Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:25:20 UTC

CB.5:12 - Relations

  • Uses CB.1–CB.4: a worthwhile contribution, first exchange, supported entry and suitable shared activity.
  • Uses OCE.6 (OCE.6:4): actual assignments and enabling relations when required.
  • Uses OPS.6 (OPS.6:4): a permissible next action, its performance evidence and the returned case result.
  • Uses SYSE.2 (SYSE.2:4.3): connected use and system-concept proposals for co-design contributions.
  • Uses MNT.1 (MNT.1:4): the bounded technical-maintenance question, operating conditions and relevant control.
  • Uses HCD and Learning Product LPF: learning and publication contributions when those are needed.
  • Returns to Method development in Core (FPF C.39) or Research Method Practice (RMP): an unavailable professional method or an unresolved inquiry needed by the contribution.