QA/QC process integrates systematic reviews and thorough audits of project models and
documentation. BIM WORKFLOW
• We actively engages in collaborative sessions involving project stakeholders, facilitating their
participation and validation of the BIM processes and outputs.
• We have planned to provide training to team members in BIM-related skills. The training
programs are designed to align with the requirements of the BIM Standard ISO 19650.
• We have established iterative process of producing a BIM that evolves throughout the stages
of a project:
a. Initial Model Creation: The process begins with the creation of an initial BIM
model based on available project information, such as architectural drawings, site
surveys.
b. Information Gathering and Collaboration: As the project progresses, additional
information is gathered from various stakeholders.
c. Clash Detection and Coordination: Clash detection is performed to identify and
resolve clashes or conflicts between different disciplines. This step helps ensure
coordination and avoid issues during construction.
d. Documentation and Deliverables: Throughout the iterative process, the BIM
model is used to generate documentation and deliverables. This may include
construction drawings, schedules, quantities, cost estimates, facility management
data (Cobie)
E Q U IP M E N
T
NOT LIMITED TO
N.O. VESSEL TYPE NAME

FLAT BARDGE
1 FLAT TOP BARGE SANTORINI II
2 FLAT TOP BARGE RIYAH I
3 FLAT TOP BARGE GTO 45
4 FLAT TOP BARGE GTO 46
5 FLAT TOP BARGE GTO 1803
6 FLAT TOP BARGE GTO 1901
7 FLAT TOP BARGE GTO 193
8 FLAT TOP BARGE GTO 1202
9 FLAT TOP BARGE GTO 2507
10 FLAT TOP BARGE GTO 2509
11 FLAT TOP BARGE GTO 42
12 FLAT TOP BARGE GTO 1204
13 FLAT TOP BARGE GTO 152
14 FLAT TOP BARGE GTO 154
15 FLAT TOP BARGE GTO 156
16 FLAT TOP BARGE GTO 197
17 FLAT TOP BARGE GTO 1902
18 FLAT TOP BARGE GTO 395
19 FLAT TOP BARGE GTO 280
NOT LIMITED TO
N.O. VESSEL TYPE NAME
TUGBOAT
20 TUGBOAT DONA X
21 TUGBOAT ES RAIN 3200
22 TUGBOAT RAWABI 1
23 TUGBOAT RAWABI 2
24 TUGBOAT RAWABI 3
25 TUGBOAT RAWABI 4
26 TUGBOAT RAWABI 5
27 TUGBOAT RAWABI 6
28 TUGBOAT RAWABI 7
29 TUGBOAT RAWABI 8
30 TUGBOAT RAWABI 11R
31 TUGBOAT RAWABI 14
32 TUGBOAT RAWABI 15
33 TUGBOAT RAWABI 17
34 TUGBOAT RAWABI 28
35 TUGBOAT RAWABI 31
36 TUGBOAT RAWABI 32
37 TUGBOAT RAWABI 36
MULTICAT
38 MULTICAT RSC II
39 MULTICAT R.S.C.2
40 MULTICAT SWISCO SUNRIZE
41 RINGER MARINE PEDESTAL SAM - 3000
DREDGER
42 DREDGER OSMAN I
43 DREDGER OSMAN II
THANK YOU

You might also like