Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-18 21:11:39 UTC · snapshot created 2026-11-18 21:12:35 UTC · last check 2026-11-18 22:40:20 UTC

CGOV.9:5 - Archetypal Grounding

CGOV.9:5.1 - Two approvals that use one unverified instruction

In a constructed payment operation, a clerk can change a supplier’s bank details. A second employee approves the payment but checks only the invoice amount. Both rely on the same incoming message for the new account. The identified exposure is payment to an account that the supplier did not designate.

Adding a third amount approval leaves that exposure. The selected control instead confirms a bank-detail change through a previously established supplier contact and separates that confirmation from release of the payment. The confirmer needs the established contact information and authority to hold the change; the releaser needs the confirmed result.

A walkthrough reveals that confirmation uses the new contact number entered from the same change request. The confirmer could therefore reach a destination supplied by the unverified instruction. The team restores use of the previously established supplier contact and protects its update route before relying on the control. After implementation, observations of confirmations can show whether the established contact is used.

CGOV.9:5.2 - Detection after the useful response window

A small organization reviews payment discrepancies monthly. A new service makes payments irreversible within hours. The existing review can still explain a past discrepancy, but its timing cannot provide the intended early containment.

The practitioner separates those uses. Retain the review where it remains useful, and compare a permitted pre-release control or timely alert and response for the irreversible exposure. If no feasible permitted response meets the needed protection, report that limitation before treating the new service as adequately controlled.