AL KAMIL POWER STATION
SITE INDUCTION
10/31/25 1
SMOKING RESTRICTED
1/29/2013
CONTENTS
Introduction to Al Kamil Power
Station site.
You will learn about
◦ The Site Safety System
◦ How you can work safely in this plant
◦ Dangers within site
◦ Action in Emergencies
◦ Site Cyber Security
10/31/25 3
LOCATION
Briefing on site layout:
Al Kamil power plant site is located
about 25km northwest of Al Kamil town
in the Sharqiya region.
Entry from the north side and
emergency exit is available in west
side.
10/31/25 4
AKCS Policies for
QE and OHS
10/31/25 5
AKCS Policies for
Security and Cyber Security
10/31/25 6
N
ALKAMIL POWER STATION SITE MAP
M MP
DESCRIPTION
7 1 DFO Storage tank-1A
4
2 DFO storage tank-1B
22 3 PRT area
5 4 Security gate House
6
1 2 3 8 5 Parking area
6 Work Shop/Ware House
7 STP
8 Lay down area
E 9 BSDG Building
19
10 Fire water tank
11 Raw water tank
12 Fire pump house
18
13 D.M Plant
14
20 14 Compressor house
15 GT-1A Block
17 16 15
15A GT-1A Off Base Gas Skid
21 16 GT-1B Block
17 A 16A 15A 13 16A GT-1B Off Base Gas Skid
23 17 GT-1C Block
12 9 17A GT-1C Off Base Gas Skid
18 CPI
11 10 19 Fuel oil Unloading area
Admin Building
20
24 ( AKPC Building Included )
SG 21 Mercury Extraction Unit.
M- Main Gate Entry only for Fuel oil Tankers 22 New Ware house
E- Emergency Gate 23 11KV / 415 V Transformer
SG- SwicthYard Gate Designated Route 24 FEP#3&4 Room
MP- Muster Point
Ear Protection Zone
First aid point
Ear Protection Zone( during Equipment Operation ) / GSM use prohibited area, Hazardous waste storage area
Emergency Spillage control Kit
Safety Shower
Eye wash
Major Equipments
3 95 MW, GE Frame 9 Gas Turbines.
2 5870 MT capacity Diesel fuel oil storage tanks
NG Pressure reducing Terminal
3 122 MVA, GSU Step up Transformers (15kv-132kv)
3.6 MW Black Start Diesel Generator
Fire water and Raw water system
Compressed air system
3 Unit Aux. Step Down Transformers (15kv-6.6kv)
6 Service Step Down Transformers (6.6kv-415v)
111Kv Aux. Supply Step Down Transformer (11kv-
415v)
10/31/25
Major Dangers
Fire
Electric shock
Falling from height
Slippery surfaces
Hot pipelines
Chemical spillages
Gas Leakage
Noise
CO2
10/31/25
Important Sign Boards On
Site
Important Sign Boards On
Site
Personal Protective
Equipments
Compulsory Minimum
PPEs required to work in
Plant :
a. Hard Hat at all times.
b. Safety Footwear.
c. Safety Glass.
d. Discuss details of PPE
to be used for the
tasks to be
undertaken at site.
*Visitors accompanied by AKCS personnel, wearing normal covered shoes can walk on the road
inside plant .
10/31/25
First Aid Locations
First
Aid Room ( AKPC Office )
Ware house ( First Aid Point)
Control Room.
Security Gate House.
10/31/25
Emergency Phone
Control Room: 100
OR
You can contact control
room from nearby fire
fighters phone
10/31/25
Evacuation
System
Public annunciation system
( Voice Evacuation system) and
Emergency Siren is provided to
alert people working inside the
site, in case of any emergency
situation.
10/31/25
Muster Points (Fire assembly
points)
Near Main Gate House
10/31/25
Vehicle Movement At Site
Only vehicles which are necessary for the
work will be allowed to enter the site.
All vehicles on site will be checked before
entry and exit by security staff
Driver should be competent and have a
valid license from Royal Oman Police(ROP)
and same will be confirmed by security.
Maximum speed limit of 10KM/h will be
adhered to at all times on site.
All large vehicles like..
Cranes,Tankers,platforms.. etc. must
travel in a planned route and under the
personal supervision of designated person
only.
10/31/25
Safety Rules Highlights
Safety Documents- Permit, Permit(ROSH),
Permit(Test), Permit(Live) and Permit (Access).
Persons Involved: Safety Controller, Safety
Co-ordinator, Issuer, Acceptor and Designated
Person.
10/31/25
Environmental Awareness
WASTE SCHEDULE DURING NORMAL
OPERATION (APPROX.)
A) NON HAZARDOUS WASTE DOMESTIC WASTE
a. Office and Kitchen Waste etc
b. Packing Material
c. Plant Effluents
d. DM Plant neutralizing pit effluent ,compressor wash
& floor wash effluent , etc
e. Sewage
B) HAZARDOUS WASTE
a. Waste Oil and Grease
b. Oil Sludge
c. Sewage Sludge
d. Chemical Waste : Not expected to be produced during Normal
Operation Conditions
10/31/25
Environmental Awareness
1. Waste Collection Bins at
Site
Green Bins ( Only for Domestic Waste)
Red Bins ( Only For Hazardous Waste)
Hazardous waste should be segregated
and separated before putting inside the
Hazardous waste bin.
10/31/25
10/31/25
10/31/25
COVID-19
Safety
Signs
At
Site
10/31/25
ENGIE – Life Saving Rules
Working At Height - Safe
Practices
10/31/25
ENGIE – Life Saving Rules
Confined Space – Safe
Practices
10/31/25
Plant Cyber Security
Cyber Security’s goal: Protect our
information and information systems
Cyber Security is: “Protection of
information systems against unauthorized
access to or modification of information,
whether in storage, processing or transit,
and against the denial of service to
authorized users, including those measures
necessary to detect, document, and counter
such threats.”
10/31/25
Plant Cyber Security
(Information)
Information is considered sensitive if the loss
of Confidentiality, Integrity, or Availability could
be expected to have a serious, severe, or
catastrophic adverse effect on organizational
operations, organizational assets, or individuals.
Types of sensitive information include:
◦ Personnel
◦ Financial
◦ Payroll
◦ Medical
◦ Privacy Act information.
◦ IP address
◦ User Name & passwords
10/31/25
Cyber Security is everyone
Responsibility
Use only authorized thumb drives/USB by Site ICS engineer
Don’t write down passwords
Be careful how you dispose of anything that might contain
sensitive information
Never transmit secure information over an unsecured devices
Properly label removable media such as CDs, USBs or DVDs
All removable media intended to be used inside plant are
subjected to be sanitized by ICS Engineer before use under
Company ICS procedure
All Notebook computers intended to connect to Plant ICS
system shall be handed over to ICS engineer for security
checks before performing connection
Make sure your Notebook antivirus is updated before use in
Plant ICS system
10/31/25
If your system acts unusual!
Report
immediately to
Plant ICS
Engineer
Trojan Spyware Worm
Horse 10/31/25
ICS System Awareness
Videos
https://www.youtube.com/watch?v=DtGauACbDC0
https://www.youtube.com/watch?v=_eNB1gq5gbA
10/31/25
Your Responsibilities
Make sure that you have been issued with a gate
pass at gate house before going to work place
Inform control room before starting any work
Make sure you have appropriate safety
document before starting work.
Ensure that you are on the correct
plant/apparatus before starting work.
Ensure equipment is made safe to work.
Report all accidents , near miss or unsafe act /
condition to the shift charge engineer at control
room.
Report any Vulnerability of your laptop or USB to
ICS engineer
10/31/25
Your Responsibilities
Anticipating/found any Dangers, leave work
place and inform control room.
Maintain General safety while working
Smoking is not allowed inside the site
Always use the correct PPEs for the Job
Always use correct tools for the job
Always seek safe access
Keep the site tidy
Don’t use mobile phones inside the PRT area
and Off base gas filter skid.
If you are in doubt, please
ask.
10/31/25
END OF PRESENTATION