CERN Accelerating science

CERN Document Server 3 records found  Search took 0.83 seconds. 
1.
Status of the Long MQXFB Nb$_3$Sn Coil Prototype Production for the HiLumi LHC / Lackner, Friedrich (CERN) ; Ferracin, Paolo (CERN) ; Todesco, Ezio (CERN) ; Triquet, Stephan (CERN) ; Pozzobon, Marc (CERN) ; Luzieux, S (CERN) ; Perez, Juan Carlos (CERN) ; Scheuerlein, Christian (CERN) ; Cavanna, Eugenio (ASG Supercond., Genova) ; Ohnweiler, Timm (Carbolite Gero) et al.
The high luminosity Large Hadron Collider (LHC) upgrade target is to increase the integrated luminosity by a factor 10, resulting in an integrated luminosity of 3000 fb-1. One major improvement foreseen is the reduction of the beam size at the collision points. [...]
2017 - 5 p. - Published in : IEEE Trans. Appl. Supercond. 27 (2017) 4002605
In : Applied Superconductivity Conference, Denver, CO, USA, 4 - 9 Sep 2016, pp.4002605
2.
Fabrication of the 7.3 m long coils for the prototype of MQXFB, the Nb$_{3}$Sn low-b quadrupole magnet for the HiLumi LHC / Lackner, F (CERN) ; Ferracin, P (CERN) ; Ambrosio, G (Fermilab) ; Todesco, E (CERN) ; Duret, M (CERN) ; Triquet, S (CERN) ; Pozzobon, M (CERN) ; Luzieux, S (CERN) ; Perez, J C (CERN) ; Scheuerlein, C (CERN) et al.
The High luminosity LHC upgrade target is to increase the integrated luminosity by a factor 10, resulting in an integrated luminosity of 3000 fb-1. One major improvement foreseen is the reduction of the beam size at the collision points. [...]
FERMILAB-PUB-17-376-TD.- 2018 - 5 p.
- Published in : IEEE Trans. Appl. Supercond. 28 (2018) 4005605 Fulltext: PDF;
In : 25th International Conference on Magnet Technology, Amsterdam, The Netherlands, 27 Aug - 1 Sep 2017, pp.4005605
3.
Consolidation of the 13-kA Superconducting Magnet Circuits of the LHC at CERN / Lackner, F (CERN) ; Duret, M (CERN) ; Grand-Clement, L (CERN) ; Prin, H (CERN) ; Principe, R (CERN) ; Savary, F (CERN) ; Scheuerlein, C (CERN) ; Tock, J -Ph (CERN) ; Triquet, S (CERN) ; Verweij, A (CERN)
The first long shutdown (LS1) of the LHC machine at CERN started in February 2013. The main trigger for LS1 was the consolidation of the bus bar joints in the 13-kA superconducting magnet circuits. [...]
2015 - 5 p. - Published in : IEEE Trans. Appl. Supercond. 25 (2015) 4802305
In : Applied Superconductivity Conference 2014, Charlotte, NC, USA, 10 - 15 Aug 2014, pp.4802305

Veja também: nomes de autores similares
2 Duret, Max
Interested in being notified about new results for this query?
Set up a personal email alert or subscribe to the RSS feed.
Haven't found what you were looking for? Try your search on other servers:
Duret, M em Amazon
Duret, M em CERN EDMS
Duret, M em CERN Intranet
Duret, M em CiteSeer
Duret, M em Google Books
Duret, M em Google Scholar
Duret, M em Google Web
Duret, M em IEC
Duret, M em IHS
Duret, M em INSPIRE
Duret, M em ISO
Duret, M em KISS Books/Journals
Duret, M em KISS Preprints
Duret, M em NEBIS
Duret, M em SLAC Library Catalog
Duret, M em Scirus