Abstract
The term ‘risk management’ implies that risk is something which can be quantified, predicted and controlled. This paper seeks to demonstrate the limits of this assumption where complex projects are involved. The argument is based upon a case study of a failed £80 million IT venture known as Taurus. Analysis focuses upon the relationship between politics and the assumption of risk. Acceptance of risk, it is argued, is ultimately determined by the balance of power between decision makers. Moreover, risk analysis and other techniques of management may actually compound the difficulties by fostering an illusion of control and escalation. The implications for project management are discussed.
Similar content being viewed by others
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Drummond, H. The politics of risk: trials and tribulations of the Taurus project. J Inf Technol 11, 347–357 (1996). https://doi.org/10.1057/jit.1996.8
Published:
Issue Date:
DOI: https://doi.org/10.1057/jit.1996.8