default search action
Computers & Operations Research, Volume 16
Volume 16, Number 1, 1989
- Bryan L. Deuermeyer, Guy L. Curry:
On a language for discrete dynamic programming and a microcomputer implementation. 1-11 - Michael D. Oliff, Holly S. Lewis, Robert E. Markland:
Aggregate planning in crew-loaded production environments. 13-25 - Israel Spiegler, Yehuda Noff:
Dynamic reliability as an alternative to overall data base restoration. 27-38 - Lawrence Bodin, Judy Brown:
A model for the allocation of graduate assistant hours: an anecdote on the application of operations research. 39-43 - Lawrence Bodin, George Fagin, Ron Welebny, James Greenberg:
The design of a computerized sanitation vehicle routing and scheduling system for the town of oyster bay, new york. 45-54 - Jati K. Sengupta:
Nonlinear measures of technical efficiency. 55-65 - Jean Aubin, Jacques A. Ferland:
A large scale timetabling problem. 67-77 - Ue-Pyng Wen, Shuh-Tzy Hsu:
A note on a linear bilevel programming algorithm based on bicriteria programming. 79-83
Volume 16, Number 2, 1989
- Wojciech Szpankowski:
Some remarks on uniformly bounded markov chains: multimodality analysis. 85-99 - Bart van Arem:
Discrete time analysis of a slotted transmission system. 101-111 - Guoliang Xue:
On the convergence of one-dimensional simplex search. 113-116 - Behnam Malakooti:
Ranking multiple criteria alternatives with half-space, convex, and non-convex dominating cones: quasi-concave and quasi-convex multiple attribute utility functions. 117-127 - Richard M. Burton, Børge Obel:
Using historical information in the design of a decentralized firm's budgetary planning system. 129-143 - Jonathan F. Bard, Jeanne L. Miller:
Probabilistic shortest path problems with budgetary constraints. 145-159 - P. Simin Pulat:
A decomposition algorithm to determine the maximum flow in a generalized network. 161-172 - Irvin Lustig:
An analysis of an available set of linear programming test problems. 173-184 - Douglas J. White:
The "largest element first" heuristic for the maximization assignment problem. 185-187
Volume 16, Number 3, 1989
- Eng Ung Choo, Gin Hor Chan:
Eyeballing heuristics for dynamic lot size problems. 189-193 - Wojtek Michalowski, Tomasz Szapiro:
A procedure for worst outcomes displacement in multiple criteria decision making. 195-206 - A. Ariav, Yehuda Kahane, Charles S. Tapiero:
A pooled computer center as a risk management tool. 207-216 - Andre B. Bondi:
An analysis of finite capacity queues with priority scheduling and common or reserved waiting areas. 217-233 - Hasan Pirkul, Yu-Ping Hou:
Allocating primary and back-up copies of databases in distributed computer systems: A model and solution procedures. 235-245 - Krishnamurty Muralidhar, Marietta J. Tretter:
The evolution of an expert DSS for electric utility load research. 247-256 - Cheng-I Yang, Jia-Shung Wang, Richard Chia-Tung Lee:
A branch-and-bound algorithm to solve the equal-execution-time job scheduling problem with precedence constraint and profile. 257-269 - Tep Sastri, Benito Flores, Juan Valdés:
Detecting points of change in time series. 271-293
Volume 16, Number 4, 1989
- R. K. Arora, R. K. Sachdeva:
Distributed simulation of resource constrained project scheduling. 295-304 - Richard A. Murphy:
An improved direct descent algorithm for binary knapsack problems. 305-313 - Mahmut Parlar, Yigal Gerchak:
Control of a production system with variable yield and random demand. 315-324 - R. P. Hope, John A. Sharp:
The use of two planning decision support systems in combination for the redesign of an MBA information technology programme. 325-332 - Tapan Sen, Parthasarati Dileepan, Jatinder N. D. Gupta:
The two-machine flowshop scheduling problem with total tardiness. 333-340 - Jayprakash G. Patankar, Amitava Mitra:
A multi-objective model for warranty cost estimation using multiple products. 341-351 - Tom M. Cavalier, James P. Ignizio, Allen L. Soyster:
Discriminant analysis via mathematical programming: Certain problems and their causes. 353-362 - Mahesh C. Gupta, C. Judt, Yash P. Gupta, Siddhartha Balakrishnan:
Expert scheduling system for a prototype flexible manufacturing cell: a framework. 363-378 - Jay E. Aronson, B. David Chen:
A primary/secondary memory implementation of a forward network simplex algorithm for multiperiod network flow problems. 379-391 - Cliff T. Ragsdale, Antonie Stam:
A note on solving quadratic programs using mixed-integer programming. 393-395
Volume 16, Number 5, 1989
- Vahid Lotfi:
A labeling algorithm to solve the assignment problem. 397-408 - Y. L. Chen, Y. H. Chin:
Scheduling unit-time jobs on processors with different capabilities. 409-417 - Yash P. Gupta, Tor Guimaraes, T. S. Raghunathan:
Personal computing problems and some organizational factors: A multivariate analysis. 419-430 - Kyung Y. Jo:
A lagrangian algorithm for computing the optimal service rates in Jackson queuing networks. 431-440 - Vernon Rego, Wojciech Szpankowski:
The presence of exponentiality in entropy maximized M/GI/1 queues. 441-449 - Jean-Yves Potvin, Guy Lapalme, Jean-Marc Rousseau:
Alto: A computer system for the design of vehicle routing algorithms. 451-470 - Thuruthickara C. John:
Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty. 471-479 - Stephen A. Floyd, Charles F. Turner III, K. Roscoe Davis:
Model-based decision support systems: An effective implementation framework. 481-491 - Norman P. Archer:
Electronic spreadsheet structures. 493-496
Volume 16, Number 6, 1989
- Edward A. Wasil, Bruce L. Golden, Li Liu:
State-of-the-art in nonlinear optimization software for the microcomputer. 497-512 - Fatemeh Zahedi:
Quantitative evaluation of micro versus larger database products. 513-532 - Veena Adlakha, Tigineh Mersha:
Two heuristic techniques for service location: An evaluation and comparison. 533-540 - Sang O. Kim, Marc J. Schniederjans:
Heuristic framework for the resource constrained multi-project scheduling problem. 541-556 - Marc J. Schniederjans, Radhika Santhanam:
A zero-one goal programming approach for the journal selection and cancellation problem. 557-565 - Yash P. Gupta, David C. W. Chin:
Expert systems and their applications in production and operations management. 567-582 - C. R. Bector, Yash P. Gupta, Mahesh Chander Gupta:
V-shape property of optimal sequence of jobs about a common due date on a single machine. 583-588 - Wen Lea Pearn:
Approximate solutions for the capacitated arc routing problem. 589-600
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.