default search action
Asia-Pacific Journal of Operational Research, Volume 22
Volume 22, Number 1, March 2005
- Gregory Levitin:
Optimal Version sequencing in Fault-Tolerant Programs. 1-18 - Izhar Ahmad, Z. Husain:
Nondifferentiable Second-Order Symmetric duality. 19-32 - Madhu Jain, Kriti Priya Gupta:
Software Reliability Issues under Operational and Testing Constraints. 33-50 - Kyong Joo Oh, Tae Hyup Roh, Myung Sang Moon:
Developing Time-Based Clustering Neural Networks to Use Change-Point Detection: Application to Financial Time Series. 51-70 - Tyrone T. Lin, Tung-Li Shih:
Applying Real Options and the Maximum NPV Rule to Market entry/Exit Strategies. 71-84 - L. Zeng, H. L. Ong, Kien Ming Ng:
An Assignment-Based Local Search Method for Solving Vehicle Routing Problems. 85-104 - Venkata S. S. Yadavalli, Andriëtte Bekker, J. Pauw:
Bayesian Study of a Two-Component System with Common-Cause shock Failures. 105-120 - Maw-Sheng Chern, Ya-Lan Chan, Jinn-Tsair Teng:
A Comparison among Various inventory shortage Models for deteriorating items on the Basis of Maximizing Profit. 121-134
Volume 22, Number 2, June 2005
- Chan-Kyoo Park, Woo-Je Kim, Soondal Park:
On the Properties of ∊-sensitivity Analysis for Linear Programming. 135-152 - Subrata Mitra:
An Algorithm for the generalized Vehicle Routing Problem with Backhauling. 153-170 - Andrew J. Higgins:
A Percentile Search Heuristic for generalized Assignment Problems with a Very Large Number of Jobs. 171-188 - Luis Augusto San-José, Joaquín Sicilia, Juan García-Laguna:
An inventory System with Partial backlogging Modeled According to a Linear Function. 189-210 - Horng-Jinh Chang, Chung-Yuan Dye:
The Effect of Credit Period on the Optimal lot Size for deteriorating items with Time varying Demand and deterioration Rates. 211-228 - Runzi Luo, Shijie Sun:
Semi-on-Line Scheduling Problem for Maximizing the Minimum Machine Completion Time on Three Special Uniform Machines. 229-238 - R. Arumuganathan, K. S. Ramaswami:
Analysis of a Bulk Queue with Fast and Slow Service Rates and Multiple vacations. 239-260 - Regina Berretta, Paulo Morelato França, Vinícius Amaral Armentano:
Metaheuristic Approaches for the Multilevel Resource-Constrained lot-sizing Problem with setup and lead times. 261-286
Volume 22, Number 3, September 2005
- Venkata S. S. Yadavalli, M. Jeeva, Rajalakshmi Rajagopalan:
Multi-Item Deterministic Fuzzy inventory Model. 287-296 - Tatjana Davidovic, Pierre Hansen, Nenad Mladenovic:
Permutation-Based Genetic, Tabu, and Variable Neighborhood Search Heuristics for Multiprocessor Scheduling with Communication delays. 297-326 - Yumei Hou, Hanqin Zhang:
Performance Analysis on a Complex remanufacturing System. 327-348 - Toshiyuki Sueyoshi:
Financial Ratio Analysis of the Electric Power Industry. 349-376 - James L. Corner, Les R. Foulds:
Scheduling the Harvesting Operations of a Forest Block: a Case Study. 377-390 - Bertrand M. T. Lin, J. M. Wu:
A Simple Lower Bound for total Completion Time Minimization in a Two-Machine flowshop. 391-408 - Srinivas R. Chakravarthy, Stefanka S. Chukova:
A Finite Capacity Resequencing Model with Markovian arrivals. 409-444
Volume 22, Number 4, December 2005
- Yakov Zinder, Gaurav Singh:
Preemptive Scheduling on Parallel Processors with due dates. 445-462 - Zhen-Jun Shi, Jie Shen:
Convergence Property and Modifications of a Memory Gradient Method. 463-478 - Bhavin J. Shah, Nita H. Shah, Y. K. Shah:
Eoq Model for Time-Dependent deterioration Rate with a temporary Price discount. 479-486 - Shinn Sun, Wen-Min Lu:
Evaluating the Performance of the Taiwanese Hotel Industry using a Weight slacks-Based Measure. 487-512 - Toshiyuki Sueyoshi:
A Methodological Comparison between Standard and Two Stage Mixed Integer Approaches for Discriminant Analysis. 513-528 - Xia Li, Xiongda Chen:
Global convergence of Shortest-Residual Family of conjugate Gradient Methods without Line Search. 529-538 - Shibaji Panda, K. Banerjee, Manjusri Basu:
Determination of EOQ of Multi-Item inventory Problems through nonlinear Goal Programming with penalty Function. 539-554 - Jau-Chuan Ke, Chuen-Horng Lin:
A Markov repairable System involving an Imperfect Service Station with Multiple vacations. 555-
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.