Chairman Update
Chairman Update
Feb’ 2024
FBI-CV Shoe
FBI – CV Shoe Plant
Capacity
Operations No of machine
CV Shoe/Day CV Shoe/Year CV Shoe/Day CV Shoe/Year
• Location for all Quality gauges has been fixed on 2 welding machine and rest will be
• SFMTP for Cell leaders has been started in FBI plant and training is also completed for
3.59%
6000 4.00% 8.00%
6000
5037
7.59%
7.43%
5000
4200
3813
3.00% 6.00%
6.50%
6.43%
3304
3342
4000
2.50% 5.00%
1.74%
3000
2132
2.00% 4.00%
1732
1.24%
1.20%
2000
3.94%
3.80%
1.50% 3.00%
1.09%
3.44%
0.62%
1000
0.66%
1.00% 2.00%
0 0.50% 1.00%
23 23 t'2
3 23 c'2
3
'2
4 24
g' p' v' an b'
Au Se Oc No De J Fe 0.00% 0.00%
3 23 3 23 3 4 24 23 23 3 23 3 24 24
g '2 p' t'2 v' c'2 '2 b' g' p' t'2 v' c'2 n' b'
Au S e Oc
N o D e J an F e Au S e Oc
N o D e J a F e
Avg Output Target
CV Shoe Rework
Trend
5.00% 3.00%
2.50% 2.28%
4.00%
3.37% 1.96%
3.06% 2.93% 2.00%
1.68%
3.00% 1.55%
1.50% 1.22%
2.00% 1.52% Plant not
1.00%
Operational Due to
1.03% 1.05%
1.00% Shifting
0.50%
0.00%
0.00% 0.00%
Aug'23 Sep'23 Oct'23 Nov'23 Dec'23 Jan'24 Feb'24 Aug'23 Sep'23 Oct'23 Nov'23 Dec'23 Jan'24 Feb'24
Riveting Rework
2.50%
1.94%
2.00%
1.51% 1.48%
1.50% 1.38%
1.07%
1.00%
0.63% 0.63%
0.50%
0.00%
Aug'23 Sep'23 Oct'23 Nov'23 Dec'23 Jan'24 Feb'24
Improvements-FBI CV
Shoe
Master sample provided at forming machine so that changeover Dosing pump provided for chemical adding during
can do simultaneously of both blanking and forming machine Pre-treatment process which Operator was filling
which reduces changeover time from 85min to 45min. manually earlier.
PT trolley design changed from horizontal to vertical Cleaning table modified providing supporting tools
part placing, eliminating brown patches from shoe location
after PT operation
Repeated Issues-FBI
Production order
RM Availability release Cell planned
Check order BOM-Availability
RM Availability
Check Check
Separate orders for each Child Parts
component
Heijunka Separate order Final FG Order FG Storage
Board Bar Cutting
Knurled & Roller Pin Heijunka Board Area
Child Parts
Heijunka CNC Turning
Forming Forming Forming Board QST – Good parts Order
Roller Return Return confirmation confirmation
Retainer Spring B Spring A RST – Rej. Book in SAP
Surface
Grinding
1 Day Plan & Material
Hook Press Hook Press on Flow rack
Re-striking Child Components/
Fit Fit Packaging
Packaging Material
F – Mark 1. Child Part Issuance
Knurling 2. Packaging Material
Stamping
Issuance
3. BOP Part Issuance
Tempering
Induction
Hardening
PDI
Tempering
Child Part
Order
Store
Confirmation
PDI
QST – Good parts
confirmation
QST – Good parts RST – Rej. Book in SAP
confirmation Powder Order
RST – Rej. Book in SAP Coating Platening IQC
Confirmation
Kit-Set Update
• Scrap conveyor installed on one CNC turning machine and other machines has been
• All packed material 18168 sets has been rechecked and found 1% Approx. (rework & scrap
material) because of quality issues like paint peel off , Anchor pin nub dia. NG and Wiggle
2 0
75 75 75 75 75
2 0 57 60
49 51 53 56
34 Audit
2 0 47
2 2 2 2 2 start from
0 0 0 0 0 0 18 34
16 week 3
19 19 16 16 18
26 31
17 17 19 20 21 19 20 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9
Packing
not done
5%
680
0.5% 3.6%
589
535
1%
511
465
3.9%
2.5% 1.8% 2%2.8% 0.36% 0.49% 0.22%
0.14%
0.48% 0.22% 0.30%
0.15%
0.26%
0.20%
0.16% 0.09% 0.11% 0.16% 0.06%
150
2.3%
0.8% 0.9% 0.0% 1.3% WEEK WEEK WEEK WEEK WEEK WEEK WEEK WEEK WEEK
0.3% 0.2% 0.0% 1 2 3 4 5 6 7 8 9
0
Week Week Week Week Week week week week week WEEK WEEK WEEK WEEK WEEK WEEK WEEK WEEK WEEK
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9
BEFORE AFTER
Issues Improvements
Part NG At Machine due to corner stuck with quill . Groove cut in quill to enable free movement of part.
Results Results
• Per shift 2 manpower was employed in the process • No Manpower required.
• Leads to open orders for part. • Zero open order for part
• Time consumed :- 1280 Pcs completed in 2 days • Per shift 2000 production
• Per shift 700 Pcs production • Saving/Part = Rs. 0.94 ( only wages)
• Cost per part was 1.14 rupees ( only wages) • Saving/Month Rs.47K, Saving/ Annum 5.64 lacs
Improvements-FBI KITSET
GO and NO-GO gauge for checking GO and NO-GO gauge for checking
Spring A to reduce inspection process. knurled pin to reduce inspection process.
Shadow box has been made for ensuring All component location has been freeze
all parts picked by operator for reducing part miss at Kit set line
Improvements– KIT Set line
PV Bonding MBSI-KAMI
MBSI Update
• Material & Information flow has been defined along with required infrastructure for
streamlining the process.
• All MAT production system best practices visual boards has been implemented on shop
floor.
• Conveyor material is received in plant for transferring material from store racking
arrangement and will be installed by 10 Feb’2024.
• Team has achieved 28 K sets output against 30 K plan in January’2024 month with average
plant running in 1 shift.
• Team is start hiring second shift operators for training purpose and has been planned to
run 2nd shift by mid Feb’2024.
• Repeated issue of first part approval bypassed has been observed on linner cutting
machine and training provided to team for follow FPA SOP.
MBSI Updates
1424
2.30%
1294
1272
1260
2.50%
1236
1400
1117
1200
1.80%
990
2.00%
1000
1.42%
1.35%
1.31%
800
660
1.19%
1.18%
1.50%
1.13%
1.11%
600
400 1.00%
200
0.50%
0
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9
0.00%
Avg Output Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9
Activity Timeline
Brake Shoe Bonding MBSI
Month November’23 December’23 Jan'24 Feb’24
S. Responsi
Activities Remarks
No. bility Week 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9
Trollies/ Plan
bins/
6 unbalance Project Done
rack for
material Actual
movement
Plan
8 Y-Clamps Project/ Done
(1100 nos.) Purchase
Actual
PLAN ONGOING DONE NOT STARTED
Improvements-MBSI
Weighing scale added at glue tank, alarm will ring Fixture provide at radius plate, no need to locate H
when glue becomes less than minimum level mark on shoe for lining pasting
Andon light implemented at drying oven which will Acrylic cover provided at shoe dipping to control
turn red when oven temp. goes out of spec foreign particles
Thanks