{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,8]],"date-time":"2026-03-08T03:30:03Z","timestamp":1772940603246,"version":"3.50.1"},"reference-count":42,"publisher":"Elsevier BV","issue":"8","license":[{"start":{"date-parts":[[2011,8,1]],"date-time":"2011-08-01T00:00:00Z","timestamp":1312156800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Expert Systems with Applications"],"published-print":{"date-parts":[[2011,8]]},"DOI":"10.1016\/j.eswa.2011.01.029","type":"journal-article","created":{"date-parts":[[2011,1,25]],"date-time":"2011-01-25T09:11:31Z","timestamp":1295946691000},"page":"9266-9273","source":"Crossref","is-referenced-by-count":49,"title":["Developing a new fuzzy model to predict burden from rock geomechanical properties"],"prefix":"10.1016","volume":"38","author":[{"given":"M.","family":"Monjezi","sequence":"first","affiliation":[]},{"given":"M.","family":"Rezaei","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.eswa.2011.01.029_b0005","doi-asserted-by":"crossref","first-page":"600","DOI":"10.1016\/j.tust.2007.11.003","article-title":"A fuzzy logic model to predict specific energy requirement for TBM performance prediction","volume":"23","author":"Acaroglu","year":"2008","journal-title":"Tunneling and Underground Space Technology"},{"issue":"2","key":"10.1016\/j.eswa.2011.01.029_b0010","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1016\/S0148-9062(99)00002-9","article-title":"Burden calculation for partially changed blast design conditions","volume":"36","author":"Adhikari","year":"1999","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0015","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1016\/S0148-9062(99)00007-8","article-title":"Fuzzy model for the prediction of unconfined compressive strength of rock samples","volume":"36","author":"Alvarez Grima","year":"1999","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0260","series-title":"The design of blasting rounds. Surface mining","author":"Ash","year":"1968"},{"key":"10.1016\/j.eswa.2011.01.029_b0020","unstructured":"Ash, R. L. (1973). The influence of geological discontinuities on rock blasting. Ph.D. thesis, University of Minnesota."},{"key":"10.1016\/j.eswa.2011.01.029_b0035","unstructured":"Bascetin, A. (1999). Optimal equipment selection in open-pit mines. Ph.D. thesis, Istanbul Technical University, Istanbul (in Turkish)."},{"key":"10.1016\/j.eswa.2011.01.029_b0230","unstructured":"Cebesoy, T. (1997). Surface mining equipment selection based on multi criteria fuzzy dominant algorithms. In Proceedings of the 15th mining congress of Turkey (pp. 79\u201387)."},{"issue":"4","key":"10.1016\/j.eswa.2011.01.029_b0045","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/0266-352X(95)94914-C","article-title":"Use of fuzzy sets for evaluating shear strength of soils","volume":"17","author":"Chuang","year":"1995","journal-title":"Computers and Geotechnics"},{"key":"10.1016\/j.eswa.2011.01.029_b0050","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/S1365-1609(02)00133-8","article-title":"Analysis of coal mine roof fall rate using fuzzy reasoning techniques","volume":"40","author":"Deb","year":"2003","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"issue":"1","key":"10.1016\/j.eswa.2011.01.029_b0055","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0888-613X(96)00118-1","article-title":"Knowledge-based fuzzy model for performance prediction of a rock-cutting trencher","volume":"16","author":"Den Hartog","year":"1997","journal-title":"International Journal of Approximate Reasoning"},{"key":"10.1016\/j.eswa.2011.01.029_b0060","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1016\/S0266-352X(00)00009-4","article-title":"Reliability analysis of slopes using fuzzy sets theory","volume":"27","author":"Dodagoudar","year":"2000","journal-title":"Computers and Geotechnics"},{"key":"10.1016\/j.eswa.2011.01.029_b0070","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/S0920-4105(00)00096-6","article-title":"A rule-based fuzzy model for the prediction of petrophysical rock parameters","volume":"29","author":"Finol","year":"2001","journal-title":"Journal of Petroleum Science and Engineering"},{"key":"10.1016\/j.eswa.2011.01.029_b0075","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/S0013-7952(02)00023-6","article-title":"A fuzzy triangular chart to predict the uniaxial compressive strength of the Ankara agglomerates from their petrographic composition","volume":"66","author":"Gokceoglu","year":"2002","journal-title":"Engineering Geology"},{"key":"10.1016\/j.eswa.2011.01.029_b0080","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.engappai.2003.11.006","article-title":"A fuzzy model to predict the uniaxial compressive strength and the modulus of elasticity of a problematic rock","volume":"17","author":"Gokceoglu","year":"2004","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"10.1016\/j.eswa.2011.01.029_b0090","series-title":"Neuro-fuzzy modelling in engineering geology","author":"Grima","year":"2000"},{"key":"10.1016\/j.eswa.2011.01.029_b0085","doi-asserted-by":"crossref","first-page":"413","DOI":"10.1016\/S0148-9062(99)00025-X","article-title":"Forecasting rock trencher performance using fuzzy logic","volume":"36","author":"Grima","year":"1999","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"issue":"3","key":"10.1016\/j.eswa.2011.01.029_b0095","first-page":"273","article-title":"Rockmass classification using fuzzy sets","volume":"20","author":"Habibagahi","year":"1996","journal-title":"Iranian Journal of Science and Technology Transaction B"},{"key":"10.1016\/j.eswa.2011.01.029_b0100","doi-asserted-by":"crossref","first-page":"109","DOI":"10.3233\/IFS-1993-1202","article-title":"Defuzzification in fuzzy controllers","volume":"1","author":"Hellendoorn","year":"1993","journal-title":"Journal of Intelligent and Fuzzy Systems"},{"issue":"1","key":"10.1016\/j.eswa.2011.01.029_b0105","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1016\/S0266-352X(95)00013-Z","article-title":"Fuzzy representation and reasoning in geotechnical site characterization","volume":"21","author":"Huang","year":"1997","journal-title":"Computers and Geotechnics"},{"key":"10.1016\/j.eswa.2011.01.029_b0240","volume":"Vol. 1","author":"Hustrulid","year":"1999"},{"key":"10.1016\/j.eswa.2011.01.029_b0115","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/j.ijrmms.2005.07.003","article-title":"An application of fuzzy sets to the Diggability Index Rating Method for surface mine equipment selection","volume":"43","author":"Iphar","year":"2006","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0245","series-title":"Rock characterization, testing and monitoring-ISRM suggested methods","author":"ISRM (International Society for Rock Mechanics)","year":"1981"},{"key":"10.1016\/j.eswa.2011.01.029_b0125","series-title":"Neuro-fuzzy and soft computing","author":"Jang","year":"1997"},{"issue":"3","key":"10.1016\/j.eswa.2011.01.029_b0135","first-page":"53","article-title":"Application of fuzzy set theory in the evaluation of roof categories in longwall mining","volume":"49","author":"Jiang","year":"1997","journal-title":"Mining Engineering"},{"key":"10.1016\/j.eswa.2011.01.029_b0250","series-title":"Drilling and blasting of rocks","author":"Jimeno","year":"1995"},{"key":"10.1016\/j.eswa.2011.01.029_b0145","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1016\/j.ijrmms.2004.03.095","article-title":"Influence of geological conditions on the powder factor for tunnel blasting","volume":"41","author":"Jong","year":"2004","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0150","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/S1365-1609(02)00112-0","article-title":"Estimating the deformation modulus of rockmasses: A comparative study","volume":"40","author":"Kayabasi","year":"2003","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0030","unstructured":"Konya, C. J. (1983). Blasting design. Surface mining environmental monitoring and reclamation handbook."},{"key":"10.1016\/j.eswa.2011.01.029_b0155","series-title":"The modern technique of rock blasting","author":"Langefors","year":"1963"},{"issue":"1","key":"10.1016\/j.eswa.2011.01.029_b0160","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0020-7373(75)80002-2","article-title":"An experiment in linguistic synthesis with a fuzzy logic controller","volume":"7","author":"Mamdani","year":"1975","journal-title":"International Journal of Man\u2013Machine Studies"},{"key":"10.1016\/j.eswa.2011.01.029_b0170","unstructured":"Monjezi, M., Dehghan, H, & Samimi Namin, F. (2007). Application of TOPSIS method in controlling fly rock in blasting operations. In Proceedings of the seventh international science conference SGEM, Sofia, Bulgaria (pp. 41\u201349)."},{"key":"10.1016\/j.eswa.2011.01.029_b0180","doi-asserted-by":"crossref","first-page":"1273","DOI":"10.1016\/j.ijrmms.2009.05.005","article-title":"Prediction of rock fragmentation due to blasting in Gol-E-Gohar iron mine using fuzzy logic","volume":"46","author":"Monjezi","year":"2009","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0175","doi-asserted-by":"crossref","first-page":"2637","DOI":"10.1016\/j.eswa.2009.08.014","article-title":"Prediction of backbreak in open-pit blasting using fuzzy set theory","volume":"37","author":"Monjezi","year":"2010","journal-title":"Expert Systems with Applications"},{"key":"10.1016\/j.eswa.2011.01.029_b0185","series-title":"Fuzzy logic with engineering applications","author":"Ross","year":"1995"},{"key":"10.1016\/j.eswa.2011.01.029_b0190","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/S0952-1976(03)00002-2","article-title":"An application of fuzzy sets to the geological strength index (GSI) system used in rock engineering","volume":"16","author":"Sonmez","year":"2003","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"10.1016\/j.eswa.2011.01.029_b0195","doi-asserted-by":"crossref","first-page":"717","DOI":"10.1016\/j.ijrmms.2004.01.011","article-title":"Models to predict the uniaxial compressive strength and the modulus of elasticity for Ankara agglomerate","volume":"41","author":"Sonmez","year":"2004","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0255","series-title":"Proceedings of the 32nd annual conference on explosives and blasting techniques","article-title":"Evaluation of artificial neural networks as a reliable tool in blast design","author":"Tawadrous","year":"2006"},{"key":"10.1016\/j.eswa.2011.01.029_b0205","doi-asserted-by":"crossref","first-page":"938","DOI":"10.1016\/j.ijrmms.2006.02.002","article-title":"Extending the Q system\u2019s prediction of support in tunnels employing fuzzy logic and extra parameters","volume":"43","author":"Tzamos","year":"2006","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0210","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1016\/j.ijrmms.2005.09.008","article-title":"Fuzzy models for analysis of rock mass displacements due to underground mining in mountainous areas","volume":"43","author":"Wenxiu","year":"2006","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.1016\/j.eswa.2011.01.029_b0215","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0266-352X(99)00024-5","article-title":"Fuzzy-random probabilistic analysis of rock mass responses to explosive loads","volume":"25","author":"Wu","year":"1999","journal-title":"Computers and Geotechnics"},{"key":"10.1016\/j.eswa.2011.01.029_b0220","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","article-title":"Fuzzy sets","volume":"8","author":"Zadeh","year":"1965","journal-title":"Information Control"},{"issue":"1","key":"10.1016\/j.eswa.2011.01.029_b0225","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1109\/TSMC.1973.5408575","article-title":"Outline of a new approach to the analysis of complex systems and decision processes","volume":"1","author":"Zadeh","year":"1973","journal-title":"IEEE Transactions on Systems, Man and Cybernetics"}],"container-title":["Expert Systems with Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0957417411000492?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0957417411000492?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2020,6,16]],"date-time":"2020-06-16T00:43:26Z","timestamp":1592268206000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0957417411000492"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,8]]},"references-count":42,"journal-issue":{"issue":"8","published-print":{"date-parts":[[2011,8]]}},"alternative-id":["S0957417411000492"],"URL":"https:\/\/doi.org\/10.1016\/j.eswa.2011.01.029","relation":{},"ISSN":["0957-4174"],"issn-type":[{"value":"0957-4174","type":"print"}],"subject":[],"published":{"date-parts":[[2011,8]]}}}