Verification and Validation
Topics covered
Verification and validation planning Software inspections Automated static analysis Cleanroom software development
Verification vs validation
Verification: "Are we building the product right. The software should conform to its specification. Validation: "Are we building the right product. The software should do what the user really requires.
The V & V process
Is a whole life-cycle process - V & V must be applied at each stage in the software process. Has two principal objectives The discovery of defects in a system; The assessment of whether or not the system is useful and useable in an operational situation.
V& V goals
Verification and validation should establish confidence that the software is fit for purpose. This does NOT mean completely free of defects. Rather, it must be good enough for its intended use and the type of use will determine the degree of confidence that is needed.
5
V & V confidence
Depends on systems purpose, user expectations and marketing environment
Software function
The level of confidence depends on how critical the software is to an organisation.
User expectations
Users may have low expectations of certain kinds of software.
Marketing environment
Getting a product to market early may be more important than finding defects in the program.
Static and dynamic verification
Software inspections. Concerned with analysis of the static system representation to discover problems (static verification)
May be supplement by tool-based document and code analysis
Software testing. Concerned with exercising and observing product behaviour (dynamic verification)
The system is executed with test data and its operational behaviour is observed
Static and dynamic V&V
Program testing
Can reveal the presence of errors NOT their absence. The only validation technique for nonfunctional requirements is that the software has to be executed to see how it behaves. Should be used in conjunction with static verification to provide full V&V coverage.
Types of testing
Defect testing
Tests designed to discover system defects. A successful defect test is one which reveals the presence of defects in a system.
Validation testing
Intended to show that the software meets its requirements. A successful test is one that shows that a requirements has been properly implemented.
10
Testing and debugging
Defect testing and debugging are distinct processes. Verification and validation is concerned with establishing the existence of defects in a program. Debugging is concerned with locating and repairing these errors. Debugging involves formulating a hypothesis about program behaviour then testing these hypotheses to find the system error.
11
The debugging process
12
V & V planning
Careful planning is required to get the most out of testing and inspection processes. Planning should start early in the development process. The plan should identify the balance between static verification and testing. Test planning is about defining standards for the testing process rather than describing product tests.
13
The V-model of development
14
The structure of a software test plan
The testing process. Requirements traceability. Tested items. Testing schedule. Test recording procedures. Hardware and software requirements. Constraints.
15
The software test plan
The testing process A description of the major phases of the testing process. These might be as described earlier in this chapter. Requirements traceability Users are most interested in the system meeting its requirements and testing should be planned so that all requirements are individually tested. Tested items The products of the software process that are to be tested sh ould be specified. Testing schedule An overall testing schedule and resource allocation for this schedule. This, obviously, is linked to the more general project development schedule. Test recording procedures It is not enough simply to run tests. The results of the tests must be systematically recorded. It must be possible to audit the testing process to check that it been carried out correctly. Hardw are and software requirements This section should set out software tools required and estimated hardware utilisation. Constraints Constraints affecting the testing process such as staff shortages should be anticipated in this section.
16
Software inspections
These involve people examining the source representation with the aim of discovering anomalies and defects. Inspections not require execution of a system so may be used before implementation. They may be applied to any representation of the system (requirements, design,configuration data, test data, etc.). They have been shown to be an effective technique for discovering program errors.
17
Inspection success
Many different defects may be discovered in a single inspection. In testing, one defect ,may mask another so several executions are required. The reuse domain and programming knowledge so reviewers are likely to have seen the types of error that commonly arise.
18
Inspections and testing
Inspections and testing are complementary and not opposing verification techniques. Both should be used during the V & V process. Inspections can check conformance with a specification but not conformance with the customers real requirements. Inspections cannot check non-functional characteristics such as performance, usability, etc.
19
Program inspections
Formalised approach to document reviews Intended explicitly for defect detection (not correction). Defects may be logical errors, anomalies in the code that might indicate an erroneous condition (e.g. an uninitialised variable) or non-compliance with standards.
20
Inspection pre-conditions
A precise specification must be available. Team members must be familiar with the organisation standards. Syntactically correct code or other system representations must be available. An error checklist should be prepared. Management must accept that inspection will increase costs early in the software process. Management should not use inspections for staff appraisal ie finding out who makes mistakes.
21
The inspection process
22
Inspection procedure
System overview presented to inspection team. Code and associated documents are distributed to inspection team in advance. Inspection takes place and discovered errors are noted. Modifications are made to repair discovered errors. Re-inspection may or may not be required.
23
Inspection roles
Author or owner The programmer or designer responsible for producing the program or document. Responsible for fixing defects discovered during the inspection process. Finds errors, omissions and inconsistencies in programs and documents. May also identify broader issues that are outside the scope of the inspection team. Presents the code or document at an inspection meeting. Records the results of the inspection meeting. Manages the process and facilitates the inspection. Reports process results to the Chief moderator. Responsible for inspection process improvements, checklist updating, standards development etc.
Inspector
Reader Scribe Chairman or moderator Chief moderator
24
Inspection checklists
Checklist of common errors should be used to drive the inspection. Error checklists are programming language dependent and reflect the characteristic errors that are likely to arise in the language. In general, the 'weaker' the type checking, the larger the checklist. Examples: Initialisation, Constant naming, loop termination, array bounds, etc.
25
Inspection checks 1
Data faults Are all program variables initialised before their values are used? Have all constants been named? Should the upper bound of arrays be equal to the size of the array or Size -1? If character strings are used, is a de limiter explicitly assigned? Is there any possibility of buffer overflow? For each conditional statement, is the condition correct? Is each loop certain to terminate? Are compound statements correctly bracketed? In case statements, are all possible cases accounted for? If a break is required after each case in case statements, has it been included? Are all input variables used? Are all output variables assigned a value before they are output? Can unexpected inputs cause corruption?
Control faults
Input/output faults
26
Inspection checks 2
Interface faults Do all function and method calls have the correct number of parameters? Do formal and actual parameter types match? Are the parameters in the right order? If components access shared memory, do they have the same model of the shared memory structure?
Storage If a linked structure is modified, have all links been management faults correctly reassigned? If dynamic storage is used, has space been allocated correctly? Is space explicitly de-allocated after it is no longer required? Exception Have all possible error conditions been taken into account? management faults
27
Inspection rate
500 statements/hour during overview. 125 source statement/hour during individual preparation. 90-125 statements/hour can be inspected. Inspection is therefore an expensive process. Inspecting 500 lines costs about 40 man/hours effort - about 2800 at UK rates.
28
Automated static analysis
Static analysers are software tools for source text processing. They parse the program text and try to discover potentially erroneous conditions and bring these to the attention of the V & V team. They are very effective as an aid to inspections - they are a supplement to but not a replacement for inspections.
29
Static analysis checks
Fault class Data faults Static analysis check Variables used before initialisation Variables declared but never used Variables assigned twice but never used between assignments Possible array bound violations Undeclared variables Unreachable code Unconditional branches into loops Variables output twice with no intervening assignment Parameter type mismatches Parameter number mismatches Non-usage of the results of functions Uncalled functions and procedures Unassigned pointers Pointer arithmetic
Control faults Input/output faults Interface faults
Storage management faults
30
Stages of static analysis
Control flow analysis. Checks for loops with multiple exit or entry points, finds unreachable code, etc. Data use analysis. Detects uninitialised variables, variables written twice without an intervening assignment, variables which are declared but never used, etc. Interface analysis. Checks the consistency of routine and procedure declarations and their use
31
Stages of static analysis
Information flow analysis. Identifies the dependencies of output variables. Does not detect anomalies itself but highlights information for code inspection or review Path analysis. Identifies paths through the program and sets out the statements executed in that path. Again, potentially useful in the review process Both these stages generate vast amounts of information. They must be used with care.
32
LINT static analysis
138% more lint_ex.c #include <stdio.h> printarray (Anarray) int Anarray; { printf(%d,Anarray); } main () { int Anarray[5]; int i; char c; printarray (Anarray, i, c); printarray (Anarray) ; } 139% cc lint_ex.c 140% lint lint_ex.c lint_ex.c(10): warning: c may be used before set lint_ex.c(10): warning: i may be used before set printarray: variable # of args. lint_ex.c(4) :: lint_ex.c(10) printarray, arg. 1 used inconsistently lint_ex.c(4) :: lint_ex.c(10) printarray, arg. 1 used inconsistently lint_ex.c(4) :: lint_ex.c(11) printf returns value which is always ignored
33
Use of static analysis
Particularly valuable when a language such as C is used which has weak typing and hence many errors are undetected by the compiler, Less cost-effective for languages like Java that have strong type checking and can therefore detect many errors during compilation.
34
Verification and formal methods
Formal methods can be used when a mathematical specification of the system is produced. They are the ultimate static verification technique. They involve detailed mathematical analysis of the specification and may develop formal arguments that a program conforms to its mathematical specification.
35
Arguments for formal methods
Producing a mathematical specification requires a detailed analysis of the requirements and this is likely to uncover errors. They can detect implementation errors before testing when the program is analysed alongside the specification.
36
Arguments against formal methods
Require specialised notations that cannot be understood by domain experts. Very expensive to develop a specification and even more expensive to show that a program meets that specification. It may be possible to reach the same level of confidence in a program more cheaply using other V & V techniques.
37
Cleanroom software development
The name is derived from the 'Cleanroom' process in semiconductor fabrication. The philosophy is defect avoidance rather than defect removal. This software development process is based on:
Incremental development; Formal specification; Static verification using correctness arguments; Statistical testing to determine program reliability.
38
The Cleanroom process
39
Cleanroom process characteristics
Formal specification using a state transition model. Incremental development where the customer prioritises increments. Structured programming - limited control and abstraction constructs are used in the program. Static verification using rigorous inspections. Statistical testing of the system
40
Formal specification and inspections
The state based model is a system specification and the inspection process checks the program against this mode.l The programming approach is defined so that the correspondence between the model and the system is clear. Mathematical arguments (not proofs) are used to increase confidence in the inspection process.
41
Cleanroom process teams
Specification team. Responsible for developing and maintaining the system specification. Development team. Responsible for developing and verifying the software. The software is NOT executed or even compiled during this process. Certification team. Responsible for developing a set of statistical tests to exercise the software after development. Reliability growth models used to determine when reliability is acceptable.
42
Cleanroom process evaluation
The results of using the Cleanroom process have been very impressive with few discovered faults in delivered systems. Independent assessment shows that the process is no more expensive than other approaches. There were fewer errors than in a 'traditional' development process. However, the process is not widely used. It is not clear how this approach can be transferred to an environment with less skilled or less motivated software engineers.
43
Key points
Verification and validation are not the same thing. Verification shows conformance with specification; validation shows that the program meets the customers needs. Test plans should be drawn up to guide the testing process. Static verification techniques involve examination and analysis of the program for error detection.
44
Key points
Program inspections are very effective in discovering errors. Program code in inspections is systematically checked by a small team to locate software faults. Static analysis tools can discover program anomalies which may be an indication of faults in the code. The Cleanroom development process depends on incremental development, static verification and statistical testing.
45