Flood Control Act of 1917: Difference between revisions
KolbertBot (talk | contribs) m Bot: HTTP→HTTPS |
→References: Added Woodrow Wilson navbox Tag: Disambiguation links added |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|United States federal law}} |
|||
{{For|other versions of the '''Flood Control Act'''|Flood Control Act}} |
{{For|other versions of the '''Flood Control Act'''|Flood Control Act}} |
||
The '''Flood Control Act of 1917''' ("''' |
The '''Flood Control Act of 1917''' ("'''Ransdell–Humphreys Flood Control Act of 1917'''", Ch 144, {{USStat|39|948}}, enacted March 1, 1917<ref>{{Cite web |url=http://www.mvd.usace.army.mil/mrc/history/AppendixD.htm |title=Flood Control Act of 1917, USACE Mississippi Valley Division |access-date=2008-08-11 |archive-url=https://web.archive.org/web/20080917105820/http://www.mvd.usace.army.mil/mrc/history/AppendixD.htm |archive-date=2008-09-17 |url-status=dead }}</ref>) is an [[Act of Congress]] enacted in response to costly floods in the lower [[Mississippi Valley]], the Northeast, and the Ohio Valley between 1907 and 1913.<ref>[http://www.usace.army.mil/publications/eng-pamphlets/ep870-1-29/entire.pdf History of the 1936 Flood Control Act, Eng Pam 870-1-29, US Army Corps of Engineers] {{webarchive|url=https://web.archive.org/web/20070823024822/http://www.usace.army.mil/publications/eng-pamphlets/ep870-1-29/entire.pdf |date=2007-08-23 }}</ref> |
||
==Legislative |
==Legislative provisions== |
||
It was enacted to control floods on the Mississippi River, the Ohio River, and the Sacramento River, not to exceed in the aggregate $45,000,000, with not more than $10,000,000 during any one fiscal year. |
It was enacted to control floods on the Mississippi River, the Ohio River, and the Sacramento River, not to exceed in the aggregate $45,000,000, with not more than $10,000,000 during any one fiscal year. |
||
Line 14: | Line 15: | ||
Other watercourses connected with the Mississippi River could, in the discretion of the commission, also be improved. |
Other watercourses connected with the Mississippi River could, in the discretion of the commission, also be improved. |
||
Upon the completion of any levee constructed for flood control under authority of this Act, |
Upon the completion of any levee constructed for flood control under authority of this Act, the levee was to be turned over to the levee district protected for maintenance; but for all other purposes the United States retained control upon completion. |
||
The act also required comprehensive studies of the watersheds as to the extent and character of the area to be affected by the proposed improvement, the probable effect upon any navigable water or waterway, possible economical development and utilization of water power, and other uses properly related to or coordinated with the project. All reports on preliminary examinations authorized, together with the report of the [[Board of Engineers for Rivers and Harbors]] were to be submitted to the Secretary of War by the Chief of Engineers and transmitted to the House of Representatives. |
The act also required comprehensive studies of the watersheds as to the extent and character of the area to be affected by the proposed improvement, the probable effect upon any navigable water or waterway, possible economical development and utilization of water power, and other uses properly related to or coordinated with the project. All reports on preliminary examinations authorized, together with the report of the [[Board of Engineers for Rivers and Harbors]] were to be submitted to the Secretary of War by the Chief of Engineers and transmitted to the House of Representatives. |
||
Line 27: | Line 28: | ||
{{reflist}} |
{{reflist}} |
||
* {{ExecutiveOrder|10584}} (1954): [https://www.archives.gov/federal-register/codification/executive-order/10584.html Prescribing rules and regulations relating to the administration of the Watershed Protection and Flood Prevention Act] |
* {{ExecutiveOrder|10584}} (1954): [https://www.archives.gov/federal-register/codification/executive-order/10584.html Prescribing rules and regulations relating to the administration of the Watershed Protection and Flood Prevention Act] |
||
{{Woodrow Wilson}} |
|||
[[Category:1917 in the environment]] |
[[Category:1917 in the environment]] |
||
[[Category:1917 in law]] |
[[Category:1917 in American law]] |
||
[[Category:1917 in the United States]] |
|||
[[Category:Flood control acts in the United States|1917]] |
[[Category:Flood control acts in the United States|1917]] |
Latest revision as of 18:56, 17 January 2024
The Flood Control Act of 1917 ("Ransdell–Humphreys Flood Control Act of 1917", Ch 144, 39 Stat. 948, enacted March 1, 1917[1]) is an Act of Congress enacted in response to costly floods in the lower Mississippi Valley, the Northeast, and the Ohio Valley between 1907 and 1913.[2]
Legislative provisions
[edit]It was enacted to control floods on the Mississippi River, the Ohio River, and the Sacramento River, not to exceed in the aggregate $45,000,000, with not more than $10,000,000 during any one fiscal year.
All money appropriated under the act was expended under the direction of the Secretary of War in accordance with the plans, specifications, and recommendations of the Mississippi River Commission as approved by the Chief of Engineers. It included surveys and estimates to determine the cost of protecting the Mississippi River basin from floods. It also provided for the salaries, clerical, office, traveling, and miscellaneous expenses of the Mississippi River Commission.
Local interests protected thereby were to contribute not less than one-half of the cost of construction. At the completion of any levee building, the levees were to be locally maintained with the Federal Government retaining control.
No money was to be expended for any right of way for any levee which may be constructed in cooperation with any State or levee district under authority of this Act, but all such rights of way shall be provided free of cost to the United States.
Other watercourses connected with the Mississippi River could, in the discretion of the commission, also be improved.
Upon the completion of any levee constructed for flood control under authority of this Act, the levee was to be turned over to the levee district protected for maintenance; but for all other purposes the United States retained control upon completion.
The act also required comprehensive studies of the watersheds as to the extent and character of the area to be affected by the proposed improvement, the probable effect upon any navigable water or waterway, possible economical development and utilization of water power, and other uses properly related to or coordinated with the project. All reports on preliminary examinations authorized, together with the report of the Board of Engineers for Rivers and Harbors were to be submitted to the Secretary of War by the Chief of Engineers and transmitted to the House of Representatives.
See also
[edit]For related legislation which sometime also implement flood control provisions, see also the following:
- Rivers and Harbors Act
- Water Resources Development Act
- Watershed Protection and Flood Prevention Act of 1954
References
[edit]- ^ "Flood Control Act of 1917, USACE Mississippi Valley Division". Archived from the original on 2008-09-17. Retrieved 2008-08-11.
- ^ History of the 1936 Flood Control Act, Eng Pam 870-1-29, US Army Corps of Engineers Archived 2007-08-23 at the Wayback Machine