BU Fabrication
Finow Plant 1900
Finow Rohrsysteme GmbH 4
BU Fabrication
General Information
Key figures
FINOW factory near Berlin Total area 125.000 m²
Manufacturing area 20.000 m²
Employees 80
Capacity/year 3.600 t
Max. annual workload 220.000 h
Finow Rohrsysteme GmbH 5
BU Fabrication
General Information
Finow is producing piping systems and components for power plants,
the oil & gas industry, offshore wind farms, pipelines and the
construction industry at our own production facilities in Eberswalde.
Our services include :
Inductive bending
Heat treatment
Mechanical treatment
Plasma cutting
Welding
Sand blasting
Corrosion protection
Quality assurance
(destructive/non destructiv)
Finow Rohrsysteme GmbH 6
BU Fabrication
Customer
Finow Rohrsysteme GmbH 7
Reference Project
Construction - Al Wasl Plaza, World Expo 2020 Dubai
Customer:
Cimolai S.p.a.
General contractor:
Cimolai Rimond Middle East
Contracting LLC
Scope:
The Trellis is a long-span shell structure
that extends across the 130 m of the
central plaza area and rises to a height
of 67 m. Finow Scope includes
inductive bending, heat treatment and
cutting of pipes.
Project data:
Pipe Size (mm) 508 x 10/20 Execution period
Material S 460 September – December 2018
Finow Rohrsysteme GmbH 8
Reference Project
Construction - Al Wasl Plaza, World Expo 2020 Dubai
Customer:
Cimolai S.p.a.
General contractor:
Cimolai Rimond Middle East
Contracting LLC
https://www.youtube.com/watch?v=H8bc0zikzcw
Finow Rohrsysteme GmbH 9
Reference Project
Construction - Al Wasl Plaza , World Expo 2020 Dubai
Customer:
Cimolai S.p.a.
General contractor:
Cimolai Rimond Middle East
Contracting LLC
Finow Rohrsysteme GmbH 10
Reference Project
Borkum Riffgrund 2 – Offshore Wind Park
Customer:
ST³ Offshore sp.zo.o.
General contractor:
Dong Energy (Orsted)
Scope of service:
Manufacturing of J-Pipes and grout
systems
Project data:
Pipe Size (mm) 406 x 10 Execution period
Material S 355 January – October 2017
Finow Rohrsysteme GmbH 11
Reference Projects
Renewables – Race Bank, Burbo Bank, Valje Mate, Walney
Customer:
Iemants b.v.
General contractor:
Smulders Group
Scope of service:
Manufacturing of J-Pipes
Project data:
Pipe Size (mm) DN 350–DN 750 Execution period
Material S 355 2015 - 2017
Finow Rohrsysteme GmbH 20.02.2019 12
Reference Project
Oil & Gas – Exhaust gas cooler in a silicon factory (NOR)
Customer:
Wacker Chemicals Norway AS
General contractor:
EPC Kraftanlagen Munich
Scope of service:
Project Management, Engineering,
Procurement, Prefabrication, Erection,
Tie-in and system check out
Project data:
Piping + Steel 600 t Execution period
Material 10CrMo, X15 April 2018 – May 2019
Jens Buchberger 13
Reference Project
Oil & Gas – Exhaust gas cooler in a silicon factory (NOR)
Customer:
Wacker Chemicals Norway AS
General contractor:
EPC Kraftanlagen Munich
Scope of service:
Project Management, Engineering,
Procurement, Prefabrication, Erection,
Tie-in and system check out
Jens Buchberger 14
Reference Project
Oil & Gas – Replacing of pipe bundle NH³ process unit
Customer:
SKW Piesteritz
General contractor:
Kraftanlagen München
Scope of service:
Procurement, Prefabrication, Erection
Project data:
Pipe + Steel frame 180 T Execution period
Material 10CrMo June 2018 – July 2019
Finow Rohrsysteme GmbH 15
Reference Project
Louisiana – NH³ Heat Waste Recovery
Customer:
Steinmüller Engineering
General contractor:
CF Industries Nitrogen llc
Scope of service:
Heat exchanger
Project data:
Pipe Size (mm) DN 40 Execution period
Material 13CrMo January 2018 – September 2018
Finow Rohrsysteme GmbH 16
Reference Project
Ptolemais V – Power Plant
Customer:
Mitsubishi Hitachi Power System
General contractor:
Terna
Scope of service:
High pressure + low pressure piping
system turbine island
Project data:
Pipe Size (mm) diverse Execution period
Material P91, 10CrMo October 2016 – June 2018
Finow Rohrsysteme GmbH 17
Reference Project
North Stream I
Customer:
Thyssen Krupp Uhde
Scope of service:
Manufacturing of 2 Heating Modules to
fill the Baltic Sea pipeline with
preheated gas
Project data:
Weight (t) 180
Piping (mm) up to DN 400
Finow Rohrsysteme GmbH 18
BU Fabrication
Fabrication facilities
Inductive bending machines
IBM 360 max. Ø: 440 mm
max. wall thickness: 70 mm
IBM 1200 max. Ø: 1.220 mm
max. wall thickness: 120 mm
Finow Rohrsysteme GmbH 19
BU Fabrication
Fabrication facilities
Cold bending machines
2 machines min. Ø: 20 mm
max. Ø: 150 mm
Finow Rohrsysteme GmbH 20
BU Fabrication
Fabrication facilities
Heat treatment
Furnace I L x Bx H = 9.100 x 5.100 x 2.000
max weight: 16 t
Furnace II L x Bx H = 11.800 x 6.500 x 2.300
max weight: 40 t
Finow Rohrsysteme GmbH 21
BU Fabrication
Fabrication facilities
Plasma cutting
2 CNC machines Pipe cutting, incl. welding edge
Plate cutting
Finow Rohrsysteme GmbH 22
BU Fabrication
Fabrication facilities
Spool Measurement
• Free-based 3D coordinate measuring of the spool geometry
and bending angles
• Computerized measuring and documentation
• Measuring precision: Geometry 0,1 mm, Bending angle 0,1°
Finow Rohrsysteme GmbH 23
BU Fabrication
Fabrication facilities
Mechanical treatment
2 Boring Mills Welding edge preparation
Boring of nozzles
Finow Rohrsysteme GmbH 24
BU Fabrication
Fabrication facilities
Welding
WIG, MIG, MAG, E-Hand, Submerged arc welding
Jens Buchberger 11.10.2018 25
BU Fabrication
Fabrication facilities
Sand blasting Corrosion protection
2 Cabins Spray- and roll equipment
Finow Rohrsysteme GmbH 26
BU Fabrication
Quality assurance
Inhouse Quality Assurance
Non destructive material testing Radiography by X-ray tube, isotop (RT)
Ultrasonic testing (UT)
Magnetic particle flaw test (MT)
Penetration test (PT)
Leak test (LT)
Visual test (VT)
Endoskopic examination
Material testing labratory Hardness test
Tesile and impact test
Face bend test
Metallography
Spectral analysis
Finow Rohrsysteme GmbH 27
BU Fabrication
Qualifications
Cerifications
ISO 9001 (Quality)
SCC (Occupational safety)
ISO 50001 (Environmental protection)
DIN EN ISO 3834 – 2
DGRL 97/23/EG appendix III, module H/H1
ASME U-Stamp
ASME S-Stamp
ASME PP-Stamp
EN 1090-1/-2 (Steel)
Finow Rohrsysteme GmbH 28
BU Fabrication
Contact
For questions and enquiries please contact:
Finow Rohrsysteme GmbH
Angermünder Strasse 101
16225 Eberswalde
Germany
Jens Buchberger (MD)
Tel: +49 3334 57 120
Mobile: +49 1520 3635639
Mail: jens.buchberger@finow.de
Web: www.finow.de
Finow Rohrsysteme GmbH 29